Filter interviews by
Unilateral tolerance refers to the acceptance of differences by one party, while bilateral tolerance refers to mutual acceptance.
Unilateral tolerance is when one party accepts differences without expecting the other party to reciprocate.
Bilateral tolerance is when both parties accept differences and respect each other's beliefs and values.
Unilateral tolerance can lead to a power imbalance in a relationship.
Bilateral to...
Top trending discussions
I applied via Campus Placement and was interviewed in Jun 2024. There were 3 interview rounds.
Pure Electronics MCQ of 30 min &. 30 min of Aptitude , Reasoning and English.
level of questions are gate level
A project is a temporary endeavor with a specific goal, timeline, and budget.
Projects have defined objectives and deliverables.
They involve a team of people working together towards a common goal.
Projects have a start and end date, and are unique in nature.
Examples: building a new website, launching a marketing campaign, developing a new product.
CAN protocol is a communication protocol used in automotive and industrial applications for high-speed data transmission.
CAN stands for Controller Area Network
It is a message-based protocol
Allows multiple electronic control units (ECUs) to communicate with each other without a host computer
Commonly used in automotive industry for communication between various components like engine control units, sensors, and actuators
UART is a serial communication protocol with one transmitter and one receiver, while SPI is a synchronous serial communication protocol with one master and multiple slaves.
UART stands for Universal Asynchronous Receiver/Transmitter, while SPI stands for Serial Peripheral Interface.
UART uses two communication lines (TX and RX) for data transfer, while SPI uses four communication lines (MISO, MOSI, SCK, and SS).
UART is a...
I applied via Campus Placement and was interviewed in Jun 2024. There were 3 interview rounds.
Pure Electronics MCQ of 30 min &. 30 min of Aptitude , Reasoning and English.
level of questions are gate level
A project is a temporary endeavor with a specific goal, timeline, and budget.
Projects have defined objectives and deliverables.
They involve a team of people working together towards a common goal.
Projects have a start and end date, and are unique in nature.
Examples: building a new website, launching a marketing campaign, developing a new product.
CAN protocol is a communication protocol used in automotive and industrial applications for high-speed data transmission.
CAN stands for Controller Area Network
It is a message-based protocol
Allows multiple electronic control units (ECUs) to communicate with each other without a host computer
Commonly used in automotive industry for communication between various components like engine control units, sensors, and actuators
UART is a serial communication protocol with one transmitter and one receiver, while SPI is a synchronous serial communication protocol with one master and multiple slaves.
UART stands for Universal Asynchronous Receiver/Transmitter, while SPI stands for Serial Peripheral Interface.
UART uses two communication lines (TX and RX) for data transfer, while SPI uses four communication lines (MISO, MOSI, SCK, and SS).
UART is a...
posted on 2 Feb 2024
I applied via Naukri.com
posted on 13 Feb 2023
I applied via Walk-in
Elasticity is the ability of a material to return to its original shape after being stretched or compressed. It is important in rubber for its ability to absorb shock and provide flexibility.
Rubber is a highly elastic material due to its long polymer chains that can stretch and return to their original shape.
Elasticity in rubber is important for its use in tires, where it allows the tire to absorb shock and maintain co...
Thre is third party role as MHR contract
posted on 20 Jun 2022
I applied via Referral and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 21 Apr 2021
posted on 19 Nov 2020
Production/quality refers to the process of manufacturing goods or delivering services that meet certain standards and specifications.
Production involves the creation of goods or the delivery of services.
Quality refers to the degree of excellence or superiority of the goods or services.
Production and quality are closely linked as the goal is to produce high-quality goods or services efficiently.
Quality control measures...
To ensure production as per plan, proper planning, scheduling, monitoring, and control are necessary.
Develop a detailed production plan based on demand forecast and capacity analysis
Schedule production activities and allocate resources accordingly
Monitor production progress regularly and identify any deviations from the plan
Implement corrective actions to bring production back on track
Ensure effective communication and...
Quality can be handled by implementing a quality management system and ensuring adherence to standards.
Establish a quality management system
Define quality standards and metrics
Train employees on quality control procedures
Conduct regular quality audits
Implement corrective actions when necessary
Work study is the analysis of work methods and processes to improve efficiency. Layout study is the analysis of physical arrangement of workspaces.
Work study involves analyzing work methods and processes to identify areas for improvement in terms of efficiency and productivity.
Layout study involves analyzing the physical arrangement of workspaces to optimize workflow and minimize wasted time and effort.
Both work study ...
Tolerance is the acceptable range of variation in a measurement or dimension. Limits are the maximum and minimum values within that range.
Tolerance is important in manufacturing to ensure that parts fit together properly.
Limits are used to define the acceptable range of variation.
Tolerance and limits are often specified in engineering drawings and blueprints.
For example, a part may have a tolerance of +/- 0.1mm and lim...
posted on 18 Jun 2020
I applied via Walk-in and was interviewed before Jun 2019. There were 4 interview rounds.
Bevel gear is a type of gear used to transmit power between two shafts that are at an angle to each other.
Bevel gears have conical shape teeth and are used to change the direction of power transmission.
They are commonly used in differential gears of automobiles.
Bevel gears can be straight, spiral or hypoid depending on the angle between the shafts.
They are also used in power tools, printing presses, and marine applicat
Production is the process of creating goods or services, while quality refers to the level of excellence or superiority of those goods or services.
Production involves the creation of goods or services through various processes such as manufacturing, assembly, or construction.
Quality refers to the level of excellence or superiority of the goods or services produced, and can be measured through various metrics such as cu...
Junior Engineer
56
salaries
| ₹2 L/yr - ₹4 L/yr |
Quality Engineer
51
salaries
| ₹2 L/yr - ₹4 L/yr |
Production Engineer
48
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Senior Engineer
43
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Engineer
34
salaries
| ₹2.8 L/yr - ₹5.2 L/yr |
Tata Motors
Mahindra & Mahindra
Ashok Leyland
Bharat Forge