Upload Button Icon Add office photos

Filter interviews by

Pace Power Systems Field Supervisor Interview Questions and Answers

Updated 31 Oct 2021

Pace Power Systems Field Supervisor Interview Experiences

1 interview found

Interview Questionnaire 

1 Question

  • Q1. What Difference Between theorytical And prectical
  • Ans. 

    Theoretical knowledge is based on concepts and principles, while practical knowledge is gained through hands-on experience.

    • Theoretical knowledge is acquired through studying and understanding concepts, principles, and theories.

    • Practical knowledge is gained through applying theoretical knowledge in real-life situations.

    • Theoretical knowledge provides a foundation for practical application.

    • Theoretical knowledge helps in u...

  • Answered by AI

Interview questions from similar companies

Manager Interview Questions & Answers

BHEL user image Anonymous

posted on 14 Nov 2021

I applied via Company Website and was interviewed before Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident Sound knowledge of power plant engineering will help

I applied via Walk-in and was interviewed in Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

11 Questions

  • Q1. What is power factor ?
  • Ans. 

    Power factor is a measure of how effectively electrical power is being used in a circuit.

    • Power factor is the ratio of real power (in watts) to apparent power (in volt-amperes).

    • It indicates the efficiency of electrical power consumption in a circuit.

    • A power factor of 1 means all the power is being used effectively, while a power factor less than 1 indicates wastage of power.

    • Inductive loads like motors and transformers h...

  • Answered by AI
  • Q2. Clarification of motor .
  • Ans. 

    A motor is an electrical device that converts electrical energy into mechanical energy.

    • Motors are used in a variety of applications, from powering industrial machinery to driving household appliances.

    • There are different types of motors, including AC motors, DC motors, and stepper motors.

    • Motors can be controlled using various methods, such as variable frequency drives and soft starters.

    • Proper maintenance and inspection ...

  • Answered by AI
  • Q3. Control diagram of star delta stater.
  • Ans. 

    A star delta starter is used to reduce the starting current of a motor.

    • The motor is initially connected in star configuration to reduce the voltage across each winding.

    • After a set time, the motor is switched to delta configuration for normal operation.

    • The control diagram includes a timer, contactors, and overload protection.

    • The timer delays the switching from star to delta configuration.

    • The contactors are used to switc...

  • Answered by AI
  • Q4. In which motor dol starter is used ?
  • Ans. 

    DOL starter is used in single-phase induction motors and small three-phase motors.

    • DOL starter stands for Direct-On-Line starter.

    • It is used to start and stop the motor directly without any intermediate control.

    • It is commonly used in single-phase induction motors and small three-phase motors.

    • DOL starter provides full voltage to the motor during starting, which can cause high starting current.

    • It consists of a contactor, t...

  • Answered by AI
  • Q5. Resistive load equation.
  • Ans. 

    The resistive load equation is used to calculate the power consumed by a resistive load.

    • The equation is P = V^2/R, where P is power, V is voltage, and R is resistance.

    • This equation is used in electrical engineering to determine the power consumption of resistive loads such as heaters and incandescent light bulbs.

    • The equation can also be rearranged to solve for voltage or resistance, depending on the information given.

    • I...

  • Answered by AI
  • Q6. In which purpose asynchronous motor are used?
  • Ans. 

    Asynchronous motors are used for various purposes due to their simple design and low cost.

    • Asynchronous motors are commonly used in industrial applications such as pumps, fans, and compressors.

    • They are also used in household appliances like washing machines and refrigerators.

    • Asynchronous motors are preferred for their low maintenance and high reliability.

    • They are also used in electric vehicles and hybrid cars.

    • Asynchrono...

  • Answered by AI
  • Q7. Classification of transformer.
  • Ans. 

    Transformers are classified based on their construction, purpose, and voltage level.

    • Based on construction: core type, shell type, and Berry type

    • Based on purpose: power transformer, distribution transformer, isolation transformer, autotransformer, etc.

    • Based on voltage level: step-up transformer, step-down transformer, and isolation transformer

    • Other classifications: single-phase transformer, three-phase transformer, and ...

  • Answered by AI
  • Q8. What amount of power can India generate?
  • Ans. 

    India has a total installed capacity of over 370 GW as of 2021.

    • India's power generation capacity has been growing rapidly in recent years

    • The country has set a target of achieving 450 GW of renewable energy capacity by 2030

    • India is one of the world's largest producers of renewable energy, with a capacity of over 100 GW

    • Coal still accounts for a significant portion of India's power generation, but the government is workin

  • Answered by AI
  • Q9. For what purpose chopper ckt are used.
  • Ans. 

    Chopper circuits are used to convert a fixed DC voltage to a variable DC voltage.

    • Chopper circuits are also known as DC-DC converters.

    • They are used in applications such as battery charging, motor control, and renewable energy systems.

    • Chopper circuits use high-frequency switching to control the output voltage.

    • Examples of chopper circuits include buck converters, boost converters, and buck-boost converters.

  • Answered by AI
  • Q10. LVDT and RVDT.
  • Q11. There are many more ,the asked me...

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic study can improve your life

I applied via Company Website and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Powerplant operational tricks and boiler and turbine operations and mechanical related works

Interview Preparation Tips

Interview preparation tips for other job seekers - h
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(2 Questions)

  • Q1. Normal generic questions
  • Q2. What is the Notice Period
  • Ans. 

    Notice period is the amount of time an employee needs to give before leaving a job.

    • Notice period is typically stated in the employment contract.

    • It can range from 1 week to several months depending on the company and position.

    • During the notice period, the employee is expected to work as usual and hand over responsibilities.

    • Some companies may allow employees to buy out their notice period by paying a fee.

    • Notice period pr...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Questions about Technical Support

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself, and share all the roles and responsibilities which you have been doing till date . the HR is supportive and will guide you accordingly

I was interviewed in Feb 2022.

Round 1 - Technical 

(1 Question)

  • Q1. Work experience and achievement
Round 2 - Technical 

(1 Question)

  • Q1. About switches and wire

Interview Preparation Tips

Topics to prepare for V-Guard Industries Electrician interview:
  • Technical
Interview preparation tips for other job seekers - Hard work.enjoy creative broblem solving

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 
Round 3 - One-on-one 

(1 Question)

  • Q1. Electrician basis questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Please sir I need this job I have three years experience as an electrician
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-

I applied via Referral

Round 1 - One-on-one 

(1 Question)

  • Q1. What is your skills
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. As a question fir general knowledge like multimeter test lamp and circuit breaker ,relay , ct and ,pt ,transform, la,etc This topic is normally using house equipment like fan ac etc
  • Q2. Same question also and all the electrical maintenance work

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge are most important and practical knowledge and other

I applied via Company Website and was interviewed before Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Previous working experience detailed. Documents verification
Round 3 - Technical 

(4 Questions)

  • Q1. What is concrete Temperature
  • Ans. 

    Concrete temperature refers to the temperature of freshly mixed concrete.

    • Concrete temperature affects the setting time and strength development of concrete.

    • It is important to control the temperature of concrete during mixing, transportation, and placement.

    • High temperatures can accelerate the setting time and reduce workability, while low temperatures can slow down setting and strength gain.

    • Concrete temperature is typic...

  • Answered by AI
  • Q2. Precocious of water structure joint
  • Ans. 

    Precocious of water structure joint refers to the ability of a joint to withstand water pressure and prevent leakage.

    • Water structure joints should be designed and constructed to be watertight.

    • Various types of joints can be used in water structures, such as expansion joints, construction joints, and control joints.

    • Proper sealing materials and techniques should be employed to ensure the integrity of the joints.

    • Regular in...

  • Answered by AI
  • Q3. Cube test results in 7 days & 28 days
  • Ans. 

    Cube test results are used to determine the compressive strength of concrete at 7 and 28 days.

    • Cube test involves casting cubes of concrete and testing them under compression

    • Results are reported in terms of compressive strength in MPa or psi

    • 7-day results are used to determine early strength and 28-day results are used to determine ultimate strength

    • Concrete with a compressive strength of at least 20 MPa is considered sui

  • Answered by AI
  • Q4. 7 days Results 65% & 28 days Results 99.99%

Interview Preparation Tips

Interview preparation tips for other job seekers - All question previous working Area & civil backgrounds basic question

Tell us how to improve this page.

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 249 Interviews
Exide Industries Interview Questions
3.5
 • 167 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
Polycab Wires Interview Questions
4.0
 • 93 Interviews
KEI Industries Interview Questions
4.2
 • 53 Interviews
RR kabel Interview Questions
4.1
 • 44 Interviews
View all
Service Engineer
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Cluster Leader
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

MIS Coordinator
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior HR Executive
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Pace Power Systems with

Kirloskar Electric Company

3.5
Compare

BHEL

4.1
Compare

Thermax Limited

4.1
Compare

Crompton Greaves Consumer Electricals

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview