I applied via Company Website and was interviewed before Sep 2020. There were 4 interview rounds.
CT and PT transformers are used to measure high voltage and current in power systems.
CT stands for Current Transformer and PT stands for Potential Transformer.
CT transformers are used to measure high current in power systems and step down the current to a level that can be measured by instruments.
PT transformers are used to measure high voltage in power systems and step down the voltage to a level that can be measured ...
Induction motor works on the principle of electromagnetic induction to convert electrical energy into mechanical energy.
Consists of a stator and a rotor
Stator has a set of three-phase windings
Rotor is made up of conductive bars
When AC current is supplied to the stator, a rotating magnetic field is produced
This magnetic field induces a current in the rotor bars, which in turn produces a magnetic field
The interaction bet...
PLC stands for Programmable Logic Controller and SCADA stands for Supervisory Control and Data Acquisition.
PLC is a digital computer used for automation of electromechanical processes.
SCADA is a software system used for monitoring and controlling industrial processes.
PLC and SCADA are often used together in industrial automation systems.
PLC is used for controlling the process while SCADA is used for monitoring the proc...
Top trending discussions
posted on 18 Sep 2024
OEE can be calculated by multiplying Availability, Performance, and Quality.
Calculate Availability: (Operating Time - Downtime) / Operating Time
Calculate Performance: (Ideal Cycle Time * Total Count) / Operating Time
Calculate Quality: Good Count / Total Count
Multiply Availability, Performance, and Quality to get OEE
Example: Availability = (400 - 50) / 400 = 0.875, Performance = (2 * 350) / 400 = 1.75, Quality = 300 / 3
Implemented 5S methodology to improve efficiency and organization in the production line.
Implemented visual management tools to streamline workflow
Standardized work processes to reduce variability
Engaged employees in continuous improvement initiatives
Reduced waste by optimizing inventory management
Conducted regular Gemba walks to identify improvement opportunities
posted on 26 Sep 2024
Overall equipment effectiveness (OEE) is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying availability, performance, and quality rates.
It helps identify areas for improvement in production processes.
Example: If a machine has an availability of 90%, performance of 95%, and quality of 98%, the OEE would be 83.7%.
I applied via Indeed and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 9 Dec 2024
I applied via Campus Placement and was interviewed before Dec 2023. There was 1 interview round.
posted on 29 Sep 2022
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 15 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
Related basic knowledge
posted on 28 Nov 2023
I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.
Line balancing is the process of evenly distributing work tasks among production line workers to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity.
It involves analyzing the tasks required in a production process and assigning them to workers in a way that minimizes bottlenecks.
The goal is to achieve a smooth flow of work and ensure that no worker is overloaded while others are idle...
OEE stands for Overall Equipment Efficiency. It is a measure of how effectively a production line or machine is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality factors.
Availability measures the percentage of time the machine is available for production.
Performance measures the speed at which the machine operates compared to its maximum potential.
Quality measures the percentage of good-q...
I am a production engineer with experience in optimizing manufacturing processes and improving efficiency.
Experienced in analyzing production data and identifying areas for improvement
Proficient in using Lean and Six Sigma methodologies to streamline operations
Implemented cost-saving measures that resulted in a 20% reduction in production expenses
Collaborated with cross-functional teams to develop and implement new pro
Seeking new challenges and growth opportunities.
Looking for a company that aligns better with my career goals.
Seeking a more dynamic and innovative work environment.
Wanting to broaden my skill set and learn new technologies.
Desire for increased responsibility and leadership opportunities.
Company restructuring or downsizing.
Commute or relocation reasons.
Personal reasons or family commitments.
I applied via Walk-in and was interviewed in Jun 2023. There were 3 interview rounds.
based on 1 review
Rating in categories
Assistant Manager
7
salaries
| ₹5.8 L/yr - ₹10.2 L/yr |
Associate Manager
5
salaries
| ₹10 L/yr - ₹25 L/yr |
Business Controller
5
salaries
| ₹13.5 L/yr - ₹15.7 L/yr |
Production Engineer
5
salaries
| ₹3.4 L/yr - ₹4 L/yr |
Graduate Engineer Trainee (Get)
4
salaries
| ₹2.1 L/yr - ₹4.5 L/yr |
Vedanta Limited
Hindalco Industries
Tata Steel
JSW Steel