Filter interviews by
I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.
In my previous company, I was responsible for overseeing daily operations, managing a team of employees, and ensuring targets were met.
Managed a team of employees to ensure smooth operations
Implemented strategies to meet and exceed targets
Handled customer complaints and resolved issues efficiently
Maintain workers on shop floor by providing clear expectations, regular feedback, training opportunities, and a positive work environment.
Set clear expectations for performance and behavior
Provide regular feedback and recognition for good work
Offer training opportunities for skill development
Create a positive work environment with open communication and support
Address any issues or concerns promptly to prevent dissatis
Machine precautions and preventive maintenance are maintained by following strict protocols and schedules.
Regularly inspecting machines for any signs of wear or damage
Following manufacturer's guidelines for maintenance and servicing
Training employees on proper machine operation and maintenance procedures
Keeping a detailed record of maintenance activities and schedules
Implementing a preventive maintenance program to add...
Top trending discussions
posted on 2 Jun 2023
Aptitiude, Reasoning , EEE basic Questions
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Consists of two coils of wire, known as primary and secondary coils
Primary coil receives electrical energy and creates a magnetic field
Magnetic field induces a voltage in the secondary coil, transferring energy
Used in power distribution, voltage regulation, and electrical isolation
Exampl...
Mutual induction is the process where a changing current in one coil induces a voltage in another coil.
Mutual induction occurs when two coils are placed close to each other and the magnetic field produced by one coil induces a voltage in the other coil.
The induced voltage in the second coil is directly proportional to the rate of change of current in the first coil.
This phenomenon is the basis for the operation of tran...
Flux is the flow of electric or magnetic field lines through a surface, while current is the flow of electric charge.
Flux is a measure of the flow of a physical property through a given area.
In electromagnetism, flux refers to the flow of electric or magnetic field lines through a surface.
Current is the flow of electric charge through a conductor.
Flux and current are related through Faraday's law of electromagnetic ind
posted on 23 Jun 2023
I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.
DTR stands for Dead Time Recovery. It is a structure used in the oil and gas industry to separate gas and liquid phases.
DTR is typically made of steel or other corrosion-resistant materials.
The structure is designed to handle high pressure and temperature conditions.
Common materials used in the construction of DTR include carbon steel, stainless steel, and duplex stainless steel.
The choice of material depends on factor...
A Bucoz relay is a type of protective relay used in power systems to detect faults and isolate them to prevent damage.
Bucoz relay is a type of protective relay used in power systems.
It functions by detecting faults in the system and isolating them to prevent damage.
It helps in maintaining the stability and reliability of the power system.
Bucoz relay operates based on the principle of electromagnetic induction.
Examples ...
Pipe earthing of DTR involves using a metal pipe buried in the ground to provide a low-resistance path for fault currents.
Metal pipe is buried vertically in the ground near the DTR
The pipe is filled with alternate layers of charcoal and salt to improve conductivity
A copper wire is connected to the pipe and then to the DTR for grounding purposes
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in Mar 2021. There were 3 interview rounds.
Questions related to torque, gearbox, torque limiter and coupling failure, yawing system bearing, and accumulator.
Torque is a measure of rotational force.
Gearbox works by transmitting power from the engine to the wheels.
Torque limiter failure can be caused by overloading or overheating.
Coupling failure can be caused by misalignment or excessive torque.
Yawing system bearing is a type of roller bearing used to support th...
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
posted on 29 Nov 2022
I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
Basic Study
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
49
salaries
| ₹5 L/yr - ₹13.5 L/yr |
Senior Engineer
26
salaries
| ₹3.2 L/yr - ₹8.1 L/yr |
Production Engineer
26
salaries
| ₹2.8 L/yr - ₹5.1 L/yr |
Junior Supervisor
20
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Engineer
18
salaries
| ₹2.5 L/yr - ₹4.5 L/yr |
Dhoot Transmission
Sterlite Power
Doosan Power Systems
Inox Wind