Filter interviews by
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
Advance Excel spreadsheet communication skills and English speaking
HR Policy Is Very poor Not provide offer letter and salary structure only LOI not mentioned in CTC frauds employees please awareness
Top trending discussions
I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.
Quality Tools or 7QC tools are a set of techniques used for quality control and improvement in various industries.
Check sheets: Used to collect and analyze data in a systematic manner.
Pareto chart: Helps identify the most significant factors contributing to a problem.
Cause and effect diagram (Fishbone diagram): Used to identify and analyze potential causes of a problem.
Histogram: Represents data distribution visually.
S...
FMEA is required to identify and prioritize potential failure modes in a process or product.
Helps in identifying potential failure modes and their effects
Prioritizes failure modes based on severity, occurrence, and detection
Aids in developing preventive actions to mitigate risks
Improves overall process or product reliability and quality
Commonly used in industries like manufacturing, healthcare, and automotive
Drafting SOP involves outlining step-by-step procedures to ensure consistency and efficiency in operations.
Identify the process to be documented
Outline each step in detail
Include responsibilities, timelines, and quality standards
Review and revise SOP regularly
Seek input from relevant stakeholders
Provide training on SOP implementation
Failure Mode, Effect and Cause (FMECA) is a systematic method for identifying potential failure modes of a system, analyzing their effects, and determining their causes.
FMECA helps in identifying potential failure modes of a system
It analyzes the effects of these failure modes on the system
It determines the causes of these failure modes
FMECA is used in industries like automotive, aerospace, and manufacturing
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
I applied via Referral and was interviewed before Feb 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Jun 2021. There were 5 interview rounds.
I applied via Recruitment Consultant and was interviewed before Sep 2020. There were 3 interview rounds.
Yes, there are many project management software's available.
Some popular project management software's are Microsoft Project, Asana, Trello, Basecamp, and Jira.
These software's help in planning, organizing, and tracking tasks and projects.
They also allow collaboration among team members and provide real-time updates on project progress.
Some software's offer additional features like time tracking, budget management, and...
RPN stands for Risk Priority Number and is used in risk assessment to prioritize potential failures in a product or process.
RPN is calculated by multiplying the severity, occurrence, and detection ratings of a potential failure.
The severity rating is based on the potential impact of the failure on the product or process.
The occurrence rating is based on the likelihood of the failure occurring.
The detection rating is ba...
I applied via Recruitment Consultant and was interviewed before Apr 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Dec 2020. There was 1 interview round.
Quality of materials and products is ensured through various methods.
Establishing quality standards and procedures
Conducting regular inspections and tests
Collaborating with suppliers to ensure quality materials
Implementing corrective actions when necessary
Continuous improvement through data analysis and feedback
Training employees on quality control measures
I investigate production flaws by analyzing data, conducting root cause analysis, and implementing corrective actions.
Collect and analyze data on the production process
Conduct root cause analysis to identify the source of the flaw
Develop and implement corrective actions to prevent future flaws
Collaborate with production team to ensure corrective actions are effective
Document findings and actions taken for future refere
Implemented quality control procedures in a project for improving product reliability.
Identified critical areas for quality control and developed a plan
Conducted regular inspections and audits to ensure compliance
Implemented statistical process control to monitor and improve product quality
Collaborated with cross-functional teams to address quality issues and implement corrective actions
Trained employees on quality con
I applied via Recruitment Consultant and was interviewed in May 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Engineer
89
salaries
| ₹2.2 L/yr - ₹5.2 L/yr |
Engineer
64
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Senior Engineer
60
salaries
| ₹4 L/yr - ₹7.9 L/yr |
Assistant Manager
43
salaries
| ₹6.5 L/yr - ₹12 L/yr |
Production Engineer
41
salaries
| ₹2 L/yr - ₹5.7 L/yr |
Ag Industries
Toyoda Gosei Minda
Global Autotech
Mikuni