Upload Button Icon Add office photos

Filter interviews by

Mining Engineering Services Mining Engineer Interview Questions and Answers

Updated 29 Jan 2022

Mining Engineering Services Mining Engineer Interview Experiences

1 interview found

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(8 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Where do you see yourself in 5 years?
  • Q6. Why are you looking for a change?
  • Q7. What are your strengths and weaknesses?
  • Q8. Tell me about yourself.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. What is mining - mining is the process of extraction of mineral from the earth surface from benifit of man caind.
  • Ans. 

    Mining is the process of extracting minerals from the earth's surface for human use.

    • Mining involves digging, drilling, and blasting to access mineral deposits

    • Various methods are used for mining, including open-pit mining, underground mining, and placer mining

    • Minerals extracted through mining include coal, gold, copper, and diamonds

  • Answered by AI
  • Q2. Full from of hemm-Havey earth moving machine
  • Ans. 

    HEMM stands for Heavy Earth Moving Machinery.

    • HEMM refers to large machines used in mining and construction for moving earth and other materials.

    • Examples of HEMM include dump trucks, excavators, bulldozers, and wheel loaders.

  • Answered by AI
  • Q3. Stripping ratio
  • Q4. What is mineral
  • Ans. 

    A naturally occurring inorganic solid substance with a specific chemical composition and structure.

    • Naturally occurring

    • Inorganic

    • Solid substance

    • Specific chemical composition and structure

  • Answered by AI
  • Q5. Full from ofLHD
  • Ans. 

    Load Haul Dump

    • LHD stands for Load Haul Dump

    • It is a type of underground mining equipment used to load ore into haul trucks

    • Commonly used in hard rock mining operations

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir
Name -Akash chandra Bal
Complete _ mining engineering
Year of passing -2024

I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. Regarding mining job and lectureship job.
  • Q2. Regarding working and why I want to join.
  • Q3. Related to My age and type of work.
  • Q4. Why I left the jobs.

Interview Preparation Tips

Interview preparation tips for other job seekers - In mining field mining engineer. Or lectureship. I am in need of job.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Open cast questions
  • Q2. Drilling and blasting

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
No response
Round 1 - Technical 

(3 Questions)

  • Q1. What are the options available for addressing labor unrest occurring at a project site?
  • Ans. 

    Options for addressing labor unrest at a project site include negotiation, mediation, implementing fair labor practices, and seeking legal recourse.

    • Negotiate with labor unions or representatives to address grievances and reach a resolution

    • Utilize mediation services to facilitate communication and find common ground between parties

    • Implement fair labor practices and policies to address underlying issues and improve worki...

  • Answered by AI
  • Q2. What are the costs associated with operations, and what methods can be employed to reduce these costs?
  • Ans. 

    Costs associated with operations in mining and methods to reduce them

    • Costs include equipment maintenance, labor, energy consumption, and waste disposal

    • To reduce costs, implement efficient mining techniques, optimize equipment usage, and streamline processes

    • Utilize automation and technology to improve productivity and reduce labor costs

    • Implement proper planning and scheduling to minimize downtime and maximize production

    • ...

  • Answered by AI
  • Q3. Have you worked in a MDO set up?
  • Ans. 

    Yes, I have worked in a MDO (Mine Development Operator) set up.

    • I have experience working in a Mine Development Operator (MDO) set up where I was responsible for overseeing the development of mining projects.

    • I have worked closely with geologists, surveyors, and other engineers to ensure the successful execution of mining plans.

    • I have experience in coordinating with equipment operators and maintenance teams to ensure smo

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. Why Vedanta is not giving the opportunity for physical handicap category job in mining ? In India all the human being have equal rights. I m requesting please give opportunity to physical handicap category...

Interview Preparation Tips

Interview preparation tips for other job seekers - Due to physical handicap category ,I m rejected the job . Please I'm requesting to all groups of companies to give job opportunities to physical handicap category for men / women ..
We all are living on the surface as equal rights ..
Thank you .q

I applied via Recruitment Consultant and was interviewed in Oct 2018. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About your your self and both technical &practical experience in the underground mines.

Interview Preparation Tips

Round: Resume Shortlist
Experience: One year pgpt in underground mines gas testing certificate,First Aid in basic reason to short list my resume.

