Qatar Petroleum
10+ Aakar Foundry Interview Questions and Answers
Q1. How will you manage the equipment costing and also the quality ?
I will ensure equipment costing and quality by implementing cost-effective measures and adhering to industry standards.
Conducting regular equipment inspections to identify any potential issues
Implementing preventive maintenance measures to reduce equipment downtime
Ensuring that all equipment meets industry standards and regulations
Working closely with suppliers to negotiate favorable pricing and quality
Tracking equipment performance and costs to identify areas for improvement
Q2. What is the overhauling system of the equipments in your industry?
The overhauling system in our industry involves regular maintenance, inspections, and repairs to ensure optimal performance and prevent breakdowns.
Regular maintenance schedules are established for each piece of equipment
Inspections are conducted to identify any potential issues or areas of concern
Repairs are made as needed to address any problems found during inspections
Spare parts are kept on hand to minimize downtime
Equipment is tested after repairs to ensure it is function...read more
Q3. What are the Parts of the pumps and their functions?
Pumps have various parts such as impeller, casing, shaft, bearings, and seals that work together to transfer fluids.
Impeller: rotates to create centrifugal force and move fluid
Casing: contains the impeller and directs fluid flow
Shaft: connects the impeller to the motor
Bearings: support the shaft and reduce friction
Seals: prevent fluid leakage
Q4. What is the most purchasing part in the pump?
The impeller is the most purchasing part in the pump.
The impeller is responsible for transferring energy to the fluid being pumped.
It is typically made of metal and designed to rotate at high speeds.
The shape and size of the impeller can greatly affect the pump's performance.
Examples of impeller types include closed, semi-open, and open.
Impellers can also be made of different materials depending on the application, such as plastic or ceramic.
Q5. What is the full form SEP?
SEP stands for Safe Escape Plan.
SEP is a plan that outlines the procedures to be followed in case of an emergency.
It includes evacuation routes, assembly points, and emergency contacts.
SEP is important for ensuring the safety of personnel and minimizing damage to equipment.
Examples of emergencies that may require a SEP include fire, gas leaks, and natural disasters.
Q6. What is the full form STP?
STP stands for Standard Temperature and Pressure.
STP is a commonly used abbreviation in the field of engineering and science.
It refers to a set of standard conditions used for measuring and comparing various properties of gases.
The standard temperature is typically defined as 0 degrees Celsius or 273.15 Kelvin.
The standard pressure is usually defined as 1 atmosphere or 101.325 kilopascals.
STP is used to establish a baseline for calculations and experiments involving gases.
It ...read more
Q7. What are different lifting methods
Different lifting methods include crane lifting, forklift lifting, manual lifting, and hydraulic lifting.
Crane lifting: using a crane to lift heavy objects
Forklift lifting: using a forklift to lift and move materials
Manual lifting: lifting objects by hand
Hydraulic lifting: using hydraulic systems to lift heavy loads
Q8. Whats the weight of Topssides
The weight of Topssides varies depending on the specific project and design.
The weight of Topssides can range from hundreds to thousands of tons.
Factors that influence the weight include the size of the platform, materials used, equipment installed, and operational requirements.
For example, a small offshore platform may have a Topssides weight of around 500 tons, while a larger platform could weigh over 10,000 tons.
Q9. What is the oxygen percentage required before going to start root welding
Q10. What is the difference between Carbon steel pipeline and Clad overlay pipeline welding
Q11. Describe Offshore Operations
Offshore operations involve activities such as drilling for oil and gas, installing and maintaining platforms, and transporting resources via ships.
Offshore operations typically take place in bodies of water, such as oceans or seas.
Key activities include drilling for oil and gas reserves, installing and maintaining offshore platforms, and transporting resources via ships.
Offshore operations require specialized equipment and personnel to ensure safety and efficiency.
Challenges...read more
Q12. PEP and PES explanation
PEP stands for Project Execution Plan, which outlines the project scope, objectives, deliverables, schedule, and budget. PES stands for Project Execution Strategy, which details the approach to executing the project.
PEP is a comprehensive document that serves as a roadmap for the project, outlining key milestones and responsibilities.
PES focuses on the specific strategies and tactics that will be used to achieve the project objectives.
PEP typically includes sections on projec...read more
Q13. What is the technical integrity ?
Technical integrity refers to the quality of being complete, accurate, and reliable in terms of technical aspects.
Ensuring that all technical components work together seamlessly
Maintaining accurate and up-to-date technical documentation
Following best practices and standards in technical development
Regularly testing and validating technical systems
Preventing unauthorized access or modifications to technical systems
Q14. Below 100 ppm or 1%
Interview Process at Aakar Foundry
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month