Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by KONE Team. If you also belong to the team, you can get access from here

KONE Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

KONE Mechanical Engineer Interview Questions and Answers

Updated 15 Feb 2022

KONE Mechanical Engineer Interview Experiences

1 interview found

I applied via Company Website and was interviewed before Feb 2021. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 
Round 3 - Tool Test 

(1 Question)

  • Q1. Required for tool test to draw 2D Model in AutoCAD
Round 4 - Technical 

(1 Question)

  • Q1. Basics on Mechanical Engineering & Questions based on my Resume
Round 5 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Brush on Mechanical basics, 2D Modelling, Resume related topics

Interview questions from similar companies

I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions on Process,Simulation, CAD

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Questions will be related to the post which company is offering.
  • Q2. Should be very accurate to all electronics queries

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart and to the point answers will help.

I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain Compilation process steps?
  • Ans. 

    Compilation process involves several steps to convert source code into executable code.

    • Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.

    • Compilation: Translates source code into assembly code.

    • Assembly: Converts assembly code into machine code.

    • Linking: Combines object files and libraries to create an executable file.

    • Loading: Loads the executable file into memory and prepares it

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well prior the interview, revise all the basic concepts of Embedded C and MATLAB if you have applied for embedded systems.

I applied via Walk-in and was interviewed before Jul 2020. There were 7 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to Experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Introduction, jobs & responsibility
Round 2 - Technical 

(1 Question)

  • Q1. As per CV all question
Round 3 - HR 

(1 Question)

  • Q1. Once again introduction, pervious company details information & salary discussion
Round 1 - Technical 

(3 Questions)

  • Q1. Tell me about your work experience
  • Q2. What's the new VRF tech in Daikin
  • Q3. Ikwtr comparison for chiller and vrf
  • Ans. 

    Chiller and VRF systems differ in their cooling capacity, efficiency, and cost.

    • Chillers are better suited for large commercial buildings with high cooling loads.

    • VRF systems are more efficient and cost-effective for smaller buildings or individual rooms.

    • Chillers use water as a cooling medium, while VRF systems use refrigerant.

    • Chillers require more maintenance and have a longer lifespan than VRF systems.

    • VRF systems offer...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. How would you handle different meetings at a time.
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Why are you looking for a change?

Interview Preparation Tips

Interview preparation tips for other job seekers - Have the complete product knowledge.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. How are you going to do this job efficiently
  • Ans. 

    I will prioritize tasks, communicate effectively, utilize resources efficiently, and continuously improve my skills.

    • Prioritize tasks based on importance and deadlines

    • Communicate effectively with team members and stakeholders

    • Utilize resources such as tools and technologies to streamline processes

    • Continuously improve skills through training and learning opportunities

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. Sfd and bmd. Good amount of strength of material was asked.

I applied via Recruitment Consultant and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. CNC programming

Interview Preparation Tips

Interview preparation tips for other job seekers - Be very technical

KONE Interview FAQs

How many rounds are there in KONE Mechanical Engineer interview?
KONE interview process usually has 5 rounds. The most common rounds in the KONE interview process are Resume Shortlist, Aptitude Test and Technical.
How to prepare for KONE Mechanical Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KONE. The most common topics and skills that interviewers at KONE expect are AutoCAD, Mechanical Engineering, Production and Quality.
What are the top questions asked in KONE Mechanical Engineer interview?

Some of the top questions asked at the KONE Mechanical Engineer interview -

  1. Basics on Mechanical Engineering & Questions based on my Res...read more
  2. Required for tool test to draw 2D Model in Auto...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

ABB Interview Questions
4.1
 • 236 Interviews
John Deere Interview Questions
4.1
 • 229 Interviews
Caterpillar Inc Interview Questions
4.2
 • 176 Interviews
Hitachi Interview Questions
4.0
 • 81 Interviews
Atlas Copco Interview Questions
4.2
 • 78 Interviews
Schindler Interview Questions
3.9
 • 76 Interviews
TK Elevator Interview Questions
3.9
 • 54 Interviews
Otis Elevator Interview Questions
4.0
 • 49 Interviews
Johnson Lifts Interview Questions
3.9
 • 39 Interviews
View all
KONE Mechanical Engineer Salary
based on 4 salaries
₹2.5 L/yr - ₹6 L/yr
At par with the average Mechanical Engineer Salary in India
View more details

KONE Mechanical Engineer Reviews and Ratings

based on 6 reviews

4.6/5

Rating in categories

3.9

Skill development

4.6

Work-life balance

4.2

Salary

4.5

Job security

4.1

Company culture

3.9

Promotions

4.4

Work satisfaction

Explore 6 Reviews and Ratings
Design Engineer
191 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
148 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
134 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
115 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Process Agent
113 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare KONE with

Schindler

3.9
Compare

Otis Elevator

4.0
Compare

TK Elevator

3.9
Compare

Johnson Lifts

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview