I applied via Referral and was interviewed before Apr 2022. There were 2 interview rounds.
Top trending discussions
Absolutely right now I'm in the job opportunity to work from 29th
Java python git hub c++ c
I applied via Company Website and was interviewed in Dec 2022. There were 2 interview rounds.
5S is a methodology used to organize and maintain a clean and efficient workplace.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
It involves organizing and labeling tools and materials, cleaning and maintaining equipment, and creating a culture of continuous improvement.
Example: A factory implementing 5S might label all tools and materials, create a designated storage area for each item, and regularl...
I applied via Walk-in and was interviewed in Mar 2024. There were 7 interview rounds.
New metric tool one nut is running tool oil plus And all part related quarry
Balancer adjustment and Balancer problam, Q. what this Secondary protection Ans:- wire rope is connected Balancer with beem.
PNR Tool is connected Transuser with ETA Tool Is running Tourq is watching ETA Display. and Another activity Quality Department Checked by Tourqrange
Maintenance is shine and another Activities morning 08:00AM groups meeting and Evaning 04:00 breakdown related query etc.
Maintenance groups is all member spot antorher person
Engine 5c is a type of engine used in certain aircrafts and vehicles.
Engine 5c is known for its high performance and efficiency.
It is commonly used in military aircrafts and high-speed vehicles.
Engine 5c is designed to provide maximum power output while maintaining reliability.
Examples of vehicles that may use Engine 5c include fighter jets and sports cars.
Cycle time is the total time it takes to complete a process, while takt time is the rate at which a product must be produced to meet customer demand.
Cycle time is the total time it takes to complete a process from start to finish.
Takt time is the rate at which a product must be produced to meet customer demand.
Cycle time can be calculated by dividing the total time taken by the total number of units produced.
Takt time ...
I applied via Referral and was interviewed in Nov 2021. There was 1 interview round.
The interview questions cover motor starters, layout, power factor, troubleshooting with megger, and fault finding.
Motor starters are used to control the starting and stopping of motors.
There are different types of motor starters such as direct-on-line, star-delta, and soft starters.
The power layout of starters includes power supply, motor, and control circuit.
The control layout of starters includes start, stop, and ov...
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
Design or design procedure refers to the process of creating a plan or blueprint for a product, system, or structure.
Design involves identifying requirements and constraints
Creating conceptual sketches or models
Iteratively refining the design based on feedback
Testing and validating the design before implementation
Design is the process of creating a plan or solution to address a specific problem or need.
Design involves identifying requirements and constraints
It includes creating sketches, prototypes, and mockups
Design considers functionality, aesthetics, usability, and feasibility
Examples: architectural design, graphic design, product design
Designing a procedure involves outlining the steps and requirements for completing a task or achieving a goal.
Identify the goal or objective of the procedure
Break down the steps needed to achieve the goal
Consider any resources or tools required
Include any safety precautions or guidelines
Review and test the procedure for effectiveness
I applied via Walk-in and was interviewed in Jan 2022. There was 1 interview round.
based on 1 interview
Interview experience
Design Engineer
65
salaries
| ₹2.5 L/yr - ₹8.5 L/yr |
Mechanical Engg. Design
31
salaries
| ₹2.4 L/yr - ₹7.5 L/yr |
Senior Design Engineer
26
salaries
| ₹5.8 L/yr - ₹11.1 L/yr |
Assistant Design Engineer
15
salaries
| ₹3.2 L/yr - ₹5.2 L/yr |
Electrical Design Engineer
14
salaries
| ₹4.2 L/yr - ₹8 L/yr |
John Deere
Thermax Limited
Cummins
ABB