I applied via Referral and was interviewed before Jan 2020. There were 4 interview rounds.
Processes required in any project include planning, execution, monitoring, and closing.
Planning involves defining project goals, scope, and resources.
Execution involves carrying out the plan and completing project tasks.
Monitoring involves tracking progress and making adjustments as needed.
Closing involves wrapping up the project and evaluating its success.
Examples of project processes include risk management, quality
Points to check in an invoice before processing
Check for accuracy of billing information
Verify the amount charged and ensure it matches the agreed upon price
Ensure all necessary supporting documents are attached
Check for any discounts or promotions that may apply
Verify the payment terms and due date
Ensure the invoice is addressed to the correct recipient
Check for any errors or discrepancies
I applied via Company Website and was interviewed before Nov 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
The aptitude test was 100% based on basic information learn in diploma
Properties of materials include physical, chemical, mechanical, thermal, and electrical characteristics.
Physical properties include color, density, melting point, and boiling point.
Chemical properties include reactivity, flammability, and corrosion resistance.
Mechanical properties include strength, hardness, elasticity, and ductility.
Thermal properties include conductivity, expansion coefficient, and specific heat capa...
Iron carbon diagram shows the phases of iron and carbon at different temperatures.
Iron carbon diagram is a graphical representation of the phases of iron and carbon at different temperatures.
It shows the different phases such as austenite, ferrite, cementite, and pearlite.
The diagram helps in understanding the microstructure of steel and its properties.
It is used in metallurgy to determine the heat treatment processes ...
Lean production system is a manufacturing philosophy that focuses on minimizing waste and maximizing efficiency.
It involves continuous improvement and elimination of non-value-added activities
It emphasizes on creating a pull-based system where production is based on customer demand
It involves the use of tools such as Kanban, 5S, and Kaizen
Examples of companies that use lean production system include Toyota, Nike, and I
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability is calculated by dividing the total operating time by planned production time.
Performance is calculated by dividing the actual production rate by the maximum production rate.
Quality is calculated by dividing the number of good units produced by the total number of units produced.
OEE = Availability x Performance x Quality
I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Jan 2022. There were 2 interview rounds.
Jon experience during special training
Company's expansion plan in India
I applied via Recruitment Consulltant and was interviewed before Oct 2023. There were 2 interview rounds.
Managing people during critical urgent production requires clear communication, prioritization, and support.
Communicate clearly with the team about the urgency of the situation and the tasks that need to be completed.
Prioritize tasks based on their impact on the production and allocate resources accordingly.
Provide support and resources to help the team meet the urgent production needs.
Stay calm and focused to lead by ...
I would address the controversy by promoting open communication, addressing the issue directly, and fostering a positive work environment.
Encourage open communication among the workers to address any misunderstandings or concerns.
Address the issue directly by talking to the individuals involved and getting to the root of the problem.
Promote a positive work environment by emphasizing teamwork, respect, and professionali...
LOB can be calculated by dividing the total revenue generated by a specific product or service by the total revenue of the company.
Calculate the total revenue generated by the specific product or service.
Calculate the total revenue of the company.
Divide the total revenue generated by the specific product or service by the total revenue of the company to get the LOB.
Example: If a product generates $100,000 in revenue an...
Deputy Manager
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant General Manager
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Application Support Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Motors
Tata Steel
Asian Paints
Maruti Suzuki