BOQ preparedness involves creating a detailed Bill of Quantities for a project to ensure accurate cost estimation and resource allocation.
Understand the scope of the project and gather all necessary information
Break down the project into smaller components and quantify the materials, labor, and equipment required for each
Use standardized formats and templates for consistency and accuracy
Regularly update the BOQ as the ...
Rate analysis is a method used to calculate the unit rates for various items of work in construction projects.
Identify the items of work to be analyzed
Determine the quantities of materials and labor required for each item
Calculate the total cost for each item by multiplying the quantity with the respective rates
Divide the total cost by the quantity to get the unit rate
Repeat the process for all items and compile the un
The rate per sqft cost of warehousing varies depending on factors like fire fighting, civil works, electrical works, plumbing, etc.
Rate per sqft cost for fire fighting can range from $1.50 to $3.00
Rate per sqft cost for civil works can range from $5.00 to $10.00
Rate per sqft cost for electrical works can range from $2.00 to $4.00
Rate per sqft cost for plumbing can range from $1.00 to $2.50
Vendor selection for work enhancement involves evaluating vendors based on criteria like quality, cost, reliability, and reputation.
Identify the specific needs and requirements of the project or task
Research potential vendors and create a list of candidates
Evaluate vendors based on criteria such as quality of work, cost, reliability, and reputation
Request proposals or quotes from selected vendors
Conduct interviews or m...
Negotiating with vendors involves effective communication, research, and compromise to reach mutually beneficial agreements.
Establish clear objectives and priorities before entering negotiations.
Research market prices and competitors' offers to leverage during negotiations.
Maintain open communication and be willing to compromise to reach a win-win agreement.
Build and maintain a positive relationship with the vendor for...
posted on 28 Feb 2024
I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.
It was online test on DI, logic etc
My SWOT analysis includes strong leadership skills, excellent communication abilities, opportunities for growth, and a need for further development in time management.
Strengths: Strong leadership skills, excellent communication abilities
Weaknesses: Need for further development in time management
Opportunities: Opportunities for growth within the company
Threats: Potential competition from external candidates
posted on 16 Nov 2021
I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Mar 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
posted on 19 Dec 2022
I applied via Walk-in and was interviewed before Dec 2021. There were 4 interview rounds.
I was interviewed before May 2016.
I have strong leadership and communication skills that are better suited for a non-technical role.
I excel in managing teams and resolving conflicts
I have a knack for strategic planning and decision-making
I enjoy interacting with customers and providing excellent service
posted on 25 Oct 2017
I was interviewed before Oct 2016.
Turbine erection alignment and commissioning procedure involves the process of aligning and commissioning a turbine for optimal performance.
Turbine erection alignment involves ensuring the turbine is properly aligned with the foundation and other components.
Commissioning procedure includes testing and verifying the functionality of the turbine.
Alignment is typically done using laser alignment tools to ensure precise po...
The turbine erection sequence refers to the specific order in which the components of a turbine are assembled and installed.
The foundation is prepared and the anchor bolts are installed.
The base frame is positioned and aligned with the anchor bolts.
The turbine tower sections are lifted and assembled on top of the base frame.
The nacelle, which houses the turbine's generator and other components, is installed on top of t...
based on 2 reviews
Rating in categories
Senior Executive
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Operations Executive
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
13
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive Operations
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Suman Auto Parts
Gupta Motors
Malhotra Engineering Works
Jain Motors