Filter interviews by
I applied via Walk-in and was interviewed before Nov 2019. There were 3 interview rounds.
Overhauling procedure of turbine and generator involves disassembly, inspection, repair, and reassembly.
Disassemble turbine and generator components
Inspect components for wear and damage
Repair or replace damaged components
Reassemble components and test for proper function
I applied via Referral and was interviewed in Nov 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Apr 2021. There were 3 interview rounds.
The basic IEC standards in PV module design & type qualification are IEC 61215 and IEC 61730 for design qualification, and IEC 61215 and IEC 61730 for type qualification. The safety qualification standard is IEC 61730.
IEC 61215 is the standard for crystalline silicon terrestrial photovoltaic (PV) modules
IEC 61730 is the standard for safety qualification of PV modules
Design qualification ensures the module design meets ...
Solar backsheet layers provide protection and insulation for solar panels.
Solar backsheet layers are typically made of a combination of materials such as polyester, fluoropolymer, and ethylene-vinyl acetate (EVA).
The backsheet layers act as a barrier against moisture, UV radiation, and other environmental factors that can degrade the solar cells.
They also provide electrical insulation to prevent short circuits and ensu...
I applied via Naukri.com and was interviewed before Apr 2021. There were 3 interview rounds.
I have extensive domain experience in the field of finance.
I have worked in the finance industry for over 10 years.
I have experience in financial analysis, budgeting, and forecasting.
I have managed teams responsible for financial reporting and compliance.
I have worked with various financial software and tools such as QuickBooks and Excel.
I have also kept up-to-date with industry trends and regulations through attending
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Feb 2024. There were 2 interview rounds.
Solar cells are devices that convert sunlight into electricity, while solar modules are made up of multiple solar cells connected together.
Solar cells are typically made of silicon and other materials that can generate electricity when exposed to sunlight
Solar modules, also known as solar panels, are made up of multiple solar cells connected together to increase the amount of electricity generated
Solar cells and module...
Solar module RM specifications include size, efficiency, material, and warranty.
Size: Typically ranges from 60 to 72 cells for residential use.
Efficiency: Higher efficiency modules can convert more sunlight into electricity.
Material: Most common materials include monocrystalline silicon, polycrystalline silicon, and thin-film.
Warranty: Usually comes with a warranty ranging from 20 to 25 years.
Eva and Poe are two different costing methods used in accounting.
Eva costing is based on the assumption that all costs are variable, while Poe costing separates costs into fixed and variable components.
Eva costing is simpler and easier to implement, while Poe costing provides a more accurate representation of costs.
Example: Eva costing would allocate the entire cost of a production run to the units produced, while Poe ...
Reliability testing procedures for solar modules according to IEC standards involve various tests to ensure durability and performance.
IEC 61215 and IEC 61646 are the standards for reliability testing of crystalline silicon and thin-film solar modules, respectively.
Tests include thermal cycling, damp heat, humidity freeze, mechanical load, and UV exposure.
These tests simulate harsh environmental conditions to assess th...
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Maintenance Engineer
10
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Mechanical Engineer
9
salaries
| ₹2.1 L/yr - ₹4 L/yr |
Safety Officer
7
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Electrical Foreman
4
salaries
| ₹3.5 L/yr - ₹4.5 L/yr |
Mechanical Maintenance Engineer
4
salaries
| ₹2.2 L/yr - ₹3.3 L/yr |
Sterlite Power
Doosan Power Systems
Inox Wind
Gupta Power Infrastructure