Add office photos
Engaged Employer

Nippon Koei India

4.7
based on 355 Reviews
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by

10+ Microland Interview Questions and Answers

Updated 21 Oct 2024

Q1. What is full process of Diaphragm wall construction?

Ans.

Diaphragm wall construction involves several steps including excavation, reinforcement placement, concrete pouring, and panel extraction.

  • Excavation of a trench to the desired depth and width

  • Installation of guide walls to maintain the trench dimensions

  • Reinforcement cages are lowered into the trench and positioned correctly

  • Concrete is poured into the trench, displacing the bentonite slurry

  • Panel extraction is carried out to remove the guide walls and complete the diaphragm wall

View 1 answer

Q2. What is difference between Top bottom construction and Bottom Top construction?

Ans.

Top bottom construction refers to building from top to bottom while bottom top construction is the opposite.

  • Top bottom construction involves starting from the top and building downwards while bottom top construction starts from the bottom and builds upwards.

  • Top bottom construction is commonly used in high-rise buildings while bottom top construction is used in underground structures like tunnels.

  • Top bottom construction requires scaffolding and cranes while bottom top construc...read more

Add your answer

Q3. The work hours period is susceptible to person and in supervision of regulatory authority why? Explain ..

Ans.

Work hours period is susceptible to person and regulatory authority supervision. Why?

  • Work hours can vary based on individual preferences and capabilities

  • Regulatory authorities ensure compliance with labor laws and safety regulations

  • Work hours can impact employee productivity, health, and safety

  • Examples include overtime regulations, maximum work hour limits, and mandatory break periods

Add your answer

Q4. Development guidelines for Industrial Parks / SEZs in Tamil Nadu and India

Ans.

Development guidelines for Industrial Parks / SEZs in Tamil Nadu and India focus on infrastructure, sustainability, and attracting investments.

  • Infrastructure development including roads, water supply, electricity, and waste management

  • Sustainability measures such as green building certifications and renewable energy usage

  • Attracting investments through incentives like tax breaks and streamlined approval processes

  • Encouraging cluster development to promote synergy among industrie...read more

Add your answer
Discover Microland interview dos and don'ts from real experiences

Q5. National & International experience in SEZs and Industrial Parks

Ans.

I have extensive experience in developing and managing SEZs and Industrial Parks both nationally and internationally.

  • Led the development of multiple SEZs in India, overseeing all aspects from planning to execution

  • Managed industrial parks in Southeast Asia, ensuring compliance with local regulations and attracting foreign investment

  • Collaborated with government agencies and private sector partners to drive economic growth through SEZs and industrial parks

  • Implemented best practi...read more

Add your answer

Q6. Reduce the manning work and auto mated to be in reguler practice why? Explain..

Ans.

Automating tasks reduces workload and increases efficiency.

  • Automation can perform repetitive tasks faster and with fewer errors than humans.

  • Reducing manpower can save costs and increase productivity.

  • Automated systems can operate 24/7 without breaks or fatigue.

  • Examples include automated assembly lines, chatbots for customer service, and self-checkout machines.

Add your answer
Are these interview questions helpful?

Q7. What kind of accounting softwares have you used?

Ans.

I have experience using various accounting softwares such as QuickBooks, Xero, and SAP.

  • QuickBooks

  • Xero

  • SAP

Add your answer

Q8. Linking method from starting upto handover.

Ans.

The linking method from starting to handover involves various steps and processes to ensure the track is constructed properly.

  • Surveying and marking the alignment of the track

  • Excavating and preparing the subgrade

  • Installing sleepers and rails

  • Connecting the rails using fishplates and bolts

  • Tamping and leveling the track

  • Conducting trial runs and inspections before handover

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. 1)Waht is OHE & details regarding foundation & Cantilever .

Add your answer

Q10. What are the types of foundation.

Ans.

There are various types of foundations used in construction.

  • Shallow foundation: used for light structures like residential buildings

  • Deep foundation: used for heavy structures like bridges and high-rise buildings

  • Pile foundation: used in soft soil or when the load is heavy

  • Raft foundation: used when the soil is weak and the load is distributed

  • Strip foundation: used for load-bearing walls and columns

  • Pad foundation: used for individual columns or piers

Add your answer

Q11. What is working capital?

Ans.

Working capital is the difference between a company's current assets and current liabilities.

  • Working capital is essential for a company's day-to-day operations.

  • It indicates the company's ability to meet its short-term financial obligations.

  • Formula: Working Capital = Current Assets - Current Liabilities.

  • Examples of current assets: cash, accounts receivable, inventory.

  • Examples of current liabilities: accounts payable, short-term loans.

Add your answer

Q12. How will you sale somthing?

Ans.

To sell something, I would focus on understanding the customer's needs, highlighting the product's benefits, and using persuasive communication techniques.

  • Identify the customer's needs and pain points

  • Highlight the unique features and benefits of the product

  • Use persuasive communication techniques like storytelling and social proof

  • Address any objections or concerns the customer may have

  • Offer incentives or discounts to create a sense of urgency

  • Close the sale by asking for the cu...read more

Add your answer

Q13. Total length of turnout?

Ans.

The total length of a turnout refers to the distance from the heel of the switch to the toe of the frog.

  • Total length includes the switch, frog, and closure rails.

  • It is important for proper alignment and smooth transition of trains.

  • Example: A typical turnout may have a total length of 30-40 feet.

Add your answer

Q14. Dimensions of sleeper,rail,no etc.

Ans.

Dimensions of sleeper, rail, etc. are crucial for track engineering.

  • Standard rail length is 39 feet (11.89 meters)

  • Sleeper dimensions vary but are typically around 8 feet long

  • Rail height is usually around 6 inches

  • Rail width is typically around 4 inches

Add your answer

Q15. What is Delta testing LA.

Ans.

Delta testing LA is a type of testing used in electrical systems to detect faults and measure insulation resistance.

  • Delta testing LA involves measuring the insulation resistance between the live conductors and earth

  • It is used to detect faults in the electrical system and ensure safety

  • The test is performed by applying a voltage between the live conductors and earth and measuring the resulting current

  • The test is repeated with the polarity reversed to ensure accuracy

  • Delta testin...read more

Add your answer

Q16. Experience in metro project

Ans.

I have experience in managing traffic for metro projects.

  • Managed traffic flow during construction of metro line in Mumbai

  • Coordinated with local authorities to ensure smooth traffic movement

  • Implemented traffic diversion plans to minimize disruption to commuters

Add your answer

More about working at Nippon Koei India

Top Rated Mid-Sized Company - 2024
Top Rated Construction Company - 2024
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Microland

based on 33 interviews
Interview experience
4.6
Excellent
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

4.0
 • 245 Interview Questions
3.5
 • 212 Interview Questions
4.0
 • 194 Interview Questions
4.0
 • 172 Interview Questions
4.2
 • 146 Interview Questions
3.7
 • 142 Interview Questions
View all
Top Nippon Koei India Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter