Upload Button Icon Add office photos

Filter interviews by

Marc Sanitation Production Planner Interview Questions and Answers

Updated 29 Dec 2022

Marc Sanitation Production Planner Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Knowledge about 5S and least count of vernier and micrometer?
  • Ans. Least count of vernier is 0.1mm and least count of micrometer is 0.01mm.
  • Answered Anonymously
  • Q2. What is cycle time and where it is used??
  • Ans. 

    Cycle time is the total time required to complete a process or task, from start to finish.

    • Cycle time is a measure of efficiency and productivity in production planning.

    • It helps in identifying bottlenecks and optimizing workflow.

    • Cycle time is used in various industries such as manufacturing, logistics, and software development.

    • For example, in manufacturing, cycle time can refer to the time it takes to produce one unit o...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Marc Sanitation Production Planner interview:
  • Kaizen
  • 5S System
  • Instrumentation
  • SAP
Interview preparation tips for other job seekers - Work hard and get prepared for some instruments knowledge and softwares .

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Solve the question of aptitude

Round 2 - Technical 

(2 Questions)

  • Q1. What is unit of pressure?
  • Ans. 

    Unit of pressure is the force applied perpendicular to the surface of an object per unit area.

    • Pressure is typically measured in units such as pascal (Pa), atmosphere (atm), bar, or pounds per square inch (psi).

    • 1 pascal is equal to 1 newton per square meter.

    • Common examples of pressure include atmospheric pressure, blood pressure, and tire pressure.

  • Answered by AI
  • Q2. What is meant by tolerance?
  • Ans. 

    Tolerance refers to the acceptable range of variation in a process or product without affecting its performance.

    • Tolerance is the maximum allowable deviation from a specified dimension or value.

    • It ensures that parts fit together properly and function as intended.

    • Tolerance can be specified in terms of dimensions, materials, or other characteristics.

    • For example, a production planner may set a tolerance of +/- 0.1mm for a

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Tell me about yourself?
  • Ans. 

    Experienced production planner with a strong background in coordinating manufacturing processes and optimizing production schedules.

    • Over 5 years of experience in production planning and scheduling

    • Proficient in using ERP systems to track inventory and manage production timelines

    • Skilled in analyzing data to identify bottlenecks and improve efficiency

    • Strong communication skills to collaborate with cross-functional teams

  • Answered by AI
  • Q2. Why is hire you?
  • Ans. 

    I am highly organized, detail-oriented, and have a strong background in production planning.

    • Extensive experience in creating production schedules and coordinating with various departments.

    • Strong analytical skills to identify potential bottlenecks and propose solutions.

    • Excellent communication skills to effectively communicate with suppliers, vendors, and internal teams.

    • Proven track record of meeting deadlines and optimi...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. My work experience, included machine type.
  • Q2. How many year of experience.
  • Ans. 

    I have 5 years of experience in production engineering.

    • I have worked in the production engineering field for 5 years.

    • My experience includes optimizing production processes and improving efficiency.

    • I have successfully implemented cost-saving measures in previous roles.

    • I have a strong understanding of manufacturing principles and technologies.

    • I have experience working with cross-functional teams to achieve production goa

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Question regarding machine shop.
  • Q2. CNC & VMC programming.
Round 3 - HR 

(2 Questions)

  • Q1. How to handle the manpower .
  • Ans. 

    Manpower can be effectively handled by proper planning, communication, training, and motivation.

    • Develop a clear organizational structure and job roles

    • Communicate effectively with the team to ensure understanding of goals and expectations

    • Provide necessary training and resources for skill development

    • Motivate and reward employees for their hard work and achievements

    • Regularly evaluate performance and provide feedback for i

  • Answered by AI
  • Q2. Expectation of salary amount.
  • Ans. 

    Salary expectations are based on industry standards, experience, and location.

    • Research industry standards for Production Engineers in your area

    • Consider your level of experience and skills

    • Factor in the cost of living in the location of the job

    • Be prepared to negotiate based on benefits and perks offered

    • Provide a range rather than a specific number

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to handle manpower.
  • Ans. 

    Manpower can be effectively handled by proper planning, communication, training, and motivation.

    • Develop a clear plan for manpower allocation and scheduling.

    • Communicate effectively with the team to ensure everyone is on the same page.

    • Provide necessary training and resources to enhance skills and productivity.

    • Motivate the team through recognition, rewards, and a positive work environment.

  • Answered by AI
  • Q2. Make the shift shidul
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Group Discussion 

Technical skills about maching process

Round 2 - One-on-one 

(1 Question)

  • Q1. Cnc programing ,setting, quality
Round 3 - Aptitude Test 

About presonal detail.

Interview Preparation Tips

Interview preparation tips for other job seekers - Great experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Tum kya kam kar lete ho
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Tell about job roles

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Questions was technical as injection Moulding
Round 3 - One-on-one 

(1 Question)

  • Q1. Jobs related Questions
Round 4 - HR 

(1 Question)

  • Q1. Only salary discotions

I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(14 Questions)

  • Q1. What Is oee calculation
  • Ans. 

    OEE calculation is a measure of manufacturing productivity that combines availability, performance, and quality metrics.

    • OEE stands for Overall Equipment Effectiveness

    • It is calculated by multiplying availability, performance, and quality percentages

    • OEE helps identify areas for improvement in manufacturing processes

    • Example: If a machine has 90% availability, 95% performance, and 98% quality, its OEE would be 83.79%

    • OEE is...

  • Answered by AI
  • Q2. What is poka yoka and capa
  • Ans. 

    Poka yoke is a technique used in manufacturing to prevent errors, while CAPA stands for Corrective and Preventive Action.

    • Poka yoke is a Japanese term meaning 'mistake-proofing' or 'error-proofing'. It involves designing a process or system in a way that prevents mistakes or errors from occurring.

    • Poka yoke techniques can include using sensors, alarms, or physical devices to detect and prevent errors.

    • For example, a poka ...

  • Answered by AI
  • Q3. What is difference production and productivity
  • Ans. 

    Production is the process of creating goods or services, while productivity is the measure of efficiency in producing those goods or services.

    • Production refers to the creation of goods or services, while productivity measures the efficiency of that production.

    • Production is a process, while productivity is a measure.

    • Production can be increased by adding more resources, while productivity can be increased by improving pr...

  • Answered by AI
  • Q4. What is tpm and jh and jh 7 steps
  • Ans. 

    TPM stands for Total Productive Maintenance and JH stands for Job Hazard Analysis. JH 7 steps are the steps involved in conducting a JH analysis.

    • TPM is a maintenance strategy aimed at maximizing the productivity of equipment and minimizing downtime.

    • JH is a safety analysis technique used to identify potential hazards in a job or task.

    • JH 7 steps involve breaking down a job into steps, identifying potential hazards, deter...

  • Answered by AI
  • Q5. What is check sheet and wsqc,swc,wes
  • Ans. 

    Check sheet is a tool used to collect and analyze data. WSQC, SWC, and WES are not commonly used acronyms in relation to production engineering.

    • Check sheet is a simple data collection tool used to track defects or issues in a process

    • WSQC, SWC, and WES are not commonly used acronyms in production engineering

    • However, there are similar tools like the 5S methodology or the DMAIC process for continuous improvement

  • Answered by AI
  • Q6. What is 7Qc tools check sheet and parato digram
  • Ans. 

    7QC tools check sheet is a document used to collect and analyze data, while Pareto diagram is a graphical representation of the data.

    • 7QC tools check sheet is used to identify and solve problems in production processes

    • It helps in collecting and analyzing data related to the process

    • Pareto diagram is a bar graph that shows the relative frequency or size of problems in descending order of importance

    • It helps in identifying ...

  • Answered by AI
  • Q7. What is rejection handling and red bin analysis
  • Ans. 

    Rejection handling is the process of identifying and addressing rejected products. Red bin analysis is a method of analyzing rejected products to determine the cause of rejection.

    • Rejection handling involves identifying and segregating rejected products

    • Red bin analysis involves analyzing rejected products to determine the root cause of rejection

    • The data collected during red bin analysis can be used to improve production...

  • Answered by AI
  • Q8. What do you man power handling
  • Ans. 

    Manpower handling refers to managing and organizing the workforce in a production environment.

    • It involves recruiting, training, and scheduling employees

    • Ensuring safety and compliance with regulations

    • Motivating and supervising workers

    • Optimizing productivity and efficiency

    • Dealing with conflicts and resolving issues

    • Examples include managing a production line, overseeing a team of technicians, or coordinating shifts in a f

  • Answered by AI
  • Q9. What is kaizen and capa
  • Ans. 

    Kaizen is a Japanese term for continuous improvement while CAPA stands for Corrective and Preventive Action.

    • Kaizen involves making small, incremental improvements to processes and systems over time.

    • CAPA is a process used to identify and address the root cause of a problem or nonconformity.

    • Kaizen and CAPA are both important tools for improving quality and efficiency in manufacturing and other industries.

    • Examples of kaiz...

  • Answered by AI
  • Q10. What is efficiency in your line
  • Ans. 

    Efficiency in production engineering refers to the ratio of output to input.

    • Efficiency is a measure of how well resources are utilized in the production process.

    • It is calculated as the ratio of output to input.

    • Higher efficiency means more output is produced with the same amount of input.

    • Efficiency can be improved by optimizing processes, reducing waste, and increasing automation.

    • For example, reducing the time it takes ...

  • Answered by AI
  • Q11. What is 4m changing formats
  • Ans. 

    4m changing formats refers to the process of changing the format of a production line from one product to another.

    • It involves reconfiguring the machinery and equipment to accommodate the new product

    • It may require changing the packaging, labeling, and other materials used in the production process

    • It is a common practice in manufacturing to increase efficiency and flexibility

    • Example: Changing a production line from makin

  • Answered by AI
  • Q12. What is kpi instruction
  • Ans. 

    KPI instruction refers to the guidelines or rules that define how key performance indicators (KPIs) should be measured and reported.

    • KPI instruction provides a framework for measuring and reporting KPIs consistently and accurately.

    • It outlines the specific metrics that should be tracked and how they should be calculated.

    • KPI instruction also includes guidelines for setting targets and benchmarks for KPIs.

    • Examples of KPI i...

  • Answered by AI
  • Q13. What is iso - ts audit
  • Ans. 

    ISO-TS audit is a quality management system audit for automotive industry.

    • ISO-TS audit is a quality management system audit for automotive industry

    • It is based on ISO 9001 standard and specific requirements for automotive industry

    • It focuses on ensuring product quality, safety, and customer satisfaction

    • It involves auditing the entire production process from design to delivery

    • Examples of ISO-TS audit include audits of car

  • Answered by AI
  • Q14. What is line and machining processing
  • Ans. 

    Line and machining processing are methods used in manufacturing to produce products efficiently and accurately.

    • Line processing involves a series of steps in which a product is assembled or produced in a linear fashion.

    • Machining processing involves the use of machines to shape and cut materials into specific shapes and sizes.

    • Both methods are used to increase efficiency and accuracy in manufacturing processes.

    • Examples of...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge production department and basic knowledge ERP, excel.,Sap, and basic knowledge maintenance
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed before Aug 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell about machine shop improvement related issues with you have faced in your previous company.
  • Ans. What is Machining Process and how we can provide instructions for your team to improve productivity and minimise rejection and how we can improve shop floor OEE.
  • Answered Anonymously
  • Q2. How we can reduce machining cycle time?
  • Ans. 

    Reducing machining cycle time can be achieved by optimizing tool paths, using high-speed machining techniques, implementing automation, and improving machine maintenance.

    • Optimize tool paths to reduce unnecessary movements and minimize idle time.

    • Utilize high-speed machining techniques to increase cutting speeds and feed rates.

    • Implement automation such as robotic loading and unloading to reduce manual handling time.

    • Regul...

  • Answered by AI
  • Q3. To reduce air cutting from machine with ECRS Methodology.
  • Ans. 

    To reduce air cutting from machine with ECRS Methodology, adjust cutting parameters, optimize tool paths, use high-quality cutting tools, and implement proper maintenance.

    • Adjust cutting parameters such as speed, feed rate, and depth of cut to minimize air cutting.

    • Optimize tool paths to ensure efficient cutting and reduce unnecessary movements.

    • Use high-quality cutting tools that are sharp and well-maintained to improve ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Global Autotech Limited is a Good Company

Marc Sanitation Interview FAQs

How many rounds are there in Marc Sanitation Production Planner interview?
Marc Sanitation interview process usually has 2 rounds. The most common rounds in the Marc Sanitation interview process are Resume Shortlist and Technical.
What are the top questions asked in Marc Sanitation Production Planner interview?

Some of the top questions asked at the Marc Sanitation Production Planner interview -

  1. What is cycle time and where it is use...read more
  2. Knowledge about 5S and least count of vernier and micromet...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Marc Sanitation interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Global Autotech Interview Questions
4.0
 • 45 Interviews
Ag Industries Interview Questions
4.0
 • 38 Interviews
Rostfrei Steels Interview Questions
4.0
 • 32 Interviews
e-con Systems Interview Questions
3.5
 • 30 Interviews
View all

Marc Sanitation Production Planner Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

2.0

Skill development

3.0

Work-Life balance

4.0

Salary & Benefits

2.0

Job Security

3.0

Company culture

2.0

Promotions/Appraisal

2.0

Work Satisfaction

Explore 1 Review and Rating
HR Manager
3 salaries
unlock blur

₹8 L/yr - ₹8 L/yr

Assistant Engineer
3 salaries
unlock blur

₹2.5 L/yr - ₹2.6 L/yr

Production Planner
3 salaries
unlock blur

₹2.4 L/yr - ₹2.7 L/yr

Explore more salaries
Compare Marc Sanitation with

Dhoot Transmission

3.7
Compare

ZF Steering Gear

3.7
Compare

Amphenol Interconnect

4.2
Compare

Microtek International

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview