I applied via Referral and was interviewed in Oct 2019. There was 1 interview round.
The number of cement bags in 1 cubic meter varies depending on the density of the cement.
The density of cement can range from 1440 to 1840 kg/m^3.
Assuming a density of 1500 kg/m^3, approximately 200 bags of cement would be needed for 1 cubic meter.
To calculate the exact number of bags, divide the density of the cement by the weight of one bag.
The number of bricks in 1 cubic meter varies depending on the size of the bricks.
The size of the bricks affects the number of bricks in 1 cubic meter.
Different brick sizes result in different brick quantities.
To determine the number of bricks, we need to know the dimensions of the bricks.
Top trending discussions
posted on 9 Sep 2021
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
The assembly line sequence involves a step-by-step process of assembling parts to create a final product.
The process starts with the arrival of raw materials
Parts are then assembled in a specific order
Quality checks are performed at various stages
The final product is packaged and shipped
Efficiency and safety are key considerations throughout the process
I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before May 2018. There were 5 interview rounds.
Open loop and closed loop are two modes of operation in hydraulic systems.
Open loop operation: The hydraulic system operates without feedback control. The output is not adjusted based on the system's performance.
Closed loop operation: The hydraulic system uses feedback control to adjust the output based on the system's performance.
Open loop systems are simpler and less expensive, but they lack precision and accuracy.
Cl...
The starting circuit is responsible for initiating the engine's operation.
The starting circuit consists of components such as the battery, starter motor, ignition switch, and solenoid.
When the ignition switch is turned on, it sends a signal to the solenoid, which then engages the starter motor.
The starter motor uses electrical energy from the battery to turn the engine's crankshaft, starting the combustion process.
Once...
I am a highly skilled and experienced service engineer with a proven track record of successfully troubleshooting and resolving complex technical issues.
I have a strong technical background and extensive experience in diagnosing and repairing equipment.
I am a quick learner and can adapt to new technologies and processes easily.
I have excellent communication skills and can effectively communicate with customers and team...
My core values include integrity, accountability, and continuous learning.
Integrity: I believe in always doing the right thing, even when no one is watching.
Accountability: I take ownership of my actions and responsibilities.
Continuous learning: I strive to constantly improve my skills and knowledge.
Example: I once discovered a mistake in a project I was working on, and instead of ignoring it, I took responsibility and...
I applied via Naukri.com
posted on 23 Feb 2022
I appeared for an interview before Feb 2021.
posted on 4 Apr 2022
I applied via Naukri.com and was interviewed before Apr 2021. There was 1 interview round.
posted on 11 Mar 2025
Terminating all engineers can lead to operational disruptions and loss of expertise, impacting service quality and efficiency.
Loss of expertise: Engineers possess specialized knowledge; their termination can create knowledge gaps.
Operational disruptions: Without engineers, maintenance and repairs may be delayed, affecting service delivery.
Increased workload: Remaining staff may face increased pressure, leading to burno...
posted on 12 Apr 2022
Civil Site Engineer
28
salaries
| ₹1.8 L/yr - ₹5.8 L/yr |
Senior Engineer
17
salaries
| ₹2.7 L/yr - ₹6.6 L/yr |
Civil Engineer
15
salaries
| ₹2.3 L/yr - ₹5.1 L/yr |
Store Executive
12
salaries
| ₹2.2 L/yr - ₹3.7 L/yr |
Assistant Engineer - Civil
12
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
Gilbarco Veeder Root
Kirloskar Toyota Textile Machinery
L&T–MHI Power Boilers
Hyundai Construction Equipment