Filter interviews by
I applied via Referral and was interviewed in Feb 2024. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jan 2020. There were 3 interview rounds.
MHr stands for Man-Hour. Costing is done by calculating the total number of man-hours required for a task and multiplying it by the cost per hour.
MHr stands for Man-Hour, which is a unit of measurement for the amount of work performed by an individual in one hour.
Costing is done by determining the total number of man-hours required for a specific task or project.
The cost per hour is then multiplied by the total number ...
I do not have the current pricing information for ADC 12 & plastic resins.
I apologize, but I do not have the current pricing information for ADC 12 & plastic resins.
I would need to conduct research or consult with a colleague who has access to this information.
Pricing for these materials can fluctuate frequently based on market demand and other factors.
Costing of plastic and casting parts involves analyzing material costs, production processes, and overhead expenses.
Analyze the material costs by considering the type and quantity of plastic or casting material required.
Evaluate the production processes involved in manufacturing the parts, including molding or casting techniques.
Consider the labor costs, machine costs, and energy costs associated with the production pr...
To determine the machine and tool cost for a plastic part.
Analyze the dimensions and material of the plastic part
Identify the required tolerances and surface finish
Consider the production volume and lead time
Research the available machines and their capabilities
Calculate the tooling cost based on the chosen machine
Consider the maintenance and operating costs of the machine
I applied via Referral and was interviewed in Oct 2018. There were 5 interview rounds.
I am drawn to your organisation's commitment to innovation and employee development. I expect opportunities for growth and a supportive work culture.
I am impressed by the company's track record of innovation and success in the industry.
I value the emphasis on employee development and growth opportunities within the organisation.
I am looking for a supportive work culture that values teamwork and collaboration.
I expect c...
posted on 19 Feb 2021
Improving quality requires a focus on continuous improvement and attention to detail.
Establish clear quality standards and metrics
Regularly review and analyze data to identify areas for improvement
Implement processes and procedures to address identified issues
Provide training and support to employees to ensure they understand and can meet quality standards
Encourage a culture of continuous improvement and innovation
I applied via Naukri.com and was interviewed in Dec 2020. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2021. There were 4 interview rounds.
posted on 19 Jan 2021
I appeared for an interview in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
based on 2 interviews
Interview experience
based on 11 reviews
Rating in categories
Senior Technical Lead
20
salaries
| ₹21 L/yr - ₹21.1 L/yr |
Area Sales Manager
9
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Design Engineer
4
salaries
| ₹1.5 L/yr - ₹2 L/yr |
MIS Executive
4
salaries
| ₹1.2 L/yr - ₹1.2 L/yr |
Executive Accountant
4
salaries
| ₹1.4 L/yr - ₹4 L/yr |
Bosch
JBM Group
Samvardhana Motherson Group
Subros