Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Magicrete Building Solutions Team. If you also belong to the team, you can get access from here

Magicrete Building Solutions Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Magicrete Building Solutions Boiler Engineer Interview Questions, Process, and Tips

Updated 14 Apr 2023

Magicrete Building Solutions Boiler Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Mar 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Take 15 questions to solve

Round 3 - Technical 

(5 Questions)

  • Q1. Bed height of boiler
  • Ans. 

    Bed height of a boiler refers to the height of the bed of solid fuel in the combustion chamber.

    • Bed height is an important factor in determining the efficiency of a boiler.

    • It affects the combustion process and the amount of heat transfer to the water.

    • The ideal bed height varies depending on the type of fuel and the design of the boiler.

    • For example, a bed height of 6-8 inches is recommended for coal-fired boilers.

    • Regular...

  • Answered by AI
  • Q2. Welding electrodes used in fabrication
  • Ans. 

    Welding electrodes are used in fabrication to join two metal pieces together.

    • Welding electrodes come in different types and sizes depending on the metal being welded and the welding technique used.

    • Some common types of welding electrodes include stick electrodes, MIG electrodes, and TIG electrodes.

    • The choice of welding electrode also depends on the thickness of the metal being welded and the welding position.

    • Proper stor...

  • Answered by AI
  • Q3. Bearing size calculation
  • Q4. Boiler types and steam
  • Ans. 

    Boilers are classified into fire-tube and water-tube types. Steam is generated by heating water in the boiler.

    • Fire-tube boilers have hot gases from combustion passing through tubes which are surrounded by water.

    • Water-tube boilers have water flowing through tubes which are heated by hot gases from combustion.

    • Steam is generated when water is heated in the boiler and the resulting steam is used for various applications su...

  • Answered by AI
  • Q5. Types of steam produce by boiler
  • Ans. 

    Boilers produce two types of steam: saturated and superheated.

    • Saturated steam is produced when water is heated to its boiling point and vaporizes with no further increase in temperature.

    • Superheated steam is produced when saturated steam is heated above its boiling point, resulting in a higher temperature and energy content.

    • Saturated steam is commonly used for heating and power generation, while superheated steam is use...

  • Answered by AI

Interview questions from similar companies

I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 6 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about your self
  • Q2. Current profile Experience
Round 3 - Technical 

(2 Questions)

  • Q1. Costing of Commodities
  • Ans. 

    Costing of commodities involves determining the expenses incurred in producing and selling goods.

    • Costing involves identifying all the direct and indirect costs associated with producing a commodity

    • Direct costs include raw materials, labor, and manufacturing expenses

    • Indirect costs include overhead expenses such as rent, utilities, and administrative costs

    • The total cost is then divided by the number of units produced to ...

  • Answered by AI
  • Q2. Commercial terms and Conditions
Round 4 - Aptitude Test 

Total 30 questions each carrying 1 mark.
Passing marks are 19. The test was conducted online.

Round 5 - Technical 

(4 Questions)

  • Q1. Domain Questions basically of Engineering level
  • Q2. Weight Calculations of mechanical systems.
  • Ans. 

    Weight calculations are crucial for designing and analyzing mechanical systems.

    • Weight calculations involve determining the weight of individual components and the overall system.

    • This information is used to ensure that the system can support its own weight and any additional loads.

    • Factors such as material density, dimensions, and distribution of weight must be taken into account.

    • Computer-aided design (CAD) software can ...

  • Answered by AI
  • Q3. Questions on Engineering favourite Subjects.
  • Q4. Work Location Based Discussion
Round 6 - HR 

(1 Question)

  • Q1. Salary Expectations and Joining details

Interview Preparation Tips

Interview preparation tips for other job seekers - Be well prepared with your Resume. Prepare about weight Calculations of mechanical systems.
Basics of cost estimations and ICC terms.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jan 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. WTP structure & Hydrolic Diagram
  • Ans. 

