Add office photos
Larsen & Toubro Limited logo
Engaged Employer

Larsen & Toubro Limited

Verified
4.0
based on 18.8k Reviews
Video summary
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Civil Engineer
Experienced
Clear (1)

20+ Larsen & Toubro Limited Civil Engineer Interview Questions and Answers

Updated 5 Oct 2024

Q1. What is the curing formalities for our precast segment???

Ans.

Curing formalities for precast segments involve a specific process to ensure strength and durability.

  • Pre-wetting the segments before casting

  • Covering the segments with wet burlap or plastic sheets

  • Maintaining a moist environment for a specific duration

  • Using curing compounds or membranes to prevent moisture loss

  • Monitoring and controlling temperature and humidity during curing

  • Allowing sufficient curing time before handling or loading the segments

View 21 more answers
right arrow

Q2. What is the concrete quality??

Ans.

Concrete quality refers to the strength, durability, and consistency of the concrete used in construction.

  • Concrete quality is determined by the ratio of cement, water, and aggregates used in the mix.

  • The strength of concrete is measured in pounds per square inch (psi) and is determined by the amount of cement used in the mix.

  • Durability of concrete is determined by its ability to resist weathering, erosion, and chemical attacks.

  • Consistency of concrete refers to its workability ...read more

View 4 more answers
right arrow

Q3. What is civil engineering?

Ans.

Civil engineering is a branch of engineering that deals with the design, construction, and maintenance of the built environment.

  • Civil engineers design and oversee the construction of buildings, roads, bridges, and other infrastructure.

  • They use their knowledge of physics, mathematics, and materials science to ensure that structures are safe, efficient, and sustainable.

  • Civil engineers also play a key role in managing natural resources, such as water and land, and protecting the...read more

View 6 more answers
right arrow

Q4. Intake well excavation procedure

Ans.

Intake well excavation involves several steps to ensure safety and efficiency.

  • Site preparation and marking

  • Excavation of the well using appropriate equipment

  • Installation of support systems to prevent collapse

  • Lining the well with concrete or other materials

  • Installation of pumps and other equipment

  • Testing and commissioning of the well

  • Backfilling and site restoration

View 1 answer
right arrow
Discover Larsen & Toubro Limited interview dos and don'ts from real experiences

Q5. 1) Development length of steel

Ans.

Development length of steel is the length of bar required to transfer the stress from steel to concrete.

  • It is the length of steel bar required to transfer the stress from steel to concrete

  • It depends on the diameter of the bar, type of steel, and the grade of concrete

  • It is calculated using the formula Ld = (phi x fy x Ast) / (4 x sigma_st x sqrt(fck))

  • For example, for a 20mm diameter bar, grade Fe500 steel, and M20 grade concrete, the development length is 44cm

View 1 answer
right arrow

Q6. Previous project cost

Ans.

The previous project cost was within the allocated budget.

  • The cost of the previous project was carefully managed to ensure it stayed within the allocated budget.

  • Efficient cost control measures were implemented to prevent any overspending.

  • Regular monitoring and tracking of expenses were conducted to ensure adherence to the budget.

  • Cost-saving strategies, such as value engineering, were employed to optimize project expenses.

  • The project team collaborated closely with suppliers an...read more

View 1 answer
right arrow
Are these interview questions helpful?

Q7. What is highway engineering?

Ans.

Highway engineering is a branch of civil engineering that deals with the design, construction, and maintenance of highways and roads.

  • It involves planning and designing highways and roads to ensure safe and efficient transportation.

  • Highway engineers consider factors such as traffic volume, speed, and safety when designing roads.

  • They also oversee the construction and maintenance of highways and roads to ensure they meet safety standards and are in good condition.

  • Examples of hig...read more

Add your answer
right arrow

Q8. What is safety on site?

Ans.

Safety on site refers to the measures and protocols put in place to ensure the well-being and protection of workers and visitors at a construction site.

  • Implementing proper safety training for all workers

  • Enforcing the use of personal protective equipment (PPE)

  • Regular inspections of equipment and machinery

  • Maintaining a clean and organized work environment

  • Having emergency response plans in place

  • Ensuring compliance with safety regulations and standards

Add your answer
right arrow
Share interview questions and help millions of jobseekers 🌟
man with laptop

Q9. What should be the minimum slump of concrete

Ans.

The minimum slump of concrete should be 25 mm according to standards.

  • The minimum slump of concrete is typically specified by standards such as ASTM or ACI.

  • A slump test is conducted to measure the consistency of concrete, with a minimum value of 25 mm usually required.

  • A higher slump value indicates a more workable concrete mix, while a lower value may result in difficulties during placement and compaction.

Add your answer
right arrow

Q10. What is quality?

Ans.

Quality is the measure of excellence or superiority of something.

  • Quality is meeting or exceeding customer expectations.

  • It involves consistency, reliability, and durability.

  • Quality can be subjective and vary depending on the context.

  • Examples include high-quality construction materials, accurate engineering designs, and reliable infrastructure.

  • Quality control measures are implemented to ensure standards are met.

Add your answer
right arrow

Q11. Cost analysis of the work .

Ans.

Cost analysis involves evaluating the expenses associated with a project to determine its financial feasibility.

  • Identify all costs associated with the project, including materials, labor, equipment, permits, and overhead expenses.

  • Estimate the quantities of materials and labor required for the project to calculate costs accurately.

  • Consider any potential cost savings or cost overruns that may impact the overall budget.

  • Compare the estimated costs with the available budget to ens...read more

Add your answer
right arrow

Q12. What is strength on M20 concrete

Ans.

Strength of M20 concrete refers to its compressive strength after 28 days of curing.

  • M20 concrete has a characteristic compressive strength of 20 MPa (megapascals) after 28 days.

  • The strength of M20 concrete can vary depending on factors like water-cement ratio, curing conditions, and quality of materials used.

  • Testing is typically done by casting cubes or cylinders and subjecting them to compression tests.

  • Strength of M20 concrete is important for ensuring the structural integri...read more

View 1 answer
right arrow

Q13. Strength of concrete

Ans.

Strength of concrete is its ability to resist compressive stress.

  • Concrete strength is measured in terms of compressive strength.

  • It is affected by factors such as water-cement ratio, curing time, and aggregate size.

  • The strength of concrete can be improved by using additives such as fly ash or silica fume.

  • Concrete with higher strength is used in structures such as bridges and high-rise buildings.

Add your answer
right arrow

Q14. Define Grade M25

Ans.

Grade M25 is a mix of concrete with a compressive strength of 25 megapascals after 28 days.

  • M25 is a standard mix of concrete used in construction.

  • It is made up of 1 part cement, 1 part sand, and 2 parts coarse aggregate.

  • It has a compressive strength of 25 MPa after 28 days of curing.

  • It is commonly used in the construction of buildings, bridges, and other structures.

  • M25 is suitable for moderate exposure conditions and can withstand moderate wear and tear.

Add your answer
right arrow

Q15. Quantity of materials

Ans.

Quantity of materials is a crucial aspect of any civil engineering project.

  • The quantity of materials needed depends on the project specifications and design.

  • Calculations are done based on the required strength, durability, and safety factors.

  • Factors such as wastage, transportation, and storage also need to be considered.

  • Regular monitoring and updating of material quantities is necessary to ensure project success.

  • Examples of materials include concrete, steel, asphalt, and aggr...read more

Add your answer
right arrow

Q16. What is cement ?

Ans.

Cement is a binding material used in construction to hold together different components of concrete.

  • Cement is a fine powder made from a mixture of limestone, clay, and other minerals.

  • It reacts with water to form a paste that hardens and binds the aggregates together.

  • It provides strength and durability to structures like buildings, bridges, and roads.

  • Different types of cement are available for specific applications, such as Portland cement, slag cement, and fly ash cement.

Add your answer
right arrow

Q17. How to manage site

Ans.

Site management involves planning, organizing, and coordinating resources to ensure a successful construction project.

  • Develop a detailed project plan outlining tasks, timelines, and resources

  • Assign roles and responsibilities to team members

  • Regularly communicate with stakeholders to provide updates and address concerns

  • Implement safety protocols to ensure a secure work environment

  • Monitor progress and adjust plans as needed to stay on track

  • Utilize technology such as project mana...read more

Add your answer
right arrow

Q18. Why do a slump test

Ans.

To determine the workability of concrete mix

  • To ensure the concrete mix has the desired consistency for proper placement and compaction

  • To assess the water content in the concrete mix

  • To check the quality of the concrete mix and its ability to flow and settle

  • To prevent issues such as segregation and bleeding in the concrete mix

  • To meet the specifications and requirements of the project

  • Example: If the slump test result shows a low value, it indicates a stiff mix that may be diffic...read more

Add your answer
right arrow

Q19. Strength of material

Ans.

Strength of material refers to the ability of a material to withstand applied forces without failing.

  • Strength of material is typically measured through tensile, compressive, and shear tests.

  • Factors affecting strength include material composition, manufacturing process, and environmental conditions.

  • Examples of strong materials include steel, concrete, and titanium.

  • Understanding strength of material is crucial in civil engineering for designing structures that can safely suppor...read more

Add your answer
right arrow

Q20. Ready to PAN india

Ans.

Yes, I am ready to work on projects across India.

  • I have experience working on projects in multiple states across India.

  • I am familiar with the different regulations and codes in various regions of India.

  • I am willing to travel and relocate as needed for projects in different parts of the country.

Add your answer
right arrow
Contribute & help others!
Write a review
Write a review
Share interview
Share interview
Contribute salary
Contribute salary
Add office photos
Add office photos

Interview Process at Larsen & Toubro Limited Civil Engineer

based on 19 interviews
4 Interview rounds
Resume Shortlist Round
Technical Round - 1
Technical Round - 2
HR Round
View more
interview tips and stories logo
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Civil Engineer Interview Questions from Similar Companies

Randstad Logo
3.8
 • 12 Interview Questions
View all
Recently Viewed
JOBS
S&P Global
No Jobs
INTERVIEWS
NITYA Software Solutions
No Interviews
INTERVIEWS
Garg Data Information
No Interviews
INTERVIEWS
BirchStreet Systems
No Interviews
INTERVIEWS
Garg Data Information
No Interviews
INTERVIEWS
Redcliffe Labs
No Interviews
INTERVIEWS
Redcliffe Labs
No Interviews
INTERVIEWS
S&P Global
No Interviews
INTERVIEWS
Namas Tech Services
No Interviews
SALARIES
Techno Electric & Engineering Company
Share an Interview
Stay ahead in your career. Get AmbitionBox app
play-icon
play-icon
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter