Productivity refers to the efficiency of production processes and the output generated relative to the input.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It can be calculated by dividing output by input, such as units produced per hour of labor.
Improving productivity often involves optimizing processes, reducing waste, and increasing efficiency.
Examples include implementi...
The acceptable percentage of rejection in production varies depending on industry standards and company goals.
Acceptable rejection rates typically range from 1-5% in most industries.
Some industries, such as automotive or aerospace, may have stricter standards with rejection rates below 1%.
Continuous improvement efforts aim to reduce rejection rates over time.
Factors like product complexity, production process, and qual...
Inventory, rejection control, and material management are essential aspects of production engineering.
Inventory refers to the stock of raw materials, work-in-progress, and finished goods that a company holds for production and sales.
Rejection control involves implementing measures to minimize the rejection of defective products during the manufacturing process.
Material management includes planning, sourcing, purchasing...
posted on 11 Sep 2023
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Oct 2022. There were 2 interview rounds.
Electrical and Electronic test
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
General SSC level aptitude
posted on 3 Nov 2021
Testing for oil leakage in transformers involves visual inspection, oil analysis, and pressure testing.
Visual inspection of the transformer for any signs of oil leakage
Oil analysis to check for any abnormal levels of dissolved gases or contaminants
Pressure testing to check for any leaks in the transformer's oil-filled compartments
Use of ultrasonic testing to detect any leaks in the transformer's tank
Regular maintenance
I will conduct a thorough testing and inspection process to identify any errors in the Feeder.
Perform visual inspection of the Feeder
Conduct electrical testing to ensure proper functioning
Check for any loose connections or damaged components
Compare the Feeder's performance to the expected results
Review any error logs or system alerts
Consult with colleagues or experts for additional input
Types of brick, how to check brick quality, Cement IS code and quality check, Pipe IS code
Types of bricks include clay bricks, concrete bricks, fly ash bricks, etc.
To check brick quality, look for uniform shape, size, color, sound when struck, and absence of cracks.
Cement quality is checked using IS code 12269:1987. Quality can be checked by conducting tests like fineness, setting time, compressive strength, etc.
Pipe q...
I applied via Walk-in and was interviewed before Dec 2023. There were 3 interview rounds.
posted on 2 May 2024
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
based on 2 interviews
Interview experience
based on 9 reviews
Rating in categories
Assistant Manager
29
salaries
| ₹4.8 L/yr - ₹8.2 L/yr |
Production Engineer
29
salaries
| ₹2.1 L/yr - ₹5 L/yr |
Regional Business Manager
23
salaries
| ₹10.6 L/yr - ₹24 L/yr |
Area Sales Manager
21
salaries
| ₹6 L/yr - ₹9.9 L/yr |
Senior Engineer
20
salaries
| ₹3.2 L/yr - ₹5.2 L/yr |
Bureau Veritas
SGS
CMS Infosystems
Intertek