Upload Button Icon Add office photos

Filter interviews by

Riviera Home Furnishings Production Quality Control Engineer Interview Questions and Answers

Updated 9 Jun 2022

Riviera Home Furnishings Production Quality Control Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Product knowledge type questions

Interview Preparation Tips

Interview preparation tips for other job seekers - For ur work experience u are not hesitate to put your answer in other person and which field do u work so good preparation on this filed.

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Know about experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Awasam excellent great perfect

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. What are your salary expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - Production engineer,Shift incharge, shift supervisor
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Ask about technical knowledge
Round 3 - Technical 

(1 Question)

  • Q1. Ask about technical knowledge
Round 4 - One-on-one 

(1 Question)

  • Q1. HR round and salary discussion

I applied via Naukri.com and was interviewed before Nov 2021. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself?
  • Q2. How much did you get earlier?
Round 3 - Technical 

(3 Questions)

  • Q1. What is lean manufacturing
  • Ans. 

    Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.

    • Focuses on continuous improvement and waste reduction

    • Involves all employees in the process

    • Uses tools such as value stream mapping and 5S

    • Examples include Toyota Production System and Kaizen

  • Answered by AI
  • Q2. What is line balancing?
  • Ans. 

    Line balancing is the process of optimizing workloads across a production line to improve efficiency and reduce waste.

    • It involves analyzing the tasks required to complete a product and assigning them to workstations in a way that minimizes idle time and maximizes throughput.

    • Line balancing can help reduce bottlenecks and improve overall productivity.

    • It is commonly used in manufacturing and assembly line operations.

    • Examp...

  • Answered by AI
  • Q3. What was lead time in your previous company?
Round 4 - Technical 

(1 Question)

  • Q1. If company have all the resources and work is still not being done, what will be your action plan or how will you get the work done on floor?
  • Ans. 

    I would analyze the situation and identify the root cause of the problem before taking any action.

    • Conduct a thorough analysis of the situation to identify the root cause of the problem

    • Communicate with the team to understand their perspective and challenges

    • Develop a plan of action to address the root cause and improve productivity

    • Implement the plan and monitor progress to ensure success

    • Provide regular updates to managem

  • Answered by AI
Round 5 - HR 

(1 Question)

  • Q1. Salary negotiation and offer letter.

Interview Preparation Tips

Topics to prepare for Wakefit Production Engineer interview:
  • Lean Six Sigma
Interview preparation tips for other job seekers - Keep yourself brushed with lean tools and manufacturing principles.

I applied via Company Website and was interviewed before Apr 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About 5s kaizen 6 Sigma TQM 7 QC Tools 8D quality control
Round 3 - HR 

(1 Question)

  • Q1. About family and privious CTC and background
Round 4 - Documents verification 

(1 Question)

  • Q1. About all documents previous salary slip

Interview Preparation Tips

Interview preparation tips for other job seekers - Please improve your self in technical and good communication
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell us about the measurement ?
  • Ans. 

    Measurement is the process of quantifying or determining the size, amount, or degree of something.

    • Measurement involves using a standard unit of measurement to determine the value or magnitude of a physical quantity.

    • It is important in quality management to measure various aspects such as product dimensions, process parameters, and customer satisfaction.

    • Measurement can be done using various tools and techniques such as c...

  • Answered by AI
  • Q2. How solve the any problem ?
  • Ans. Problem solve with root cause study and CAPA, 8D, CAR, 5Why.
  • Answered Anonymously
  • Q3. What know about the quality tools ?
  • Ans. 

    Quality tools are techniques and methods used to measure, analyze, and improve the quality of products or processes.

    • Quality tools help identify and solve problems, make data-driven decisions, and monitor performance.

    • Examples of quality tools include Pareto charts, fishbone diagrams, control charts, and statistical process control.

    • These tools aid in root cause analysis, process improvement, risk assessment, and quality ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I am working in quality from 16 yrs. responsible for quality control, audit - system, process & products, 5S and documentation.

I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About yourself, oee, kaizen, 5s, line balancing, Manpower handling etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is normal. Telephonic interview.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Personal details
  • Q2. Salary discuss & benefit
Round 2 - Technical 

(2 Questions)

  • Q1. What is 5 s rules
  • Ans. 

    5S is a methodology for organizing a workplace, especially a shared workplace, to improve efficiency and effectiveness.

    • Sort: Separate needed tools, materials, and instructions from unneeded items.

    • Set in order: Arrange items so they are easy to use and label them to prevent mistakes.

    • Shine: Clean the workspace regularly to maintain standards and identify defects.

    • Standardize: Establish procedures and schedules to maintain...

  • Answered by AI
  • Q2. Who is Line manage

I applied via Naukri.com and was interviewed in Aug 2022. There were 7 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. What is this 5s and tpm
  • Ans. 

    5S is a workplace organization method and TPM is a maintenance strategy to maximize equipment effectiveness.

    • 5S focuses on organizing the workplace to improve efficiency and reduce waste

    • TPM aims to prevent equipment breakdowns and improve overall equipment effectiveness

    • Both are commonly used in manufacturing and production environments

  • Answered by AI
  • Q2. Tell me about your self
  • Q3. What is this kaizen and suggestion
  • Ans. 

    Kaizen is a Japanese term for continuous improvement while suggestion refers to proposing ideas for improvement.

    • Kaizen involves small, incremental changes to improve processes and increase efficiency.

    • Suggestion is the act of proposing ideas for improvement in a company or organization.

    • Both kaizen and suggestion are important for promoting a culture of continuous improvement in the workplace.

    • Examples of kaizen include i...

  • Answered by AI
  • Q4. What is this tpm and jh steps
  • Ans. 

    TPM stands for Total Productive Maintenance and JH steps refer to Job Hazard Analysis steps.

    • TPM is a maintenance strategy aimed at maximizing the productivity of equipment and minimizing downtime.

    • JH steps are a systematic process to identify and mitigate potential hazards in a job or task.

    • TPM involves proactive maintenance, autonomous maintenance, and focused improvement.

    • JH steps include identifying hazards, assessing ...

  • Answered by AI
  • Q5. What is this oee calculation
  • Ans. 

    OEE stands for Overall Equipment Effectiveness and is a metric used to measure manufacturing productivity.

    • OEE takes into account three factors: availability, performance, and quality.

    • It is calculated by multiplying these three factors together.

    • OEE can help identify areas for improvement in the manufacturing process.

    • For example, if a machine has low availability, it may need to be serviced more frequently.

    • Similarly, if ...

  • Answered by AI
  • Q6. What is this capa and poka yoke
  • Ans. 

    CAPA stands for Corrective and Preventive Action, while Poka Yoke is a Japanese term for mistake-proofing.

    • CAPA is a process used to identify, investigate, and resolve quality issues in a product or process.

    • Poka Yoke is a technique used to prevent errors from occurring in a process by designing the process in a way that makes it impossible to make a mistake.

    • Examples of Poka Yoke include using color coding or shapes to d...

  • Answered by AI
  • Q7. What is this torqe value
  • Ans. 

    Torque value is the measure of the twisting force applied to an object.

    • Torque is measured in units of force multiplied by distance, such as newton-meters or pound-feet.

    • It is important to use the correct torque value when tightening bolts to ensure proper function and safety.

    • Torque values can vary depending on the material and size of the object being tightened.

    • Examples of torque values include 80 Nm for a car's wheel l...

  • Answered by AI
  • Q8. What is this assembly processes
  • Ans. 

    Assembly processes refer to the methods used to put together individual components to create a finished product.

    • Assembly processes involve joining, fastening, and bonding components together

    • Common assembly processes include welding, soldering, and adhesive bonding

    • Assembly processes can be automated or done manually

    • The choice of assembly process depends on factors such as the materials being used and the desired strengt

  • Answered by AI
  • Q9. What is wsqc and swc and wes
  • Ans. 

    WSQC, SWC, and WES are all acronyms related to different types of quality control processes.

    • WSQC stands for Weekly Safety and Quality Control. It is a process used in manufacturing to ensure that products meet safety and quality standards.

    • SWC stands for Source Water Control. It is a process used in water treatment to ensure that the water being treated meets certain quality standards.

    • WES stands for Work Environment Sur...

  • Answered by AI
  • Q10. What is this kpi Instruction
  • Ans. 

    KPI stands for Key Performance Indicator. It is a measurable value that demonstrates how effectively a company is achieving its key business objectives.

    • KPIs are used to track progress towards specific goals and objectives

    • They help organizations to focus on what is important and make informed decisions

    • KPIs can be financial or non-financial, qualitative or quantitative

    • Examples of KPIs include revenue growth, customer sat

  • Answered by AI
  • Q11. What is this 7 qc tools
  • Ans. 

    The 7 QC tools are a set of basic quality control tools used to identify and solve quality problems.

    • Check sheets

    • Control charts

    • Histograms

    • Pareto charts

    • Scatter diagrams

    • Stratification

    • Cause-and-effect diagrams

  • Answered by AI
  • Q12. What is this line processing
  • Ans. 

    Line processing refers to the series of steps involved in manufacturing a product on a production line.

    • It involves a sequence of operations that transform raw materials into finished products

    • Each step in the process is carefully designed to optimize efficiency and quality

    • Examples include assembly lines in car manufacturing, food processing lines, and packaging lines in pharmaceuticals

    • Automation and robotics are increas

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No comments and discuss. It's work I am ready

Skills evaluated in this interview

Riviera Home Furnishings Interview FAQs

How many rounds are there in Riviera Home Furnishings Production Quality Control Engineer interview?
Riviera Home Furnishings interview process usually has 2 rounds. The most common rounds in the Riviera Home Furnishings interview process are Technical and Resume Shortlist.

Tell us how to improve this page.

Interview Questions from Similar Companies

Nilkamal Interview Questions
3.8
 • 56 Interviews
Wakefit Interview Questions
3.9
 • 50 Interviews
Greenply Interview Questions
3.8
 • 43 Interviews
Urban Ladder Interview Questions
3.7
 • 43 Interviews
Kurlon Interview Questions
4.3
 • 35 Interviews
Hettich Interview Questions
3.9
 • 31 Interviews
Godrej Interio Interview Questions
3.9
 • 27 Interviews
View all
Production Manager
5 salaries
unlock blur

₹4.1 L/yr - ₹16.3 L/yr

Shift Officer
5 salaries
unlock blur

₹3.3 L/yr - ₹4.8 L/yr

QA
5 salaries
unlock blur

₹4.4 L/yr - ₹7 L/yr

Store Incharge
5 salaries
unlock blur

₹4 L/yr - ₹5 L/yr

Senior Commercial Assistant
5 salaries
unlock blur

₹0.2 L/yr - ₹0.2 L/yr

Explore more salaries
Compare Riviera Home Furnishings with

Nilkamal

3.8
Compare

Kurlon

4.3
Compare

Greenlam Industries

4.2
Compare

Wakefit

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview