I applied via Approached by Company and was interviewed before Oct 2022. There were 4 interview rounds.
The maximum number of nodes in an S7-300 PLC is 32.
The S7-300 PLC can support up to 32 nodes in a network.
Each node can be a different device such as another PLC, HMI, or drive.
The maximum number of nodes can vary depending on the specific model and configuration of the PLC.
The scan cycle of a PLC refers to the time it takes for the PLC to complete one full cycle of scanning all inputs, executing the program logic, and updating outputs.
The scan cycle consists of three main steps: input scan, program scan, and output scan.
During the input scan, the PLC reads the state of all input devices connected to it.
In the program scan, the PLC executes the user-defined program logic based on the inpu...
Different blocks in Siemens Programming include organization blocks, function blocks, data blocks, and system blocks.
Organization blocks are used for structuring the program and include OB, FB, FC, and DB blocks.
Function blocks contain the actual logic of the program and can be created using the Function Block Diagram (FBD) language.
Data blocks store data and can be accessed by multiple function blocks.
System blocks ar...
Top trending discussions
I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.
Maths and science reasoning gk, current affairs
Coding test questions ask to me
I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.
Coding testcases,java
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Design Engineer
30
salaries
| ₹2.9 L/yr - ₹7 L/yr |
Senior Engineer
23
salaries
| ₹5 L/yr - ₹8 L/yr |
Assistant Manager
19
salaries
| ₹6.6 L/yr - ₹15.3 L/yr |
Engineer
15
salaries
| ₹3 L/yr - ₹6 L/yr |
Mechanical Engg. Design
7
salaries
| ₹4.3 L/yr - ₹5 L/yr |
Sterile
Pharmalab India
Marpu Foundation
Huawei Technologies