One fault occurs in electrical panel fure same fault preventive action
I applied via Naukri.com and was interviewed in Jan 2024. There was 1 interview round.
Yes, I have a 2 wheeler with a valid license.
Yes, I own a motorcycle with a valid license.
Having a 2 wheeler with a license allows me to commute easily to work.
I ensure to follow all traffic rules and regulations while riding my 2 wheeler.
posted on 2 Mar 2022
posted on 8 Apr 2022
I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.
posted on 16 Nov 2024
Power generation involves converting mechanical energy into electrical energy using generators, which is then transmitted through power lines to reach consumers.
Power generation involves using generators to convert mechanical energy (from sources like turbines, windmills, or water wheels) into electrical energy
Generators produce electricity by rotating a coil of wire within a magnetic field, creating an electric curren...
posted on 8 Sep 2022
I applied via Walk-in and was interviewed in Aug 2022. There was 1 interview round.
Precommissioning tests of transformers are essential to ensure their proper functioning.
Insulation resistance test
Turns ratio test
Vector group test
Winding resistance test
Magnetizing current test
No-load loss and excitation current test
Load loss and impedance voltage test
I applied via LinkedIn and was interviewed before Dec 2022. There was 1 interview round.
A hook drawing for DP level transmitters is a diagram that illustrates the installation and connection of the transmitter in a process system.
The hook drawing typically includes details such as the location of the transmitter, the process connections, and the electrical connections.
It may also include information about the type of transmitter, the range, and any additional accessories or components.
The hook drawing hel...
posted on 23 Oct 2021
I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.
VCB and ACB transformers require regular maintenance to ensure optimal performance and prevent breakdowns.
Regular inspection of the transformer and its components
Cleaning of the transformer and its components
Checking and tightening of connections
Testing of protective devices
Replacement of worn out or damaged parts
Regular oil analysis
Following manufacturer's recommended maintenance schedule
Training of personnel on prope
Junior Engineer
37
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Engineer
24
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Assistant Manager
17
salaries
| ₹2 L/yr - ₹8.5 L/yr |
Executive
11
salaries
| ₹2.4 L/yr - ₹3.5 L/yr |
Senior Engineer
8
salaries
| ₹3.6 L/yr - ₹5.4 L/yr |
Delhi Jal Board
Chennai Metro Water
Kolkata Municipal Corporation
Ahmedabad Municipal Corporation