Filter interviews by
I applied via Walk-in and was interviewed before Dec 2021. There were 2 interview rounds.
Cycle time is the total time required to complete a process or task, from start to finish.
Cycle time is a measure of efficiency and productivity in production planning.
It helps in identifying bottlenecks and optimizing workflow.
Cycle time is used in various industries such as manufacturing, logistics, and software development.
For example, in manufacturing, cycle time can refer to the time it takes to produce one unit o...
posted on 25 Jul 2024
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 3 interview rounds.
Solve the question of aptitude
Unit of pressure is the force applied perpendicular to the surface of an object per unit area.
Pressure is typically measured in units such as pascal (Pa), atmosphere (atm), bar, or pounds per square inch (psi).
1 pascal is equal to 1 newton per square meter.
Common examples of pressure include atmospheric pressure, blood pressure, and tire pressure.
Tolerance refers to the acceptable range of variation in a process or product without affecting its performance.
Tolerance is the maximum allowable deviation from a specified dimension or value.
It ensures that parts fit together properly and function as intended.
Tolerance can be specified in terms of dimensions, materials, or other characteristics.
For example, a production planner may set a tolerance of +/- 0.1mm for a
Experienced production planner with a strong background in coordinating manufacturing processes and optimizing production schedules.
Over 5 years of experience in production planning and scheduling
Proficient in using ERP systems to track inventory and manage production timelines
Skilled in analyzing data to identify bottlenecks and improve efficiency
Strong communication skills to collaborate with cross-functional teams
I am highly organized, detail-oriented, and have a strong background in production planning.
Extensive experience in creating production schedules and coordinating with various departments.
Strong analytical skills to identify potential bottlenecks and propose solutions.
Excellent communication skills to effectively communicate with suppliers, vendors, and internal teams.
Proven track record of meeting deadlines and optimi...
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 3 interview rounds.
I have 5 years of experience in production engineering.
I have worked in the production engineering field for 5 years.
My experience includes optimizing production processes and improving efficiency.
I have successfully implemented cost-saving measures in previous roles.
I have a strong understanding of manufacturing principles and technologies.
I have experience working with cross-functional teams to achieve production goa
Manpower can be effectively handled by proper planning, communication, training, and motivation.
Develop a clear organizational structure and job roles
Communicate effectively with the team to ensure understanding of goals and expectations
Provide necessary training and resources for skill development
Motivate and reward employees for their hard work and achievements
Regularly evaluate performance and provide feedback for i
Salary expectations are based on industry standards, experience, and location.
Research industry standards for Production Engineers in your area
Consider your level of experience and skills
Factor in the cost of living in the location of the job
Be prepared to negotiate based on benefits and perks offered
Provide a range rather than a specific number
posted on 13 Sep 2024
Manpower can be effectively handled by proper planning, communication, training, and motivation.
Develop a clear plan for manpower allocation and scheduling.
Communicate effectively with the team to ensure everyone is on the same page.
Provide necessary training and resources to enhance skills and productivity.
Motivate the team through recognition, rewards, and a positive work environment.
posted on 21 Mar 2024
I applied via Walk-in
Technical skills about maching process
About presonal detail.
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
OEE calculation is a measure of manufacturing productivity that combines availability, performance, and quality metrics.
OEE stands for Overall Equipment Effectiveness
It is calculated by multiplying availability, performance, and quality percentages
OEE helps identify areas for improvement in manufacturing processes
Example: If a machine has 90% availability, 95% performance, and 98% quality, its OEE would be 83.79%
OEE is...
Poka yoke is a technique used in manufacturing to prevent errors, while CAPA stands for Corrective and Preventive Action.
Poka yoke is a Japanese term meaning 'mistake-proofing' or 'error-proofing'. It involves designing a process or system in a way that prevents mistakes or errors from occurring.
Poka yoke techniques can include using sensors, alarms, or physical devices to detect and prevent errors.
For example, a poka ...
Production is the process of creating goods or services, while productivity is the measure of efficiency in producing those goods or services.
Production refers to the creation of goods or services, while productivity measures the efficiency of that production.
Production is a process, while productivity is a measure.
Production can be increased by adding more resources, while productivity can be increased by improving pr...
TPM stands for Total Productive Maintenance and JH stands for Job Hazard Analysis. JH 7 steps are the steps involved in conducting a JH analysis.
TPM is a maintenance strategy aimed at maximizing the productivity of equipment and minimizing downtime.
JH is a safety analysis technique used to identify potential hazards in a job or task.
JH 7 steps involve breaking down a job into steps, identifying potential hazards, deter...
Check sheet is a tool used to collect and analyze data. WSQC, SWC, and WES are not commonly used acronyms in relation to production engineering.
Check sheet is a simple data collection tool used to track defects or issues in a process
WSQC, SWC, and WES are not commonly used acronyms in production engineering
However, there are similar tools like the 5S methodology or the DMAIC process for continuous improvement
7QC tools check sheet is a document used to collect and analyze data, while Pareto diagram is a graphical representation of the data.
7QC tools check sheet is used to identify and solve problems in production processes
It helps in collecting and analyzing data related to the process
Pareto diagram is a bar graph that shows the relative frequency or size of problems in descending order of importance
It helps in identifying ...
Rejection handling is the process of identifying and addressing rejected products. Red bin analysis is a method of analyzing rejected products to determine the cause of rejection.
Rejection handling involves identifying and segregating rejected products
Red bin analysis involves analyzing rejected products to determine the root cause of rejection
The data collected during red bin analysis can be used to improve production...
Manpower handling refers to managing and organizing the workforce in a production environment.
It involves recruiting, training, and scheduling employees
Ensuring safety and compliance with regulations
Motivating and supervising workers
Optimizing productivity and efficiency
Dealing with conflicts and resolving issues
Examples include managing a production line, overseeing a team of technicians, or coordinating shifts in a f
Kaizen is a Japanese term for continuous improvement while CAPA stands for Corrective and Preventive Action.
Kaizen involves making small, incremental improvements to processes and systems over time.
CAPA is a process used to identify and address the root cause of a problem or nonconformity.
Kaizen and CAPA are both important tools for improving quality and efficiency in manufacturing and other industries.
Examples of kaiz...
Efficiency in production engineering refers to the ratio of output to input.
Efficiency is a measure of how well resources are utilized in the production process.
It is calculated as the ratio of output to input.
Higher efficiency means more output is produced with the same amount of input.
Efficiency can be improved by optimizing processes, reducing waste, and increasing automation.
For example, reducing the time it takes ...
4m changing formats refers to the process of changing the format of a production line from one product to another.
It involves reconfiguring the machinery and equipment to accommodate the new product
It may require changing the packaging, labeling, and other materials used in the production process
It is a common practice in manufacturing to increase efficiency and flexibility
Example: Changing a production line from makin
KPI instruction refers to the guidelines or rules that define how key performance indicators (KPIs) should be measured and reported.
KPI instruction provides a framework for measuring and reporting KPIs consistently and accurately.
It outlines the specific metrics that should be tracked and how they should be calculated.
KPI instruction also includes guidelines for setting targets and benchmarks for KPIs.
Examples of KPI i...
ISO-TS audit is a quality management system audit for automotive industry.
ISO-TS audit is a quality management system audit for automotive industry
It is based on ISO 9001 standard and specific requirements for automotive industry
It focuses on ensuring product quality, safety, and customer satisfaction
It involves auditing the entire production process from design to delivery
Examples of ISO-TS audit include audits of car
Line and machining processing are methods used in manufacturing to produce products efficiently and accurately.
Line processing involves a series of steps in which a product is assembled or produced in a linear fashion.
Machining processing involves the use of machines to shape and cut materials into specific shapes and sizes.
Both methods are used to increase efficiency and accuracy in manufacturing processes.
Examples of...
I was interviewed before Aug 2022.
Reducing machining cycle time can be achieved by optimizing tool paths, using high-speed machining techniques, implementing automation, and improving machine maintenance.
Optimize tool paths to reduce unnecessary movements and minimize idle time.
Utilize high-speed machining techniques to increase cutting speeds and feed rates.
Implement automation such as robotic loading and unloading to reduce manual handling time.
Regul...
To reduce air cutting from machine with ECRS Methodology, adjust cutting parameters, optimize tool paths, use high-quality cutting tools, and implement proper maintenance.
Adjust cutting parameters such as speed, feed rate, and depth of cut to minimize air cutting.
Optimize tool paths to ensure efficient cutting and reduce unnecessary movements.
Use high-quality cutting tools that are sharp and well-maintained to improve ...
based on 1 review
Rating in categories
HR Manager
3
salaries
| ₹8 L/yr - ₹8 L/yr |
Assistant Engineer
3
salaries
| ₹2.5 L/yr - ₹2.6 L/yr |
Production Planner
3
salaries
| ₹2.4 L/yr - ₹2.7 L/yr |
Dhoot Transmission
ZF Steering Gear
Amphenol Interconnect
Microtek International