Q1. WHAT WAS THE strength OF 7DAYS STRENGTH OF CUBE SPECIMEN to be achieved for M50 CONCRETE
The strength of 7 days cube specimen for M50 concrete should be at least...
The strength of concrete is measured in terms of compressive strength
For M50 concrete, the strength of 7 days cube specimen should be at least 50 MPa
This means that the cube specimen should be able to withstand a compressive force of 50 megapascals after 7 days of curing
Q2. IS 456 STATING ABOUT THE PLAIN REINFORCED CONCRETE
IS 456 is a code of practice for the design and construction of reinforced concrete structures.
IS 456 provides guidelines for the use of plain and reinforced concrete in construction.
It specifies the minimum grade of concrete, reinforcement details, and design requirements.
The code also covers the durability, workability, and strength of concrete.
For example, it recommends a minimum grade of M20 for reinforced concrete and M15 for plain concrete.
It also specifies the minimum ...read more
Q3. Why GGBS Including in concrete mix
GGBS is included in concrete mix to improve its strength, durability, and sustainability.
GGBS (Ground Granulated Blast Furnace Slag) is a by-product of the iron and steel industry.
It is used as a partial replacement for Portland cement in concrete mix.
GGBS enhances the workability of concrete and reduces the heat of hydration.
It improves the long-term strength and durability of concrete.
GGBS also reduces the risk of alkali-silica reaction and sulfate attack.
By using GGBS, the...read more
Q4. WHAT DOES IS 456 STATES
IS 456 is a code of practice for the design and construction of reinforced concrete structures.
IS 456 is a standard code of practice for the use of reinforced concrete in construction.
It provides guidelines for the design, construction, and maintenance of reinforced concrete structures.
The code covers various aspects of reinforced concrete, including materials, design, construction, and testing.
It also includes provisions for durability, fire resistance, and earthquake resist...read more
Q5. How electrical wiring is done and how to run lines in a project
Q6. How do transformer and electrical machine work
Q7. How does a generator work and when is it needed
Q8. Equipment required for segment casting to erection
Equipment required for segment casting to erection includes molds, concrete mixers, cranes, lifting equipment, and curing chambers.
Molds for casting segments
Concrete mixers for preparing the concrete mix
Cranes for lifting and placing the segments
Lifting equipment for handling heavy segments
Curing chambers for curing the segments