Add office photos
Employer?
Claim Account for FREE

Rotostat Services

4.0
based on 174 Reviews
Filter interviews by

Vishwakarma Auto Parts Interview Questions and Answers

Updated 20 Feb 2024

Q1. How to check hydro test on heat exchanger

Ans.

To check hydro test on a heat exchanger, perform visual inspection, pressure testing, and leak testing.

  • Perform a visual inspection of the heat exchanger for any visible damages or defects.

  • Conduct a pressure test by filling the heat exchanger with water or another suitable test medium and gradually increasing the pressure to the specified test pressure.

  • Monitor the pressure for a specified duration to ensure it remains stable without any significant drop.

  • Perform leak testing by...read more

View 2 more answers

Q2. How many gasket in heat exchanger

Ans.

The number of gaskets in a heat exchanger varies depending on the design and size of the heat exchanger.

  • The number of gaskets in a heat exchanger can range from a few to hundreds, depending on the number of plates or tubes in the heat exchanger.

  • Plate heat exchangers typically have multiple gaskets between each plate, while shell and tube heat exchangers have gaskets between the tubes and the shell.

  • The number of gaskets also depends on the type of gasket used and the specific ...read more

View 3 more answers

Q3. How many heat exchanger

Ans.

The number of heat exchangers depends on the specific project requirements and design.

  • The number of heat exchangers can vary greatly depending on the size and complexity of the project.

  • It is common to have multiple heat exchangers in industrial plants and refineries.

  • The number of heat exchangers may also depend on the type of process being carried out.

  • For example, a petrochemical plant may have dozens of heat exchangers to facilitate various chemical reactions.

  • In contrast, a ...read more

View 2 more answers

Q4. How many step of risk assessment

Ans.

There are generally five steps in a risk assessment process.

  • Identify hazards and potential risks

  • Assess the likelihood and severity of each risk

  • Evaluate current control measures

  • Implement additional control measures if necessary

  • Review and monitor the effectiveness of control measures

View 1 answer
Discover Vishwakarma Auto Parts interview dos and don'ts from real experiences

Q5. Which asme code refer for hydrostatic & pneumatic

Ans.

The ASME B31.3 code is referred for hydrostatic testing and the ASME B31.1 code is referred for pneumatic testing.

  • ASME B31.3 code is the Process Piping Code and it provides guidelines for hydrostatic testing of process piping systems.

  • ASME B31.1 code is the Power Piping Code and it provides guidelines for pneumatic testing of power piping systems.

  • Hydrostatic testing involves filling the system with water or another suitable liquid and pressurizing it to check for leaks or stru...read more

Add your answer

Q6. Which asme code refer for repair work

Ans.

The ASME code for repair work depends on the specific type of equipment or structure being repaired.

  • ASME Section VIII Division 1 is commonly used for the repair of pressure vessels.

  • ASME B31.3 is often referenced for the repair of piping systems.

  • ASME Section IX provides guidelines for the repair of welding procedures and qualifications.

  • ASME PCC-2 provides guidance for the repair of equipment and piping in various industries.

  • The specific ASME code to refer for repair work shoul...read more

Add your answer

Q7. How many types of gears?

Ans.

There are several types of gears, including spur, helical, bevel, worm, rack and pinion, and planetary gears.

  • Spur gears have straight teeth and are the most common type.

  • Helical gears have angled teeth and produce less noise and vibration than spur gears.

  • Bevel gears are used to transmit power between shafts that are at an angle to each other.

  • Worm gears are used to transmit power at a right angle and have high gear ratios.

  • Rack and pinion gears are used to convert rotational mot...read more

Add your answer

Q8. Talk about WPS, ASME codes, welding consumables, material codes, Hydrotest,etc

Ans.

WPS, ASME codes, welding consumables, material codes, and Hydrotest are essential components in ensuring quality and safety in welding processes.

  • WPS stands for Welding Procedure Specification and outlines the necessary parameters for a specific welding process.

  • ASME codes are standards set by the American Society of Mechanical Engineers to ensure quality and safety in engineering practices.

  • Welding consumables refer to materials used in welding processes, such as electrodes, fi...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Vishwakarma Auto Parts

based on 10 interviews
Interview experience
4.5
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.7
 • 395 Interview Questions
3.9
 • 364 Interview Questions
4.0
 • 284 Interview Questions
3.8
 • 211 Interview Questions
3.9
 • 168 Interview Questions
3.7
 • 134 Interview Questions
View all
Top Rotostat Services Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter