Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 3 interview rounds.
Store management store operations purchase planing
Store management planing operations inventory control ABC analysis Fifo stock statement
Technical
posted on 19 Dec 2022
I applied via Company Website and was interviewed in Nov 2022. There were 2 interview rounds.
posted on 19 Dec 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
The interview focused primarily on my previous experience and my understanding of the role.
I applied via Job Portal and was interviewed in Apr 2021. There was 1 interview round.
posted on 16 Apr 2023
I applied via Referral and was interviewed before Apr 2022. There were 3 interview rounds.
posted on 27 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
Implementing proactive maintenance, training, and data analysis ensures optimal plant performance with zero breakdowns.
Implement a predictive maintenance program using IoT sensors to monitor equipment health.
Conduct regular training sessions for staff on equipment operation and safety protocols.
Utilize data analytics to identify trends and potential failure points in machinery.
Establish a culture of continuous improvem...
I ensure effective management of Weld VU and VSa audits through structured processes, team collaboration, and continuous improvement.
Establish clear audit objectives and criteria to align with organizational goals.
Utilize a checklist to ensure all necessary components are covered during the audit.
Conduct regular training sessions for the audit team to keep them updated on best practices.
Implement a feedback loop post-a...
Implementing effective strategies for spare part inventory management can optimize costs and ensure availability within budget constraints.
Conduct regular inventory audits to identify slow-moving or obsolete parts, allowing for better allocation of budget.
Utilize just-in-time (JIT) inventory practices to reduce holding costs while ensuring parts are available when needed.
Implement a demand forecasting system to predict...
Implementing strategic planning, stakeholder engagement, and continuous monitoring ensures successful cost savings project management.
Define clear objectives: Establish specific, measurable goals for cost savings, such as reducing operational costs by 15% within a year.
Engage stakeholders: Involve key stakeholders early to gain buy-in and insights, ensuring alignment with organizational goals.
Conduct thorough analysis:...
I applied via Campus Placement and was interviewed in Nov 2020. There was 1 interview round.
A die is a tool used to shape or cut materials. There are various types of dies used in different industries.
Dies are used in manufacturing to cut, shape, or form materials such as metal, plastic, and paper.
Some common types of dies include cutting dies, forming dies, and drawing dies.
Cutting dies are used to cut materials into specific shapes, while forming dies are used to bend or shape materials.
Drawing dies are use...
Tool room is a specialized area in a company where tools and equipment are designed, manufactured, and maintained.
Tool room is responsible for designing and manufacturing tools and equipment required for production.
It also maintains and repairs the tools and equipment to ensure their longevity and efficiency.
Tool room is equipped with specialized machinery and skilled personnel to carry out the tasks efficiently.
It pla...
Designing of a component before manufacturing helps in identifying and resolving potential issues, reducing costs and improving efficiency.
Designing helps in identifying potential issues and resolving them before manufacturing.
It helps in reducing costs by identifying and rectifying errors early on.
Designing also helps in improving efficiency by optimizing the component's design.
It ensures that the final product meets ...
My dream is to create innovative software solutions that positively impact people's lives.
Developing cutting-edge technology
Solving complex problems
Improving user experience
Collaborating with talented individuals
Making a difference in society
I am excited to join this organization because of its reputation for innovation and commitment to employee growth.
I am impressed by the company's track record of developing cutting-edge software solutions.
I am excited about the opportunity to work with a team of talented and motivated engineers.
I appreciate the company's focus on employee development and growth.
I am drawn to the company's culture of innovation and coll...
I am willing to work full-time with this organization and put in extra hours if required.
I am committed to delivering quality work within deadlines
I am open to working overtime and on weekends if necessary
I am willing to take on additional responsibilities if needed
To attach one variable from one file to another, we can use import or require statements in programming languages.
In JavaScript, we can use the 'require' statement to import a variable from another file.
In Python, we can use the 'import' statement to import a variable from another file.
We can also use the 'export' statement in the source file to export the variable and then import it in the destination file.
The syntax ...
based on 1 review
Rating in categories
Quality Engineer
33
salaries
| ₹1.4 L/yr - ₹4 L/yr |
Production Engineer
19
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Design Engineer
16
salaries
| ₹3 L/yr - ₹5.1 L/yr |
Product Design Engineer
10
salaries
| ₹1.2 L/yr - ₹6 L/yr |
Assistant Manager
9
salaries
| ₹5.4 L/yr - ₹7.7 L/yr |
Caparo Engineering India
Marelli
Seoyon E-hwa Automotive
Maxxis Rubber