Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Škoda Auto Volkswagen Team. If you also belong to the team, you can get access from here

Škoda Auto Volkswagen Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Škoda Auto Volkswagen Development Engineer Interview Questions and Answers

Updated 7 Dec 2024

Škoda Auto Volkswagen Development Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell all the process floww for door panel
  • Q2. How will you manage situation

Interview Preparation Tips

Interview preparation tips for other job seekers - Physiological question are asked

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Coding Test 

Study some dsa related questions, like String and array based

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Apr 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Probability, time & distance

Round 2 - Group Discussion 

Advantages and disadvantages of paperless office

Round 3 - HR 

(1 Question)

  • Q1. Previous work experience

I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Open pump house and Tunnels
  • Q2. Road and

Interview Preparation Tips

Interview preparation tips for other job seekers - Navayaga engineering company Ltd

I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Open pump house and Tunnels
  • Q2. Road and

Interview Preparation Tips

Interview preparation tips for other job seekers - Navayaga engineering company Ltd
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is UF SYSTEM
  • Ans. 

    UF SYSTEM stands for Ultrafiltration System, a process used to remove impurities from water by pushing it through a semipermeable membrane.

    • UF SYSTEM is a water treatment process that uses a semipermeable membrane to remove particles, bacteria, and other impurities from water.

    • It is commonly used in wastewater treatment, drinking water purification, and industrial processes.

    • UF SYSTEM operates on the principle of size exc...

  • Answered by AI
  • Q2. What full fom of ED AND PTED

Interview Preparation Tips

Interview preparation tips for other job seekers - Good attitude for all and hard work.respect for individual.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Easy
Process Duration
6-8 weeks
Result
Selected Selected

I was interviewed before May 2023.

Round 1 - Technical 

(5 Questions)

  • Q1. How you handle overall warehouse
  • Ans. 

    I handle overall warehouse operations by implementing efficient processes, optimizing layout, utilizing technology, and managing a skilled team.

    • Implement efficient processes for receiving, storing, and shipping goods

    • Optimize warehouse layout for maximum space utilization and easy access to inventory

    • Utilize technology such as inventory management systems and automation to streamline operations

    • Manage a skilled team by pr...

  • Answered by AI
  • Q2. What is meant by JIT/JIS
  • Ans. 

    JIT/JIS stands for Just-In-Time/Just-In-Sequence, a manufacturing strategy to reduce waste and improve efficiency.

    • JIT/JIS is a production strategy where materials are delivered to the production line exactly when they are needed.

    • This helps reduce inventory costs and waste associated with excess inventory.

    • Just-In-Sequence takes JIT a step further by delivering parts in the exact sequence they are needed for production.

    • B...

  • Answered by AI
  • Q3. What is inventory management
  • Ans. 

    Inventory management involves overseeing the flow of goods from manufacturers to warehouses to retailers, ensuring optimal levels are maintained.

    • Tracking inventory levels in real-time

    • Forecasting demand to prevent stockouts or overstocking

    • Optimizing storage space and organization

    • Implementing barcode or RFID technology for efficient tracking

    • Utilizing inventory management software for automation

    • Managing reorder points and...

  • Answered by AI
  • Q4. What is ABC class items
  • Ans. 

    ABC class items are inventory items categorized based on their importance and value to the business.

    • ABC class items are categorized into three groups: A, B, and C.

    • A class items are the most important and valuable, requiring tight control and frequent monitoring.

    • B class items are moderately important and valuable, requiring regular monitoring.

    • C class items are the least important and valuable, requiring minimal monitori...

  • Answered by AI
  • Q5. How u will manage conflicts

Interview Preparation Tips

Interview preparation tips for other job seekers - Know well about company and cars they are manufacturing
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Oct 2023.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. What was your last project
  • Ans. 

    Designed and implemented a new cloud-based data storage system for a large e-commerce company.

    • Led a team of engineers to analyze requirements and design the system architecture

    • Utilized AWS services such as S3 and RDS for scalable and reliable storage

    • Implemented data encryption and access control measures to ensure data security

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Robot troubleshooting
  • Q2. Mechanical knowledge
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Technicals about powertrain design
  • Q2. Basic questions about function of parts
  • Q3. Basic questions about how to address field concerns
Round 2 - HR 

(1 Question)

  • Q1. Why do you want to join
Contribute & help others!
anonymous
You can choose to be anonymous

Škoda Auto Volkswagen Interview FAQs

How many rounds are there in Škoda Auto Volkswagen Development Engineer interview?
Škoda Auto Volkswagen interview process usually has 1 rounds. The most common rounds in the Škoda Auto Volkswagen interview process are Technical.
How to prepare for Škoda Auto Volkswagen Development Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Škoda Auto Volkswagen. The most common topics and skills that interviewers at Škoda Auto Volkswagen expect are Application Management, CATIA, Web Design and Development, Canva and Doors.
What are the top questions asked in Škoda Auto Volkswagen Development Engineer interview?

Some of the top questions asked at the Škoda Auto Volkswagen Development Engineer interview -

  1. Tell all the process floww for door pa...read more
  2. How will you manage situat...read more

Recently Viewed

INTERVIEWS

Škoda Auto Volkswagen

No Interviews

REVIEWS

Nuclear Power Corporation of India

No Reviews

INTERVIEWS

Škoda Auto Volkswagen

No Interviews

REVIEWS

Nuclear Power Corporation of India

No Reviews

REVIEWS

Nuclear Power Corporation of India

No Reviews

REVIEWS

Nuclear Power Corporation of India

No Reviews

REVIEWS

Nuclear Power Corporation of India

No Reviews

SALARIES

Nuclear Power Corporation of India

REVIEWS

Nuclear Power Corporation of India

No Reviews

REVIEWS

Nuclear Power Corporation of India

No Reviews

Tell us how to improve this page.

Škoda Auto Volkswagen Development Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Motors Interview Questions
4.2
 • 995 Interviews
Maruti Suzuki Interview Questions
4.2
 • 586 Interviews
Hero MotoCorp Interview Questions
4.1
 • 333 Interviews
TVS Motor Interview Questions
4.0
 • 312 Interviews
Bajaj Auto Interview Questions
3.9
 • 267 Interviews
Ashok Leyland Interview Questions
4.1
 • 239 Interviews
View all
Senior Officer
320 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
314 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
239 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
171 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
156 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Škoda Auto Volkswagen with

Maruti Suzuki

4.2
Compare

Hyundai Motor India Limited

4.3
Compare

Tata Motors

4.2
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview