Effluent treatment plant can be implemented as ZLD to reduce hazardous waste and cost. Proper disposal methods must be followed.
Effluent treatment plant can be designed with Zero Liquid Discharge (ZLD) technology to minimize waste discharge.
Hazardous waste should be disposed of properly to prevent environmental damage and health hazards.
Non-hazardous waste can be recycled or reused to reduce disposal costs.
Reducing wat...
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
I have extensive experience in using various piping design tools.
Proficient in using AutoCAD for piping design
Familiar with 3D modeling software like SolidWorks for creating detailed piping layouts
Skilled in using piping design software such as Caesar II for stress analysis
Experience in using PDMS (Plant Design Management System) for piping design and layout
Knowledge of industry standards and codes related to piping de
I applied via Approached by Company and was interviewed before Jan 2022. There were 3 interview rounds.
posted on 21 Apr 2022
I applied via Naukri.com and was interviewed before Apr 2021. There were 2 interview rounds.
1 hr online test ..normal maths questions... logical reasoning questions
To drive business as an Assistant Manager, I will utilize my previous work experience and skills to increase sales, improve customer satisfaction, and implement effective marketing strategies.
Utilize previous work experience to identify areas for improvement and implement strategies to drive business growth
Develop and execute marketing campaigns to attract new customers and retain existing ones
Analyze sales data and cu...
I applied via Job Fair and was interviewed before Jun 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 4 interview rounds.
I appeared for an interview before Mar 2024.
Basic aptitude question of gate and in technical go through gate 1 mark question
Shell and tube heat exchanger design involves selecting appropriate materials, determining tube layout, and calculating heat transfer coefficients.
Select appropriate materials based on fluid properties and operating conditions
Determine tube layout to optimize heat transfer efficiency
Calculate heat transfer coefficients to ensure proper heat exchange
Consider factors like fouling, pressure drop, and thermal expansion in ...
I applied via LinkedIn and was interviewed before Sep 2022. There were 3 interview rounds.
Pipe sizing calculation involves determining the appropriate diameter of a pipe based on flow rate, pressure drop, and material properties.
Calculate the required flow rate for the system
Determine the pressure drop allowed in the system
Consider the material properties of the pipe such as friction factor and roughness
Use pipe sizing charts or formulas to find the appropriate diameter
Ensure the selected pipe size meets th
A protection system is a set of devices and measures designed to prevent damage or harm to equipment, personnel, or the environment in case of a fault or abnormal condition.
Protection systems can include circuit breakers, fuses, relays, and alarms.
They are commonly used in electrical systems to prevent overloads, short circuits, and ground faults.
Protection systems are essential for ensuring the safety and reliability ...
posted on 13 Oct 2021
I applied via Referral and was interviewed before Oct 2020. There were 4 interview rounds.
Plant Operator
120
salaries
| ₹1.4 L/yr - ₹3.3 L/yr |
Plant Chemist
109
salaries
| ₹1.3 L/yr - ₹2.7 L/yr |
Production Chemist
103
salaries
| ₹1.3 L/yr - ₹2.7 L/yr |
Shift Incharge
63
salaries
| ₹1.8 L/yr - ₹6 L/yr |
Maintenance Engineer
57
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
Asian Paints
Berger Paints
Pidilite Industries
Kansai Nerolac Paints