Filter interviews by
Top trending discussions
I appeared for an interview in Sep 2024.
Amazing aptitute test with knowledge of all aspects of the industry
Great assessment of all the interview natures of the assignment for risk, protocol, and valuation.
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
I have executed multiple projects in the last few years.
Developed a new website for a client using HTML, CSS, and JavaScript.
Created a mobile application for a startup using React Native.
Managed a team of developers to build a custom CRM system for a large corporation.
Implemented a data analytics solution for a healthcare organization using Python and SQL.
Designed and executed a social media marketing campaign for a no
I appeared for an interview before Apr 2024, where I was asked the following questions.
I applied via Recruitment Consulltant and was interviewed before Mar 2021. There were 2 interview rounds.
The percentage of steel in a pile varies depending on the type and design of the pile.
The percentage of steel in a pile can range from 0% to over 90%.
The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.
Steel piles typically have a higher percentage of steel than other types of piles.
The percentage of steel in a pile can also affect its
Pile built-up above cut off level as per IS code
IS code specifies the maximum allowable pile length above cut off level
Pile length above cut off level should not exceed 3 times the pile diameter
Built-up pile above cut off level can cause structural instability and failure
Vertical tolerance for piles as per IS code
As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm
This tolerance is applicable for both driven and cast-in-situ piles
The tolerance is measured at the top of the pile and at intervals of 3m along the length
If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken
Pile concrete consumption tolerance depends on various factors.
Pile diameter and length
Concrete mix design
Placement method
Quality control measures
Environmental conditions
Tolerance typically ranges from 5-10% of estimated consumption
Regular monitoring and adjustment of concrete consumption is necessary
Unit weight of steel is 7850 kg/m³
The unit weight of steel is the weight of a specific volume of steel
It is measured in kilograms per cubic meter (kg/m³)
The unit weight of steel is 7850 kg/m³
This value may vary slightly depending on the composition and manufacturing process of the steel
I applied via Campus Placement and was interviewed before Oct 2022. There were 5 interview rounds.
Gd happend on one given topic among group of 10 people
Production Engineer
29
salaries
| ₹1.2 L/yr - ₹5.2 L/yr |
Engineer
23
salaries
| ₹1.8 L/yr - ₹5.3 L/yr |
Junior Design Engineer
21
salaries
| ₹2.8 L/yr - ₹4.6 L/yr |
Senior Engineer
15
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Assistant Manager
12
salaries
| ₹5.2 L/yr - ₹9 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem