Filter interviews by
I applied via Walk-in and was interviewed in Jun 2022. There was 1 interview round.
Top trending discussions
I appeared for an interview in Feb 2023.
Self introduction, previous experience of working.
Shear force diagram shows the variation of shear force along the length of a beam, while bending moment diagram shows the variation of bending moment.
Shear force diagram is a graph of shear force plotted against the length of the beam.
Bending moment diagram is a graph of bending moment plotted against the length of the beam.
Shear force changes sign at point of applied load or reaction, while bending moment is zero at t...
Consumption of material as per IS code refers to the quantity of material required for construction as per Indian Standards.
Consumption of material is calculated based on the specifications provided in the relevant IS code for construction.
It includes factors such as type of material, dimensions, quality standards, and wastage allowances.
For example, IS 456 for concrete specifies the mix proportions of cement, sand, an...
Seeking new challenges and opportunities for growth.
Looking for a new challenge to further develop my skills and knowledge.
Interested in exploring new opportunities for career advancement.
Seeking a company with a better cultural fit or work-life balance.
Want to work on more innovative projects or in a different industry.
Previous company downsized or restructured, leading to job loss.
I built the company to a standard level by implementing best practices, fostering a culture of continuous improvement, and ensuring alignment with industry standards.
Implemented best practices in engineering processes and project management
Fostered a culture of continuous improvement through regular training and feedback sessions
Ensured alignment with industry standards and certifications such as ISO, ASME, or API
Regul...
Technically and mathematics and our I q test
Measurements for project drawings and quantities can be determined through detailed analysis and calculations.
Measurements can be taken directly from the project drawings using scales and measuring tools.
Quantities can be calculated based on the dimensions provided in the drawings.
Software tools like AutoCAD and Revit can also be used to accurately measure quantities and dimensions.
Bill of Quantities (BOQ) can be prepa...
I applied via Company Website
Dressing and personality
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
The structure work at the site involves the construction of a new building using steel beams and concrete columns.
Steel beams are being used for the framework of the building
Concrete columns are being installed to support the structure
The construction process includes pouring concrete, welding steel beams, and erecting walls
Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.
Coordinate with contractors and subcontractors to ensure work is completed on time and within budget
Monitor progress of construction activities and address any issues that may arise
Ensure compliance with safety regulations and quality standards
Communicat...
I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.
Copy Monitor is a Revit tool that allows users to monitor and synchronize changes made to linked models.
Copy Monitor is used in Revit to ensure that changes made to linked models are reflected in the current model.
It allows users to monitor and synchronize changes made to linked models.
Copy Monitor can be used to track changes to elements such as walls, floors, and roofs.
It can also be used to monitor changes to parame...
Revit models can be linked using the 'Link Revit' tool in the 'Insert' tab.
Open the host model and go to the 'Insert' tab.
Click on 'Link Revit' and select the model to be linked.
Choose the appropriate settings for the link, such as positioning and visibility.
Repeat the process for any additional models to be linked.
Save the host model to ensure the links are maintained.
They gave an architectural model to create a structural model
I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.
Types of paints and tiles commonly used in construction projects.
Types of paints: acrylic, latex, oil-based, enamel, spray paint
Types of tiles: ceramic, porcelain, glass, natural stone, mosaic
We are using steel bars of grade Fe500D at the site.
We are using steel bars of grade Fe500D for construction purposes.
These bars have high strength and ductility.
They are corrosion-resistant and have good bonding with concrete.
We are using bars of different diameters as per the structural requirements.
We are following the guidelines of the Indian Standards for reinforcement steel.
We are ensuring proper storage and hand...
Yes, I know how to prepare Barbending schedule.
I am familiar with the bar bending schedule (BBS) and its importance in construction projects.
I can read and interpret structural drawings to identify the required reinforcement details.
I have experience in using software such as AutoCAD and Excel to prepare BBS.
I am aware of the standard codes and practices for preparing BBS.
I can communicate effectively with the project ...
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Junior Engineer
29
salaries
| ₹2.1 L/yr - ₹4.8 L/yr |
Senior Engineer
12
salaries
| ₹3 L/yr - ₹8 L/yr |
Store Keeper
9
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Civil Engineer
9
salaries
| ₹3.5 L/yr - ₹7.5 L/yr |
Senior Civil Engineer
8
salaries
| ₹5.5 L/yr - ₹11.5 L/yr |
Sobha
Godrej Properties
DLF
Omaxe