Filter interviews by
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
Land rate for construction varies depending on location, size, and market conditions.
Land rates can vary significantly based on the location of the property.
The size of the land also plays a crucial role in determining the rate for construction.
Market conditions, such as demand and supply, can impact the land rate for construction.
Factors like accessibility, amenities, and zoning regulations can also influence the land...
Top trending discussions
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
Memory leaks in frameworks can be fixed by identifying and removing the root cause of the leak.
Identify the source of the leak using memory profiling tools
Analyze the code to find the root cause of the leak
Fix the code by releasing unused memory or optimizing memory usage
Test the framework thoroughly to ensure the leak has been fixed
A media player design framework should prioritize user experience, ease of use, and accessibility.
Include intuitive controls for playback, volume, and playlist management
Ensure compatibility with a variety of media formats
Consider incorporating features such as equalizer settings and visualizations
Design for accessibility with options for closed captioning and audio descriptions
Prioritize a clean and visually appealing
I applied via Naukri.com and was interviewed in Apr 2023. There were 4 interview rounds.
GENERAL APTITITUDE TEST - GENERAL AND NUMERICAL QUESTIONS.
GLOBAL RECESSIONS- ITS EFFECTS
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 5 interview rounds.
I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Sep 2020. There were 3 interview rounds.
I appeared for an interview in Feb 2024.
Calculating high rise area involves determining the total floor area of the building, including common areas and amenities.
Calculate the total floor area of each floor by multiplying the length and width of each floor
Include common areas such as hallways, stairwells, and elevator shafts in the total area calculation
Factor in amenities like rooftop gardens or swimming pools if applicable
Consider any setbacks or projecti
I have handled a variety of projects including residential, commercial, and institutional buildings.
Residential projects - designing single-family homes, apartments, and condominiums
Commercial projects - designing office buildings, retail spaces, and restaurants
Institutional projects - designing schools, hospitals, and government buildings
My current project architecture involves a microservices-based approach with containerization using Docker and orchestration with Kubernetes.
Utilizing microservices to break down the application into smaller, independent services
Containerizing each service using Docker for easy deployment and scalability
Orchestrating the containers with Kubernetes for efficient management and scaling
Implementing service discovery and l...
To create a scalable pipeline, consider factors like automation, modularity, monitoring, and flexibility.
Automate repetitive tasks to increase efficiency and reduce errors
Design modular components that can be easily added or removed to adjust to changing needs
Implement monitoring tools to track performance and identify bottlenecks
Ensure flexibility to accommodate future growth and changes in technology
Examples: Using t...
based on 1 interview
Interview experience
Site Engineer
14
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Executive Accountant
9
salaries
| ₹2.2 L/yr - ₹3.8 L/yr |
Assistant Manager
8
salaries
| ₹5.9 L/yr - ₹8.7 L/yr |
Project Manager
8
salaries
| ₹8.4 L/yr - ₹15 L/yr |
Structural Draftsman
7
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Marpu Foundation
Huawei Technologies
HCL Infosystems
Z X Learning