Filter interviews by
I applied via Newspaper Ad and was interviewed before Sep 2023. There was 1 interview round.
Top trending discussions
posted on 25 Oct 2018
I applied via Recruitment Consultant and was interviewed in Oct 2018. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jun 2020. There was 1 interview round.
I applied via Walk-in and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.
posted on 17 Jun 2023
The main objects of the project are to achieve specific goals, deliverables, and outcomes within a set timeframe and budget.
Define clear project objectives and scope
Identify key deliverables and milestones
Allocate resources effectively
Monitor progress and adjust plans as needed
Ensure project goals align with organizational objectives
I applied via Campus Placement and was interviewed before Oct 2019. There were 4 interview rounds.
The power pack position for longwall mining face should be strategically located for efficient operation.
The power pack should be located near the longwall face to minimize the length of hydraulic hoses and electrical cables.
It should be positioned in a safe and accessible location for maintenance and repair.
The power pack should be designed to withstand the harsh mining environment, including dust and moisture.
The lay...
Bord and pillar mining percentage of extraction refers to the amount of coal or ore that can be extracted from a given area using this method.
The percentage of extraction in bord and pillar mining can vary depending on factors such as the size of the pillars left behind, the thickness of the seam being mined, and the equipment used.
In general, the percentage of extraction for coal using bord and pillar mining ranges fr...
Explaining blast output calculation and powder factor calculation.
Blast output calculation involves determining the amount of material moved during a blast.
Powder factor calculation involves determining the amount of explosive needed to move a certain amount of material.
Blast output calculation can be done using the formula: Volume of material moved = hole volume x burden x spacing x number of holes.
Powder factor calcu...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Manager
41
salaries
| ₹12 L/yr - ₹21 L/yr |
Deputy Manager
24
salaries
| ₹11 L/yr - ₹18 L/yr |
Assistant General Manager
19
salaries
| ₹20 L/yr - ₹30 L/yr |
Assistant Manager
17
salaries
| ₹8.4 L/yr - ₹13 L/yr |
Senior Manager
13
salaries
| ₹14 L/yr - ₹24 L/yr |
Hindustan Zinc
Vedanta Resources
Carborundum Universal Limited
Metso