Filter interviews by
I applied via Referral and was interviewed before Dec 2021. There were 3 interview rounds.
Interview form fill up,attach Acedamic certificate
I was previously assigned as a Logistics Manager at XYZ Company.
Managed end-to-end logistics operations, including transportation, warehousing, and inventory management.
Implemented cost-saving measures by optimizing routes and negotiating favorable contracts with suppliers.
Led a team of 10 logistics professionals and ensured smooth coordination between different departments.
Improved overall efficiency by implementing a...
I applied via Naukri.com and was interviewed before Oct 2021. There were 2 interview rounds.
posted on 4 Jul 2022
I applied via Recruitment Consultant and was interviewed in Sep 2017. There were 5 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 6 interview rounds.
My area of interest is strategic planning and business development.
Strategic planning
Business development
Market analysis
Competitive intelligence
Partnership and alliance building
The tool design process starts with understanding the requirements and creating a design concept.
Understand the requirements and specifications of the tool
Identify the purpose and functionality of the tool
Create a design concept based on the requirements
Consider factors such as ergonomics, materials, and manufacturing processes
Develop detailed drawings and specifications
Prototype and test the design
Make necessary adjus...
Rejected material is sent back to the supplier for replacement or refund.
Rejected material is documented with details of the rejection reason.
The supplier is informed about the rejection and asked for replacement or refund.
The rejected material is returned to the supplier for further action.
If necessary, a new purchase order is created for replacement material.
5S is a method for organizing a workplace for efficiency and effectiveness. FIFO stands for First In, First Out, a method of inventory management.
5S involves Sort, Set in order, Shine, Standardize, and Sustain to create a clean and organized work environment.
FIFO ensures that the oldest inventory items are used or sold first, reducing waste and spoilage.
Example of 5S: Sorting out unnecessary items in a store, arranging...
LS24 is the T-code for changing BIN location in SAP WM module.
T-code LS24 is used to change the storage bin location in SAP WM module.
This transaction allows users to easily update the storage bin location for materials in the warehouse.
Users can input the material number, plant, and storage bin details to make the necessary changes.
LS24 provides a user-friendly interface for managing bin locations efficiently.
Movement for changing storage location or shifting involves relocating items to a different area within a store or warehouse.
Organizing inventory in a more efficient manner
Updating records to reflect new storage locations
Physically moving items to their new designated areas
Ensuring proper labeling and tracking of relocated items
The process involves receiving materials, inspecting them, recording details, updating inventory, and generating a Goods Receipt Note (GRN).
Receive materials from suppliers
Inspect materials for quality and quantity
Record details of received materials
Update inventory system with new stock
Generate Goods Receipt Note (GRN) to confirm receipt
I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before May 2022. There were 3 interview rounds.
I am a highly motivated and experienced professional with a passion for innovation and problem-solving.
I have over 10 years of experience in project management, leading teams to successful outcomes.
I am skilled in developing and implementing strategies to improve efficiency and productivity.
I have a proven track record of delivering results in fast-paced and dynamic environments.
I am a strong communicator and collabora...
My current CTC is confidential.
I prefer not to disclose my current CTC as it is confidential.
I am open to discussing my salary expectations for this role.
I believe my skills and experience make me a strong candidate for this position.
I am willing to negotiate a fair compensation package based on the responsibilities and requirements of the role.
Expected CTC refers to the salary package that the candidate is expecting from the company.
CTC stands for Cost to Company
It includes all the benefits and perks that the company offers along with the salary
The expected CTC can vary based on the candidate's experience, skills, and the industry standards
It is important for the candidate to research and have a realistic expectation
Example: A candidate with 5 years of exper...
The production process flow of parts involves several stages from raw material to finished product.
Raw materials are sourced and inspected for quality
The materials are then processed through various stages such as cutting, shaping, and molding
Quality checks are performed at each stage to ensure the parts meet specifications
The finished parts are assembled and tested before being packaged and shipped
Critical to quality parameters are essential for process control. They are checked through various methods and require specific controls.
Critical to quality parameters are the key characteristics of a product or service that must be controlled to ensure customer satisfaction.
These parameters are checked through various methods such as statistical process control, inspection, and testing.
Controls required to maintain th...
Product parameters can change after undergoing a particular process.
The process can alter the physical, chemical, or biological properties of the product.
Examples include heat treatment, chemical reactions, and fermentation.
The changes can affect the product's quality, safety, shelf life, and nutritional value.
Product testing is necessary to ensure that the parameters meet the desired specifications.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Quality Engineer
60
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Bosch
UNO Minda
ZF Commercial Vehicle Control Systems
Endurance Technologies