General Tips: Get prepared for previous work experience &also complete the important documents.
Skills: Communication
Duration: 1-3 Months

I applied via Campus Placement and was interviewed before Oct 2019. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. 1.Favourite subject?
  • Q2. 2.Basic questions on drilling blasting from industrial training like hole dia ,types of explosives used ,quantity of explosive per hole .pull per blast ,powder factor.
  • Q3. 3.Longwall mining face power pack position with detailed layout.
  • Ans. 

    The power pack position for longwall mining face should be strategically located for efficient operation.

    • The power pack should be located near the longwall face to minimize the length of hydraulic hoses and electrical cables.

    • It should be positioned in a safe and accessible location for maintenance and repair.

    • The power pack should be designed to withstand the harsh mining environment, including dust and moisture.

    • The lay...

  • Answered by AI
  • Q4. 4.Bord and pillar mining percentage of extraction.
  • Ans. 

    Bord and pillar mining percentage of extraction refers to the amount of coal or ore that can be extracted from a given area using this method.

    • The percentage of extraction in bord and pillar mining can vary depending on factors such as the size of the pillars left behind, the thickness of the seam being mined, and the equipment used.

    • In general, the percentage of extraction for coal using bord and pillar mining ranges fr...

  • Answered by AI
  • Q5. 5.Blast output calculation on a given data set and powderfactor calculation.
  • Ans. 

    Explaining blast output calculation and powder factor calculation.

    • Blast output calculation involves determining the amount of material moved during a blast.

    • Powder factor calculation involves determining the amount of explosive needed to move a certain amount of material.

    • Blast output calculation can be done using the formula: Volume of material moved = hole volume x burden x spacing x number of holes.

    • Powder factor calcu...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident .Dont try to bluff &end of the interview u will fail miserably incase of narrating facts u r not familiar with.

I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. How can we do Underground working , how blasting system achieved in underground mines. Support system , ventilation ,
  • Ans. 

    Underground working in mining involves the use of blasting systems, support systems, and ventilation.

    • Underground working in mining is done through the use of tunnels and shafts.

    • Blasting systems are used to break up the rock and extract the desired minerals.

    • Support systems such as rock bolts, shotcrete, and steel arches are used to ensure the stability of the underground workings.

    • Ventilation systems are crucial for prov...

  • Answered by AI
  • Q2. Which gad present from blasting and how it handles.
  • Ans. 

    Gases like carbon monoxide and nitrogen oxides are present from blasting and are handled through ventilation and monitoring.

    • Gases are produced during blasting due to the combustion of explosives.

    • Carbon monoxide and nitrogen oxides are the most common gases produced.

    • These gases can be harmful to humans and the environment.

    • Ventilation systems are used to remove the gases from the mine.

    • Monitoring systems are used to detec...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - We always confidential mode and prepare yourself basic information related underground mining.

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical round - depends on your sector and manager . Else no technical questions. Ready to travel . Married or not . Over...

Interview Preparation Tips

Topics to prepare for TCE Senior Engineer interview:
  • Basic
Interview preparation tips for other job seekers - Check out on going projects of your stream, opportunities to learn and grow , do bit of Market survey with respect to salary, job responsibilities . And main important is your team .
All the best

Mining Engineering Services Interview FAQs

How many rounds are there in Mining Engineering Services Mining Engineer interview?
Mining Engineering Services interview process usually has 2 rounds. The most common rounds in the Mining Engineering Services interview process are Resume Shortlist and HR.

Tell us how to improve this page.

Interview Questions from Similar Companies

TCE Interview Questions
3.8
 • 247 Interviews
TKIL Interview Questions
4.2
 • 58 Interviews
Coal India Interview Questions
4.0
 • 48 Interviews
Vedanta Limited Interview Questions
3.8
 • 46 Interviews
Hindustan Zinc Interview Questions
3.8
 • 43 Interviews
Mecon Interview Questions
3.9
 • 41 Interviews
BEML Interview Questions
4.0
 • 22 Interviews
Nava Limited Interview Questions
3.8
 • 18 Interviews
View all
Mining Engineering Services Mining Engineer Salary
based on 5 salaries
₹2.2 L/yr - ₹9 L/yr
13% less than the average Mining Engineer Salary in India
View more details

Mining Engineering Services Mining Engineer Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

2.8

Company culture

5.0

Promotions

4.4

Work satisfaction

Explore 2 Reviews and Ratings
Senior Engineer
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Civil Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Mining Engineering Services with

Geovale Services

4.0
Compare

TKIL

4.2
Compare

TCE

3.8
Compare

Mecon

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview