Filter interviews by
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
Top trending discussions
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
There was a assessment round after you CV got shortlisted
I applied via Approached by Company and was interviewed in Nov 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Aug 2022. There were 3 interview rounds.
Aluminium formwork is a construction technique that uses lightweight aluminium panels to form concrete walls, floors, and columns.
Aluminium formwork is a modern construction technique that is faster and more efficient than traditional formwork methods.
It involves using lightweight aluminium panels that are easy to handle and can be reused multiple times.
The panels are assembled on site to form the desired shape and siz...
Waterproofing procedure involves applying a waterproof barrier to prevent water from penetrating a building structure.
Identify the areas that need waterproofing such as roofs, walls, and foundations.
Choose the appropriate waterproofing material based on the type of structure and the level of water exposure.
Prepare the surface by cleaning and repairing any cracks or damage.
Apply the waterproofing material using the reco...
Steel Fibre Road Concrete is a type of concrete that contains steel fibres to improve its strength and durability.
Steel fibres are added to the concrete mix to enhance its mechanical properties.
The fibres act as reinforcement and help to prevent cracking and improve resistance to wear and tear.
Steel Fibre Road Concrete is commonly used in the construction of roads, bridges, and other infrastructure projects.
It is also ...
I have experience in piling works including design, installation, and testing of piles.
Designed pile foundations for various structures including bridges and buildings
Installed piles using various methods such as driven piles and drilled shafts
Conducted pile load tests to ensure the capacity of the piles
Managed and supervised piling works on construction sites
Ensured compliance with safety regulations and quality stand
Concrete technology is crucial for site activity as it involves the proper mixing, placing, and curing of concrete.
Understanding the properties of concrete and how it reacts to different conditions
Proper mixing of concrete ingredients to achieve the desired strength and consistency
Ensuring proper placement and compaction of concrete to avoid voids and weak spots
Proper curing of concrete to achieve maximum strength and ...
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
posted on 15 Mar 2025
I appeared for an interview in Sep 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed in Jan 2023. There were 3 interview rounds.
Real estate related to the industry
I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Deputy Manager
58
salaries
| ₹4.8 L/yr - ₹9 L/yr |
Senior Executive
27
salaries
| ₹3.5 L/yr - ₹8.5 L/yr |
Senior Executive Finance & Accounts
22
salaries
| ₹4.5 L/yr - ₹6.6 L/yr |
Manager
17
salaries
| ₹6 L/yr - ₹10.6 L/yr |
Senior Engineer
17
salaries
| ₹4.2 L/yr - ₹7 L/yr |
Nyati Group
Aliens Group
Smartworks
Knight Frank