Filter interviews by
I applied via Recruitment Consulltant
Basic English grammar test
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
The density of cement varies depending on the type of cement and its composition.
The density of ordinary Portland cement is around 3.15 g/cm³
The density of white cement is around 2.90 g/cm³
The density of low heat cement is around 3.0 g/cm³
The density of high alumina cement is around 3.0 g/cm³
The density of rapid hardening cement is around 3.15 g/cm³
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
posted on 31 Jan 2022
I applied via Naukri.com and was interviewed in Sep 2021. There were 4 interview rounds.
Technical and Aptitude Questions
posted on 19 Dec 2023
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
The number of dumpers and excavators needed for a 15 km project depends on various factors such as the type of material being transported and the size of the excavation area.
The number of dumpers needed for a 15 km project will depend on the volume and weight of material to be transported, as well as the capacity of each dumper.
The number of excavators required will depend on the size of the excavation area, the type o...
A lead is a potential customer or client who has shown interest in a product or service.
A lead is typically generated through marketing efforts such as advertising or networking.
Leads can be obtained through various channels such as social media, email campaigns, or trade shows.
Once a lead is identified, they are usually passed on to the sales team for further follow-up and conversion.
Qualifying leads involves determin...
The quantity done by 200 machines in an hour depends on the efficiency and capacity of each machine.
The quantity done will depend on the output capacity of each machine
Factors such as machine speed, efficiency, and type of work being done will also impact the quantity produced
For example, if each machine can produce 10 units per hour, then 200 machines will produce 2000 units in an hour
posted on 18 Jul 2023
posted on 3 Mar 2024
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
Project Details Work Assignment
HSE Officer
50
salaries
| ₹5 L/yr - ₹18 L/yr |
Mechanical Supervisor
47
salaries
| ₹4.2 L/yr - ₹13.2 L/yr |
Safety Officer
37
salaries
| ₹3 L/yr - ₹12 L/yr |
Mechanical Technician
37
salaries
| ₹3.5 L/yr - ₹10.1 L/yr |
Electrical Technician
28
salaries
| ₹0.6 L/yr - ₹10.1 L/yr |
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company
KEC International