Filter interviews by
I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.
Top trending discussions
posted on 1 Mar 2024
I applied via Walk-in and was interviewed before Mar 2023. There were 3 interview rounds.
They have a test paper that you have to fill before meeting MD in final round
posted on 7 Nov 2019
The finishing process involves tiling, wall gypsum, plaster, and waterproofing with specific material proportions and properties.
The first step is to prepare the surface by cleaning and leveling it.
Waterproofing is done to prevent water damage to the walls and floors.
Gypsum plaster is used to create a smooth surface for painting or wallpapering.
Tiling involves laying tiles on the floor or walls using adhesive and grout...
Civil Site Engineer
14
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Site Engineer
12
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Safety Officer
9
salaries
| ₹2.1 L/yr - ₹5.2 L/yr |
Assistant Engineer
7
salaries
| ₹3 L/yr - ₹4.4 L/yr |
Site Supervisor
6
salaries
| ₹1.8 L/yr - ₹2.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GMR Group