i
Poly Medicure
Filter interviews by
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
TPM (Total Productive Maintenance) focuses on maximizing equipment effectiveness, while Lean Manufacturing aims to eliminate waste and improve efficiency.
TPM involves proactive maintenance to prevent breakdowns and improve overall equipment effectiveness
Lean Manufacturing focuses on eliminating waste in processes to improve efficiency and reduce costs
Both TPM and Lean Manufacturing aim to improve productivity and quali...
Top trending discussions
posted on 3 Jul 2024
posted on 17 May 2022
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Production Engineer
160
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Assistant Manager
106
salaries
| ₹3.3 L/yr - ₹8.7 L/yr |
Area Business Manager
105
salaries
| ₹4.7 L/yr - ₹10 L/yr |
Engineer
104
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Senior Engineer
101
salaries
| ₹3 L/yr - ₹6.2 L/yr |
Baxter International
Becton Dickinson
Smith & Nephew Healthcare
Boston Scientific