Filter interviews by
I applied via Company Website and was interviewed in Jun 2020. There were 3 interview rounds.
Top trending discussions
posted on 11 Mar 2022
I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.
Cable (stress) is provided in bridge to increase its load carrying capacity and improve its stability.
Cable (stress) helps to distribute the load of the bridge evenly.
It reduces the amount of material required for construction.
It also helps to improve the stability of the bridge.
Cable (stress) is commonly used in suspension bridges.
It allows for longer spans to be constructed without the need for additional support.
Cab...
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Hydro power test of DI pipes is a method to check the strength and integrity of ductile iron pipes under pressure.
Hydro power test involves filling the DI pipes with water and pressurizing them to a specified level.
The test is conducted to ensure that the pipes can withstand the pressure they will be subjected to in actual use.
Leaks or deformations during the test indicate weaknesses in the pipes.
The test helps in iden...
I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
The hydrotest pressure is 1.5 times the design pressure.
Hydrotest pressure is the pressure applied to a vessel or pipeline to check for leaks or defects.
It is usually done before commissioning the system.
For example, if the design pressure is 100 psi, the hydrotest pressure would be 150 psi.
The procedure for fit up inspection includes classification, cleaning, alignment, root gap, root face, bevel angle, and mismatch or overlap.
Classify the base metal
Clean the surface
Align the parts to be joined
Check the root gap and root face
Measure the bevel angle
Check for any mismatch or overlap
Ensure all specifications are met
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
Lap length is the overlap of reinforcement bars in concrete, while development length is the length of bar required to transfer stress to concrete.
Lap length is used to ensure continuity of reinforcement across a joint or splice in concrete elements.
Development length is required to develop the full strength of the reinforcement bar and transfer it to the surrounding concrete.
Lap length is typically specified in terms ...
The weight of a solid block with dimensions 400*400*200mm depends on the material it is made of.
The weight can be calculated by multiplying the volume of the block by the density of the material.
Different materials have different densities, so the weight will vary depending on the material.
To calculate the volume, multiply the length, width, and height of the block.
To find the weight, multiply the volume by the density...
I applied via Company Website and was interviewed in Mar 2024. There were 9 interview rounds.
Quality control is a process used to ensure that products or services meet specified requirements and standards.
Quality control involves inspecting, testing, and evaluating products or services to ensure they meet quality standards.
It also includes identifying defects or deviations from specifications and taking corrective actions.
Quality control helps to prevent defects, improve processes, and enhance customer satisfa...
This is company at the high economy
Number system and latter
On basis of defined structure
This check the soil testing
This is growth process in the employee
based on 9 reviews
Rating in categories
Site Engineer
124
salaries
| ₹2.2 L/yr - ₹8 L/yr |
Senior Engineer
108
salaries
| ₹4.2 L/yr - ₹11 L/yr |
Civil Site Engineer
95
salaries
| ₹2.2 L/yr - ₹6.5 L/yr |
Assistant Manager
60
salaries
| ₹4.7 L/yr - ₹12.5 L/yr |
Mechanical Engineer
47
salaries
| ₹2 L/yr - ₹7 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
B.L. Kashyap & Sons
L & W Constructions