Filter interviews by
I applied via Campus Placement and was interviewed in Oct 2023. There were 3 interview rounds.
5S is a workplace organization method that improves efficiency and safety. 3M and 3K refer to the principles of Muda, Mura, and Muri in lean manufacturing. KANBAN is a visual scheduling system used to manage production flow.
5S involves Sort, Set in order, Shine, Standardize, and Sustain to create a clean and organized work environment.
3M (Muda, Mura, Muri) are the three types of waste in lean manufacturing - Muda (wast...
Manpower handling refers to managing and overseeing the workforce in a production setting. Kaizen is a continuous improvement philosophy aimed at making small, incremental changes for efficiency.
Manpower handling involves recruiting, training, scheduling, and supervising employees to ensure smooth production operations.
Kaizen is a Japanese term meaning 'continuous improvement'. It focuses on making small, incremental c...
Top trending discussions
I applied via Job Fair and was interviewed before Mar 2021. There were 4 interview rounds.
Topic for discussion
My strengths include problem-solving, attention to detail, and strong technical skills. My weaknesses include being overly critical of my own work and sometimes struggling with delegation.
Strength: Problem-solving - I enjoy analyzing complex problems and finding efficient solutions.
Strength: Attention to detail - I have a meticulous approach to my work, ensuring accuracy and quality.
Strength: Strong technical skills - ...
I applied via Job Fair and was interviewed before Mar 2021. There were 2 interview rounds.
I am graduation in Mechanical Engineering and also done my diploma mechanical automobile in ghaziabad
I applied via Job Fair and was interviewed before Mar 2021. There were 2 interview rounds.
I am graduation in Mechanical Engineering and also done my diploma mechanical automobile in ghaziabad
I applied via Campus Placement and was interviewed before Mar 2021. There were 3 interview rounds.
I have a strong background in production engineering and a proven track record of improving efficiency and reducing costs.
I have a Bachelor's degree in Production Engineering and have completed internships at two leading manufacturing companies.
I have successfully implemented process improvements that resulted in a 20% increase in production output at my previous job.
I am skilled in using various production software an...
I applied via Campus Placement and was interviewed before Dec 2021. There were 2 interview rounds.
I am a production engineer with experience in optimizing manufacturing processes and improving efficiency.
Experienced in analyzing production data and identifying areas for improvement
Proficient in implementing lean manufacturing principles to reduce waste and increase productivity
Skilled in using CAD software to design and optimize production layouts
Strong problem-solving and troubleshooting abilities
Effective communi...
Metal is a solid material that is typically hard, shiny, malleable, ductile, and a good conductor of heat and electricity.
Metal is a chemical element that is typically found in the Earth's crust.
It is known for its strength, durability, and ability to conduct heat and electricity.
Some common metals include iron, copper, aluminum, gold, and silver.
Metals can be used for a variety of purposes, such as building materials,...
Bernoulli's theorem states that as the speed of a fluid increases, its pressure decreases.
It is a fundamental principle of fluid dynamics
It is based on the conservation of energy in a fluid
It is used to explain the lift of an airplane wing
It is also used in the design of carburetors and Venturi tubes
A BIW fixture is a tool used in automotive manufacturing to hold and position the body-in-white during assembly.
BIW stands for Body-In-White, which refers to the stage of automotive manufacturing where the car body is assembled but not yet painted or trimmed.
The fixture is designed to hold the car body in a precise position during assembly, ensuring that all components fit together correctly.
BIW fixtures are typically ...
321 principle is a method of prioritizing tasks based on their urgency and importance.
The principle suggests dividing tasks into three categories: important and urgent, important but not urgent, and urgent but not important.
Tasks that are both important and urgent should be given the highest priority.
Examples of tasks that fall into each category include: important and urgent - a deadline for a project, important but n...
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
I have a Bachelor's degree in Mechanical Engineering and 5 years of experience in production engineering.
Bachelor's degree in Mechanical Engineering
5 years of experience in production engineering
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 12 reviews
Rating in categories
Diploma Trainee Engineer
281
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Junior Engineer
262
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Assistant Manager
181
salaries
| ₹5.7 L/yr - ₹12 L/yr |
Section Engineer
173
salaries
| ₹3.5 L/yr - ₹7.4 L/yr |
Engineer
146
salaries
| ₹3 L/yr - ₹6.7 L/yr |
Bosch
Faurecia
Hitachi Astemo
Valeo