Upload Button Icon Add office photos

Filter interviews by

PSK Infrastructures Highway Site Engineer Interview Questions and Answers

Updated 19 Feb 2025

PSK Infrastructures Highway Site Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. What is gradation for gsb
  • Ans. 

    Gradation for GSB refers to the particle size distribution of Granular Sub Base material.

    • Gradation for GSB is typically specified by the percentage of various particle sizes present in the material.

    • The gradation helps in determining the suitability of GSB for its intended use in road construction.

    • Common gradation requirements for GSB include limits on the percentage of fines, coarse aggregates, and other specific sizes...

  • Answered by AI
  • Q2. What is the width embankment top layer whose height from ogl is 6 meter
  • Ans. 

    The width of the embankment top layer can be calculated using trigonometry.

    • Use trigonometry to calculate the width of the embankment top layer.

    • The width can be calculated using the formula: width = 2 * height * tan(angle)

    • In this case, the angle is the angle of repose (ogl) which is typically around 30-45 degrees.

  • Answered by AI
  • Q3. What are the different types of seives for gradation for WMM purpose
  • Ans. 

    Different types of sieves for WMM gradation include 80mm, 40mm, 20mm, 10mm, and 4.75mm.

    • 80mm sieve

    • 40mm sieve

    • 20mm sieve

    • 10mm sieve

    • 4.75mm sieve

  • Answered by AI

PSK Infrastructures Interview FAQs

How many rounds are there in PSK Infrastructures Highway Site Engineer interview?
PSK Infrastructures interview process usually has 1 rounds. The most common rounds in the PSK Infrastructures interview process are Technical.
What are the top questions asked in PSK Infrastructures Highway Site Engineer interview?

Some of the top questions asked at the PSK Infrastructures Highway Site Engineer interview -

  1. What is the width embankment top layer whose height from ogl is 6 me...read more
  2. What are the different types of seives for gradation for WMM purp...read more
  3. What is gradation for ...read more

Tell us how to improve this page.

PSK Infrastructures Highway Site Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
ABC Consultants Interview Questions
3.9
 • 185 Interviews
Chegg Interview Questions
4.1
 • 155 Interviews
Tracxn Interview Questions
3.2
 • 100 Interviews
Testbook.com Interview Questions
3.6
 • 99 Interviews
MAQ Software Interview Questions
1.9
 • 97 Interviews
View all

PSK Infrastructures Highway Site Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

4.0

Salary

4.0

Job security

4.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Accounts Officer
6 salaries
unlock blur

₹3.5 L/yr - ₹4.5 L/yr

Senior Highway Engineer
5 salaries
unlock blur

₹6.2 L/yr - ₹6.6 L/yr

Senior Structural Engineer
4 salaries
unlock blur

₹5.4 L/yr - ₹7.2 L/yr

Structural Engineer
4 salaries
unlock blur

₹2.4 L/yr - ₹5.4 L/yr

Safety Officer
4 salaries
unlock blur

₹3.6 L/yr - ₹5.3 L/yr

Explore more salaries
Compare PSK Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview