Filter interviews by
I applied via Walk-in and was interviewed in Sep 2023. There were 4 interview rounds.
I done already I have well knowledge about aptitude
Top trending discussions
I was interviewed before Apr 2020.
Types of fit refer to the relationship between the measurements of a product and the measurements of the intended user.
There are three types of fit: loose fit, standard fit, and slim fit.
Loose fit is designed for a relaxed, comfortable fit with extra room in the garment.
Standard fit is designed to fit the average body type with a comfortable, but not too loose or too tight fit.
Slim fit is designed for a closer fit to t...
Clearance fit has a gap between the two mating parts while transition fit has a slight overlap.
Clearance fit allows for easy assembly and disassembly of parts.
Transition fit provides a tighter fit and is used when a small amount of force is required to assemble the parts.
Clearance fit is used in applications where movement between parts is required, such as in bearings.
Transition fit is used in applications where a sec...
5S is a workplace organization method that aims to improve efficiency and productivity by maintaining cleanliness and orderliness.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical and efficient manner
Shine - clean and inspect the work area regularly
Standardize - establish procedures and guidelines for maintaining the 5S system
Sustain - ensure that the 5S system is ...
I applied via LinkedIn and was interviewed in Nov 2024. There were 2 interview rounds.
I implemented new production processes and technologies to improve efficiency and quality.
Introduced automated systems to streamline production processes
Implemented lean manufacturing principles to reduce waste and improve productivity
Led training sessions for employees to ensure smooth transition to new processes
Collaborated with cross-functional teams to identify areas for improvement
posted on 15 Jan 2025
I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.
The process for handing over new projects involves thorough documentation, training, and communication with stakeholders.
Create a detailed project handover document outlining project scope, objectives, timelines, and key deliverables.
Provide training to the team members who will be taking over the project to ensure a smooth transition.
Communicate with all stakeholders involved in the project handover to address any con...
I applied via Campus Placement and was interviewed in Sep 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
Manpower in shift can be handled by proper planning, communication, training, and monitoring.
Create a shift schedule that ensures adequate coverage and proper distribution of workload.
Communicate clearly with employees about their shift timings, responsibilities, and expectations.
Provide training to employees on their roles and responsibilities during the shift.
Monitor the performance and productivity of employees duri...
posted on 17 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There were 2 interview rounds.
Written exam based on subjects and disciplined notes
posted on 16 Sep 2023
I applied via Approached by Company and was interviewed in Aug 2023. There were 4 interview rounds.
WI stands for Work Instruction, which is a detailed document that provides step-by-step instructions on how to perform a specific task or job.
Work Instructions are used to ensure consistency in processes and quality of output.
They typically include information such as materials needed, tools required, safety precautions, and specific steps to be followed.
Examples of Work Instructions include assembly instructions for a...
Cycle time production calculation is the total time it takes to produce one unit of a product.
Cycle time is calculated by dividing the total production time by the total number of units produced.
For example, if it takes 10 hours to produce 100 units, the cycle time would be 0.1 hours per unit.
Cycle time helps in identifying bottlenecks and improving efficiency in production processes.
FTT stands for First Time Through, a metric used to measure the percentage of products that pass inspection on the first attempt.
FTT is calculated by dividing the number of products that pass inspection on the first attempt by the total number of products inspected, then multiplying by 100 to get a percentage.
FTT is an important metric for measuring the efficiency and quality of production processes.
For example, if 90 ...
OEE stands for Overall Equipment Effectiveness, a metric used to measure the efficiency of a manufacturing process.
OEE takes into account three factors: availability, performance, and quality.
It is calculated by multiplying availability, performance, and quality percentages.
For example, if a machine is available 90% of the time, operates at 80% of its maximum speed, and produces good parts 95% of the time, the OEE woul
5s explaintion, what about kizen, TPM , 7QC tool, 8D ?
I applied via Walk-in
5s and TPM are methodologies used in manufacturing to improve efficiency and productivity.
5s stands for Sort, Set in order, Shine, Standardize, Sustain. It is a method for organizing the workplace to improve efficiency and safety.
TPM stands for Total Productive Maintenance. It is a method for maximizing the effectiveness of equipment by involving all employees in the maintenance process.
Example: Implementing 5s in a pr...
Motors convert electrical energy into mechanical energy, while generators convert mechanical energy into electrical energy.
Motors use electricity to produce motion, while generators use motion to produce electricity
Motors have a rotor that spins within a stator, while generators have a rotor that is turned by an external force
Examples of motors include electric fans and washing machines, while examples of generators in
Interview experience
based on 1 review
Rating in categories
Assistant Manager
164
salaries
| ₹8 L/yr - ₹24 L/yr |
Oprating Engineer
148
salaries
| ₹2.2 L/yr - ₹4.2 L/yr |
Area Sales Manager
136
salaries
| ₹8.1 L/yr - ₹18 L/yr |
Senior Operations Engineer
63
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Deputy Manager
54
salaries
| ₹11 L/yr - ₹21.5 L/yr |
Bridgestone
Goodyear
Continental
Apollo Tyres