Add office photos
Employer?
Claim Account for FREE

NKG Infrastructure

3.6
based on 358 Reviews
Filter interviews by

On Demand Agility Software Interview Questions and Answers

Updated 1 Feb 2025

Q1. What is your experience with Reinforced Cement Concrete (RCC) work on construction sites? 2 years experience

Ans.

I have 2 years of experience working with Reinforced Cement Concrete (RCC) on construction sites.

  • Managed RCC foundation construction for a commercial building project

  • Executed RCC beam and column work for a residential housing development

  • Performed quality control checks on RCC structures to ensure compliance with design specifications

Add your answer

Q2. 1.) What is the meaning of QA/QC ????? 2) Knowledge of concrete . 3) Chemical and physical test of Cement. 4) All testing of coarse and fine Aggregate. 5) Chemical and physical properties of TMT Bar (8mm to 40m...

read more
Ans.

QA/QC stands for Quality Assurance/Quality Control. It involves testing and inspection of materials and products to ensure they meet quality standards.

  • QA/QC is a process of ensuring quality in products and materials

  • It involves testing and inspection of materials and products

  • Concrete, cement, aggregates, TMT bars, and soil are some of the materials that require QA/QC

  • Knowledge of chemical and physical properties of these materials is necessary

  • Mix design of concrete as per IS Co...read more

Add your answer

Q3. What is nondestructive testing

Ans.

Nondestructive testing is a method of testing materials without causing damage to the object being tested.

  • It is used to detect flaws or defects in materials or structures

  • Common methods include ultrasonic testing, radiography, and magnetic particle testing

  • It is often used in industries such as construction, aerospace, and manufacturing

  • Nondestructive testing can help ensure the safety and reliability of structures and products

Add your answer

Q4. Clement consumption in M30

Ans.

Cement consumption in M30 refers to the amount of cement used in the construction of M30 grade concrete.

  • Cement consumption in M30 depends on the mix design and the required strength of the concrete.

  • The cement content in M30 grade concrete is generally between 320 to 360 kg/m3.

  • Factors such as water-cement ratio, aggregate properties, and admixtures can also affect cement consumption.

  • Higher cement content may be required for special applications or to achieve higher strength.

  • Pr...read more

View 1 answer
Discover On Demand Agility Software interview dos and don'ts from real experiences

Q5. Height of pouring concrete

Ans.

The height of pouring concrete depends on various factors such as the type of structure, weather conditions, and equipment used.

  • The height of pouring concrete should not exceed 1.5 meters to avoid segregation and ensure proper compaction.

  • For high-rise buildings, concrete is poured in stages, with each stage being allowed to cure before the next one is poured.

  • The use of pumps and chutes can help to pour concrete at greater heights.

  • Weather conditions such as wind and temperatur...read more

Add your answer

Q6. How to manage the site?

Ans.

Site management involves coordinating resources, schedules, and tasks to ensure successful project completion.

  • Create a detailed project plan outlining tasks, timelines, and responsibilities.

  • Regularly communicate with team members and stakeholders to provide updates and address any issues.

  • Monitor progress and adjust plans as needed to stay on track for completion.

  • Ensure compliance with safety regulations and quality standards.

  • Implement efficient workflows and processes to maxi...read more

Add your answer

Q7. Tell me your reference.

Ans.

I have references from my previous employers and colleagues in the construction industry.

  • References from previous employers who can vouch for my work ethic and skills

  • Recommendations from colleagues who have worked with me on projects

  • Positive feedback from clients or contractors I have collaborated with

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at On Demand Agility Software

based on 25 interviews
Interview experience
4.2
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.4
 • 645 Interview Questions
3.8
 • 364 Interview Questions
3.8
 • 299 Interview Questions
4.1
 • 266 Interview Questions
4.1
 • 203 Interview Questions
4.1
 • 158 Interview Questions
View all
Top NKG Infrastructure Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter