Filter interviews by
I applied via Campus Placement and was interviewed in Mar 2024. There was 1 interview round.
Top trending discussions
I applied via Walk-in and was interviewed in Jan 2021. There was 1 interview round.
Prioritize tasks and delegate responsibilities based on urgency and importance.
Assess the workload and prioritize tasks based on urgency and importance
Delegate responsibilities to team members based on their strengths and workload
Cross-train employees to ensure flexibility in case of absences
Consider hiring temporary staff or outsourcing work if necessary
Minimum tests for piling include integrity testing, load testing, and pile driving analyzer (PDA) testing.
Integrity testing is done to ensure that the pile is free from defects and damage.
Load testing is done to determine the load capacity of the pile.
Pile driving analyzer (PDA) testing is done to measure the stresses and strains in the pile during driving.
Other tests may include crosshole sonic logging (CSL) and therm
I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.
10th level question with answers
About our work experience
I appeared for an interview before Nov 2020.
I applied via Recruitment Consultant and was interviewed before Jul 2020. There was 1 interview round.
Line voltage is higher than phase voltage in three-phase power systems.
Line voltage is the voltage between any two phases in a three-phase power system.
Phase voltage is the voltage between any one phase and the neutral point.
In a balanced three-phase system, line voltage is √3 times higher than phase voltage.
For example, if the phase voltage is 120V, the line voltage would be 208V.
The phase voltage is used to rate the ...
MCB - Miniature Circuit Breaker, ELCB - Earth Leakage Circuit Breaker, RCCB - Residual Current Circuit Breaker, MCCB - Molded Case Circuit Breaker, ACB - Air Circuit Breaker
MCB: Protects electrical circuits from overcurrents and short circuits
ELCB: Detects and protects against leakage current to prevent electric shock
RCCB: Provides protection against residual current and earth faults
MCCB: Offers protection against over...
The capacity of a thermal plant varies depending on the size and type of the plant.
The capacity of a thermal plant can range from a few megawatts to several gigawatts.
Factors that determine the capacity of a thermal plant include the type of fuel used, the efficiency of the plant, and the size of the plant.
For example, a small coal-fired thermal plant may have a capacity of around 50 megawatts, while a large natural ga...
based on 1 interview
Interview experience
Lead Engineer
32
salaries
| ₹3.5 L/yr - ₹14.8 L/yr |
Senior Engineer
23
salaries
| ₹5.5 L/yr - ₹13 L/yr |
Deputy Chief Engineer
16
salaries
| ₹10.5 L/yr - ₹16 L/yr |
Engineer
11
salaries
| ₹2 L/yr - ₹11.4 L/yr |
Plant Engineer
11
salaries
| ₹6.6 L/yr - ₹15 L/yr |
UTL Solar
Danfoss Power Solutions
LM Wind Power
Senvion