Filter interviews by
posted on 17 Oct 2023
I applied via Naukri.com and was interviewed before Oct 2022. There were 2 interview rounds.
There are three main types of defects in die casting industry: surface defects, internal defects, and dimensional defects.
Surface defects include issues like gas porosity, shrinkage porosity, and cold shuts.
Internal defects can be caused by trapped air, inclusions, or improper metal flow.
Dimensional defects may result from issues with the die or improper cooling.
Examples of defects include porosity, cracks, and misshap
MPS stands for Master Production Schedule, which is a plan for production that includes specific quantities and timing of production.
MPS is a detailed plan that specifies what will be produced, when it will be produced, and in what quantities.
It takes into account factors such as customer demand, production capacity, and inventory levels.
MPS helps in coordinating production activities and ensuring that production meets...
Implementing a visual management system to reduce waste in production processes.
Implemented color-coded labels for different parts to reduce search time and inventory waste
Created visual work instructions to reduce errors and rework
Utilized kanban boards to optimize inventory levels and reduce overproduction
Tact time is the time taken to produce one unit, while process time is the total time taken to complete a process.
Tact time is the time taken to produce one unit of a product, while process time is the total time taken to complete the entire process.
Tact time is usually shorter than process time as it focuses on the time taken for one unit, while process time considers all units produced.
Correlating tact time and proce...
I applied via LinkedIn and was interviewed before Mar 2023. There were 2 interview rounds.
Seeking new challenges and opportunities for growth.
Desire for new challenges and opportunities
Wish to expand skill set and knowledge
Seeking career advancement
Change in company culture or work environment
I applied via Approached by Company and was interviewed in Aug 2023. There was 1 interview round.
My KRA targets are focused on improving efficiency, reducing downtime, and increasing productivity in mechanical engineering projects.
Improving efficiency in design and development processes
Reducing downtime by implementing preventive maintenance strategies
Increasing productivity through effective project management and resource allocation
Production adherence achievement methods involve setting clear production goals, monitoring progress, and implementing strategies to ensure targets are met.
Set clear production goals and targets
Monitor progress regularly
Implement strategies to address any deviations from the plan
Utilize production scheduling tools and software
Train and motivate production staff to meet targets
SAP is an enterprise resource planning software used for managing business operations and customer relations.
SAP stands for Systems, Applications, and Products in Data Processing.
It is used by companies to manage various aspects of their business such as finance, HR, supply chain, etc.
SAP software integrates different business functions and processes into a single system.
It helps in streamlining operations, improving e...
I applied via Naukri.com and was interviewed before Jun 2020. There was 1 interview round.
MCB components are typically made of materials such as copper, silver, thermoplastics, and ceramics.
Copper is commonly used for conducting electricity in MCBs.
Silver is sometimes used as a contact material for better conductivity.
Thermoplastics like polyamide are used for insulation and housing of MCB components.
Ceramics are used for arc chutes to extinguish the arc when the MCB trips.
Other materials like steel, brass,...
I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.
posted on 24 Apr 2021
I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.
I appeared for an interview in Dec 2022.
Switch configuration involves setting up VLANs, port security, QoS, and other settings to optimize network performance.
Access the switch's command line interface (CLI) using a console cable or remote access software
Configure VLANs to segment network traffic and improve security
Enable port security to prevent unauthorized access to the network
Set up Quality of Service (QoS) to prioritize network traffic and ensure criti...
L2 and L3 switches are network devices used for packet switching. L2 operates at the data link layer and L3 at the network layer.
L2 switch operates at the data link layer and forwards packets based on MAC addresses
L3 switch operates at the network layer and forwards packets based on IP addresses
L2 switch is used for LAN networks while L3 switch is used for both LAN and WAN networks
L2 switch is faster than L3 switch as ...
MPLS is a protocol used for efficient packet forwarding in a network. It is used in WANs and service provider networks.
MPLS stands for Multiprotocol Label Switching
It is used to improve the speed and efficiency of network traffic routing
MPLS uses labels to identify the path that packets should take through the network
It is commonly used in WANs and service provider networks to provide Quality of Service (QoS) and traff...
VLANs are virtual LANs that allow network administrators to group devices together based on their functions or departments.
VLANs are used to segment a network into smaller, more manageable groups.
They can be created using network switches or routers.
Each VLAN has its own broadcast domain and can be configured with its own security policies.
VLANs can be created based on different criteria such as department, location, o...
I applied via Recruitment Consultant and was interviewed in Dec 2021. There was 1 interview round.
based on 1 interview
Interview experience
Engineer
264
salaries
| ₹1.5 L/yr - ₹5.8 L/yr |
Assistant Engineer
196
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Senior Engineer
178
salaries
| ₹4 L/yr - ₹7.5 L/yr |
Production Engineer
166
salaries
| ₹2.4 L/yr - ₹6.2 L/yr |
Assistant Manager
134
salaries
| ₹5.3 L/yr - ₹11.3 L/yr |
Havells
BHEL
Polycab Wires
CG Power and Industrial Solutions