Upload Button Icon Add office photos

Filter interviews by

LC Infra Projects Mechanical Engineer Interview Questions and Answers

Updated 21 Oct 2023

LC Infra Projects Mechanical Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Tell me how process calculation is done
  • Ans. 

    Process calculation involves analyzing data, applying formulas, and making decisions based on the results.

    • Gather relevant data such as measurements, specifications, and requirements

    • Apply appropriate formulas and equations to analyze the data

    • Interpret the results to make informed decisions and adjustments

    • Examples: calculating stress and strain in a mechanical component, determining flow rates in a piping system

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Strengths, weakness

Interview Preparation Tips

Interview preparation tips for other job seekers - Know about process details and specifics of the machines.

Skills evaluated in this interview

Interview questions from similar companies

I applied via Naukri.com and was interviewed before May 2018. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Questions are related to your past working experience and the position that you applied for Microwave Transmission related questions: What is Microwave and types What is fadind and it's resolution steps D...
  • Q2. PDH-SDH related questions- Difference between PDH and sdh Frame structure of sdh High order and low order bytes and alarms related to bytes Alarms in sdh Ethernet over sdh What is GFP, ENCAPSULATION, VCAT,...
  • Q3. Generally your current work related questions Why you want to change your job What is your expectations from new job Where you seeing your self after 5 year's Current salary and expectations

Interview Preparation Tips

Round: HR Round
Experience: Related to offer they are giving and related cross questions

General Tips: I had been interviewed with Huawei in 2016 and total 2 rounds was there for me. Questions I already had shared, go through it.

I got my offer letter after 1 month after HR discussion but please follow up with HR team once you get call for your selection
Skills: Ethernet over SDH, SDH, Microwave, Technical Knowledge(ML, Microwave, Communication, Presentation Skills
Duration: 1-3 Months

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Experience related question
  • Q2. My self introduction

Interview Preparation Tips

Interview preparation tips for other job seekers - When interview will be 6 day ago tell me Sir 🙏

I applied via Campus Placement and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is the most challenging situation you have been through in your career?

Interview Preparation Tips

Interview preparation tips for other job seekers - To ace an interview you need to be a good listener as much as a good speaker. Try to listen and understand what the interviewer is asking and then reply. Never be in a hurry to answer, take time. If you did not understand what interviewer is asking simply ask him to repeat, pls don't presume anything and answer anything that comes to your mind. Most importantly never fake in an interview just try to be your best...

I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my work experience & my self
  • Q2. Tell me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always candidates have good knowledge of relevant work.and be confident about it,interviewrs always seeing your confidence level and skills.

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

Interview Questionnaire 

1 Question

  • Q1. Technical questions and more scenario based questions. Performance related questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - It was a quick process which took just 6 days to complete the interviews and to get offer.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. Manufacturing of cement, Durability of concrete, Chemical reaction of cement with water.
  • Ans. 

    The manufacturing of cement involves chemical reactions with water, resulting in the durability of concrete.

    • Cement is made by heating limestone, clay, and other materials in a kiln

    • The chemical reaction between cement and water, known as hydration, results in the hardening of concrete

    • The durability of concrete depends on factors such as the water-cement ratio, curing time, and quality of materials used

  • Answered by AI
  • Q2. Why LnT, Where do you see yourself after 5 years, SWOT analysis, About LnT
  • Q3. Calculate deflection at the free end of a cantilever beam with a point load at the end
  • Ans. 

    Calculate deflection at free end of cantilever beam with point load at end

    • Use the formula: δ = (PL³)/(3EI)

    • P is the point load at the end

    • L is the length of the cantilever beam

    • E is the modulus of elasticity of the beam material

    • I is the moment of inertia of the beam's cross-sectional area

    • Example: A steel cantilever beam with a length of 2 meters and a point load of 500 N at the end has a deflection of 0.104 mm

  • Answered by AI
  • Q4. What is camber, How do we provide camber, Steps for the construction of a Road
  • Ans. 

    Camber is the slope provided to the road surface to drain off rainwater. It is achieved by raising the center of the road surface.

    • Camber is the curvature provided to the road surface to ensure proper drainage of rainwater.

    • It is achieved by raising the center of the road surface.

    • The amount of camber depends on the width of the road and the expected rainfall.

    • The steps for the construction of a road include surveying, cle...

  • Answered by AI
  • Q5. What is an admixture, How do they affect the concrete, name various admixtures.
  • Ans. 

    Admixtures are chemicals added to concrete to enhance its properties. They affect the workability, strength, and durability of concrete.

    • Admixtures are added to concrete to improve its quality and performance.

    • They can affect the setting time, workability, strength, and durability of concrete.

    • Examples of admixtures include water reducers, accelerators, retarders, air-entraining agents, and superplasticizers.

  • Answered by AI
  • Q6. What is hoop stress, How to provide reinforcement in a dome
  • Ans. 

    Hoop stress is the stress exerted circumferentially in a cylindrical or spherical object. Reinforcement in a dome can be provided by using steel bars or mesh.

    • Hoop stress is caused by the pressure inside the object and is calculated using the formula P*r/t, where P is the pressure, r is the radius, and t is the thickness of the object.

    • In a dome, reinforcement can be provided by using steel bars or mesh that are placed i...

  • Answered by AI
  • Q7. What is estimation and costing, No. of bricks required in 1 m3 of brickwork, various types of contracts
  • Ans. 

    Estimation and costing involves calculating the expenses of a project. No. of bricks required in 1 m3 of brickwork depends on the size of the bricks. There are various types of contracts in construction.

    • Estimation and costing involves calculating the expenses of a project, including materials, labor, and other costs.

    • No. of bricks required in 1 m3 of brickwork depends on the size of the bricks used. For example, if stan...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and don't try to bluff them, if you don't know the answer simply tell them that I can't recall the answer at the moment don't beat them around the bushes.

I applied via Campus Placement and was interviewed in Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

120 questions in 120 minutes. 30 questions from English,30 questions from your stream,30 basic aptitude,30 current affairs type question

Round 3 - Technical 

(2 Questions)

  • Q1. Tell me about 4 stroke diesel or petrol engine?
  • Ans. 

    A 4 stroke engine is an internal combustion engine that completes 4 strokes in one cycle.

    • The four strokes are intake, compression, combustion, and exhaust.

    • In the intake stroke, the fuel-air mixture is drawn into the cylinder.

    • In the compression stroke, the mixture is compressed to increase its temperature and pressure.

    • In the combustion stroke, the mixture is ignited and the resulting explosion pushes the piston down.

    • In ...

  • Answered by AI
  • Q2. What is laser beam welding?
  • Ans. 

    Laser beam welding is a process of joining two metal pieces using a laser beam.

    • Laser beam welding is a non-contact process.

    • It uses a high-energy laser beam to melt and fuse the metal pieces together.

    • It is commonly used in the automotive, aerospace, and electronics industries.

    • It produces a narrow and deep weld with minimal distortion.

    • Examples include welding of car body parts, aircraft engine components, and electronic

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on one domain of subjects like manufacturing process & Thermal engineering etc.

LC Infra Projects Interview FAQs

How many rounds are there in LC Infra Projects Mechanical Engineer interview?
LC Infra Projects interview process usually has 3 rounds. The most common rounds in the LC Infra Projects interview process are Resume Shortlist, One-on-one Round and HR.

Tell us how to improve this page.

LC Infra Projects Mechanical Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more
Senior Engineer
18 salaries
unlock blur

₹4.4 L/yr - ₹7.2 L/yr

Civil Site Engineer
15 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Billing Engineer
10 salaries
unlock blur

₹3 L/yr - ₹4.9 L/yr

Site Engineer
10 salaries
unlock blur

₹2.5 L/yr - ₹4.6 L/yr

Executive Accountant
9 salaries
unlock blur

₹2 L/yr - ₹3.8 L/yr

Explore more salaries
Compare LC Infra Projects with

Quess

3.8
Compare

L&T Construction

4.0
Compare

Ekart Logistics

3.9
Compare

Udaan

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview