Filter interviews by
Python related 2 coding examples with
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
A DG (diesel generator) works on the principle of converting mechanical energy from the diesel engine into electrical energy through an alternator.
Diesel engine burns fuel to produce mechanical energy
Mechanical energy is used to rotate the alternator
Alternator converts mechanical energy into electrical energy
Predictive maintenance uses data and analytics to predict when equipment failure may occur, while preventive maintenance involves regularly scheduled maintenance to prevent breakdowns.
Predictive maintenance uses data and analytics to predict when equipment failure may occur
Preventive maintenance involves regularly scheduled maintenance to prevent breakdowns
Predictive maintenance is more cost-effective as it allows for ...
APMD stands for Average Power Maximum Demand, it is used to calculate the average power consumption over a specific period of time.
APMD helps in determining the maximum power demand during a specific time period.
It is useful for utility companies to plan and manage their power generation and distribution.
APMD is calculated by taking the average power consumption over a defined time period, usually in kilowatt-hours (kW
posted on 27 Jun 2023
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
A DG (diesel generator) works on the principle of converting mechanical energy from the diesel engine into electrical energy through an alternator.
Diesel engine burns fuel to produce mechanical energy
Mechanical energy is used to rotate the alternator
Alternator converts mechanical energy into electrical energy
Predictive maintenance uses data and analytics to predict when equipment failure may occur, while preventive maintenance involves regularly scheduled maintenance to prevent breakdowns.
Predictive maintenance uses data and analytics to predict when equipment failure may occur
Preventive maintenance involves regularly scheduled maintenance to prevent breakdowns
Predictive maintenance is more cost-effective as it allows for ...
APMD stands for Average Power Maximum Demand, it is used to calculate the average power consumption over a specific period of time.
APMD helps in determining the maximum power demand during a specific time period.
It is useful for utility companies to plan and manage their power generation and distribution.
APMD is calculated by taking the average power consumption over a defined time period, usually in kilowatt-hours (kW
posted on 27 Jun 2023
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Accountant
4
salaries
| ₹3.6 L/yr - ₹6.3 L/yr |
Sales Manager
4
salaries
| ₹4.5 L/yr - ₹25 L/yr |
Head Manufacturing
3
salaries
| ₹15.1 L/yr - ₹32 L/yr |
Digital Marketer
3
salaries
| ₹5.7 L/yr - ₹7.1 L/yr |
Aakash Educational Services
Frankfinn Institute of Air Hostess Training
Narayana Educational Society
Amity University