    WTP structure & Hydraulic Diagram involves understanding the layout and components of a water treatment plant.

    • Water treatment plant (WTP) structures typically include intake structures, treatment units, storage tanks, and distribution systems.

    • Hydraulic diagrams show the flow of water through the plant, including pumps, pipes, valves, and other equipment.

    • Understanding the WTP structure and hydraulic diagram is cruci...

  • Answered by AI
  • Q2. Quality assurance
  • Q3. BOQ

I applied via Campus Placement and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Group Discussion 

Latest topic on political , economy etc .

Round 2 - Aptitude Test 

Easy question of 100 marks . Negative marking was thereb

Interview Preparation Tips

Interview preparation tips for other job seekers - Do fill the form . Worst company for freshers.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About yourself and qualification
Round 3 - One-on-one 

(1 Question)

  • Q1. Job related knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - be confident precise and smart answers. ask your salary demands

I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Job related questions
  • Q2. Product knowledge, previous background

Interview Preparation Tips

Interview preparation tips for other job seekers - Go to the website and read about their wife range of products
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Introduce yourself with specific details
  • Q2. Job Experience on the profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself and explain in detail with confident on yours.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 6 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Production related , Compound related, maintenance related, administration
Round 3 - HR 

(1 Question)

  • Q1. 5'S related and administration
Round 4 - Technical 

(1 Question)

  • Q1. Production related and others department
Round 5 - One-on-one 

(1 Question)

  • Q1. Shop floor related and behavior
Round 6 - Aptitude Test 

By given question's answer by me

Interview Preparation Tips

Interview preparation tips for other job seekers - Excellent work here

I applied via Naukri.com and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All technical questions on PLC, servo drives, VFD, instruments like thermocouples and pyrometers

Interview Preparation Tips

Interview preparation tips for other job seekers - There will 3 rounds, 2 technical and 1 HR round
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. What in jafar cement
  • Ans. 

    Jafar Cement is a leading cement manufacturer known for its high-quality products and innovative solutions.

    • Jafar Cement produces a variety of cement products for construction purposes.

    • The company is known for its commitment to quality and customer satisfaction.

    • Jafar Cement has a strong presence in the market and is a preferred choice for many construction projects.

  • Answered by AI

Magicrete Building Solutions Interview FAQs

How many rounds are there in Magicrete Building Solutions Boiler Engineer interview?
Magicrete Building Solutions interview process usually has 3 rounds. The most common rounds in the Magicrete Building Solutions interview process are Resume Shortlist, Aptitude Test and Technical.
What are the top questions asked in Magicrete Building Solutions Boiler Engineer interview?

Some of the top questions asked at the Magicrete Building Solutions Boiler Engineer interview -

  1. Types of steam produce by boi...read more
  2. Welding electrodes used in fabricat...read more
  3. Boiler types and st...read more

Tell us how to improve this page.

Magicrete Building Solutions Boiler Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Prism Cement Interview Questions
3.7
 • 16 Interviews
WPIL Interview Questions
3.6
 • 16 Interviews
Apollo Pipes Interview Questions
3.9
 • 11 Interviews
Lafarge Interview Questions
4.3
 • 10 Interviews
View all
Assistant Manager
34 salaries
unlock blur

₹4 L/yr - ₹7.2 L/yr

Senior Executive
23 salaries
unlock blur

₹3 L/yr - ₹5.8 L/yr

Senior Manager
17 salaries
unlock blur

₹7.2 L/yr - ₹15.5 L/yr

Deputy Manager
15 salaries
unlock blur

₹4.8 L/yr - ₹10.3 L/yr

Sales Executive
13 salaries
unlock blur

₹3.6 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Magicrete Building Solutions with

A-1 Fence Products

4.0
Compare

Prism Cement

3.7
Compare

Lafarge

4.3
Compare

Simpolo Vitrified

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview