I applied via Walk-in and was interviewed in Oct 2023. There was 1 interview round.
The number of motor earthing points depends on the specific motor and its design.
The number of motor earthing points can vary based on the size and type of motor.
In general, larger motors may have multiple earthing points for safety reasons.
Some motors may have a single earthing point that is connected to the motor casing.
Consult the motor's manual or specifications for the exact number of earthing points.
There are several types of electrical panels, including main breaker panels, subpanels, transfer switches, and distribution boards.
Main breaker panels are the primary electrical panels in a home or building, containing the main breaker for shutting off power to the entire building.
Subpanels are additional panels connected to the main breaker panel, used to distribute power to different areas of the building.
Transfer sw...
Top trending discussions
posted on 17 Jan 2021
I applied via Referral
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
posted on 28 Jul 2023
I applied via Company Website and was interviewed in Jan 2023. There were 3 interview rounds.
posted on 11 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
The interview question is about 1.33kv&11kv BOQ, power transformer description, and the role of CT/PT.
BOQ for 1.33kv and 11kv involves preparing a bill of quantities for electrical equipment and materials required for the project.
Power transformer description includes its specifications, such as voltage rating, power rating, winding configuration, cooling system, etc.
CT/PT (Current Transformer/Potential Transformer) ar...
Answering questions related to electrical engineering
To find if a transformer is star or delta connected, check the connection of the primary and secondary windings
APL/BPL/AGL materials refer to Above Poverty Line/Below Poverty Line/Anti-Graffiti materials used in construction
ROW stands for Right of Way, which is the legal right to pass through a property or land
I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
I am from a small town in the Midwest and I am passionate about environmental conservation.
I grew up in a close-knit community in the Midwest
I have always been interested in protecting the environment
I enjoy outdoor activities like hiking and gardening
I have a Bachelor's degree in Computer Science from XYZ University.
Bachelor's degree in Computer Science
Graduated from XYZ University
Specialized in software development
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
posted on 5 May 2023
I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.
I have extensive commercial experience related to client billing.
Managed client billing for a software company, ensuring timely and accurate invoicing
Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue
Collaborated with sales team to resolve billing discrepancies and improve client satisfaction
posted on 12 Oct 2021
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Electrical Engineer
35
salaries
| ₹1.8 L/yr - ₹5.6 L/yr |
Site Engineer
32
salaries
| ₹1.9 L/yr - ₹4.8 L/yr |
Safety Officer
23
salaries
| ₹2.2 L/yr - ₹5.2 L/yr |
Instrument Engineer
23
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Electrical Technician
22
salaries
| ₹1.6 L/yr - ₹3.5 L/yr |
Lea Associates South Asia
ABCI Infrastructures
VIKRAN Engineering & Exim
The Louis Berger Group