Upload Button Icon Add office photos

Filter interviews by

R.S Construction Builders & Engineers QA QC Engineer Interview Questions and Answers

Updated 14 Jun 2024

R.S Construction Builders & Engineers QA QC Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Call Interview 

(2 Questions)

  • Q1. Welding knowledge, LHS File some welding electrodes
  • Q2. PWHT, ASME Codes , Welding code, piping code, ndt code, material code.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. You can ask any questions related to my department
  • Q2. After reviewing my cV they may ask what is included in it
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Tool test and technical round
Round 3 - HR 

(1 Question)

  • Q1. Discussion with HR regarding package and joining date
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Mivan formwork process?
  • Ans. 

    Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.

    • Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.

    • It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.

    • The system allows for smooth finishes...

  • Answered by AI
  • Q2. Finishing process
  • Q3. Reinforcement related

I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Questions related to my work only. Like I mm interested in Tunnel, so question is from tunnel only.
  • Q2. Questions my CV also.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be bold be silent.
Just calm.
All well.

Interview Questionnaire 

1 Question

  • Q1. Questions on tunneling machines , batching plants
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Why will we hire you on this company?
  • Q2. Because i am capable of any challenging work given by company.

Interview Preparation Tips

Interview preparation tips for other job seekers - First of all fix on your goal. Secondly chose your right career path. Then do work harder on your chosen path.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Hajajakakakk sjs skskse sksksjs dd r d r d. E
  • Q2. Bsn s s d d d d. S d d. nsnsjsjsjsj
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is the weight of green concrete?
  • Ans. 

    The weight of green concrete varies depending on the mix design and components used.

    • The weight of green concrete typically ranges from 140 to 150 pounds per cubic foot.

    • Factors such as the type and amount of aggregates, cement, water, and admixtures used can affect the weight.

    • Lightweight concrete can have a lower weight, while high-density concrete can be heavier.

    • The weight of green concrete is important for structural

  • Answered by AI
  • Q2. What is the formula of tensile Strength of concrete?
  • Ans. 

    The formula for tensile strength of concrete is based on the cross-sectional area and maximum load applied.

    • Tensile Strength = Maximum Load / Cross-sectional Area

    • The units for tensile strength are typically in MPa (megapascals)

    • Tensile strength is an important property of concrete for determining its ability to resist tension forces

    • For example, if a concrete specimen with a cross-sectional area of 100 square millimeters ...

  • Answered by AI
  • Q3. What is the water cement ratio of concrete?
  • Ans. 

    The water cement ratio of concrete refers to the ratio of the weight of water to the weight of cement used in a concrete mix.

    • The water cement ratio is a crucial factor in determining the strength and durability of concrete.

    • A lower water cement ratio results in stronger and more durable concrete.

    • The ideal water cement ratio varies depending on the type of concrete mix and its intended use.

    • For example, a typical water ce...

  • Answered by AI
  • Q4. What is the is code of steel ?
  • Ans. 

    IS code of steel refers to the Indian Standard code for steel materials and products.

    • IS 2062:2011 - Steel for general structural purposes

    • IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement

    • IS 8500:1991 - Structural steel - Microalloyed (medium and high strength qualities)

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The Job seekers should be good knowledge his field.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. 1. Basic material properties cement , sand and Aggregate. 2. IS codes and standard 3. Site Execution related questions 4. Field test procedures. 5. Acceptance limit of test .

R.S Construction Builders & Engineers Interview FAQs

What are the top questions asked in R.S Construction Builders & Engineers QA QC Engineer interview?

Some of the top questions asked at the R.S Construction Builders & Engineers QA QC Engineer interview -

  1. PWHT, ASME Codes , Welding code, piping code, ndt code, material co...read more
  2. Welding knowledge, LHS File some welding electro...read more

Tell us how to improve this page.

R.S Construction Builders & Engineers QA QC Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Civil Site Engineer
22 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare R.S Construction Builders & Engineers with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

R.V.R. PROJECTS

4.0
Compare

ABCI Infrastructures

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview