I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.
posted on 1 Dec 2020
I applied via Referral and was interviewed before Mar 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
Unnatural vibrations in equipments can be reduced by proper maintenance and installation.
Ensure proper alignment of equipment parts
Use vibration dampeners or absorbers
Regularly inspect and replace worn out parts
Install equipment on a stable foundation
Reduce equipment speed or load if possible
I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
posted on 27 Apr 2024
I appeared for an interview before Apr 2023.
Debate on multiple topics
Come out with a conclusion and solutions to a problem
I applied via Referral and was interviewed before Aug 2022. There were 2 interview rounds.
Gearbox overhauling procedure involves disassembling, inspecting, repairing, and reassembling the gearbox to ensure optimal performance.
Start by draining the gearbox oil and removing the gearbox from the vehicle.
Disassemble the gearbox carefully, taking note of the position of each component.
Inspect all parts for wear, damage, or signs of malfunction.
Replace any worn or damaged parts with new ones.
Clean all components ...
Mill alignment procedure involves ensuring the mill components are properly aligned for efficient operation.
Check for any misalignment in the mill components such as the motor, shafts, gears, and bearings.
Use precision tools like dial indicators to measure and adjust the alignment as needed.
Follow the manufacturer's guidelines and specifications for proper alignment procedures.
Regularly monitor and maintain the alignme...
The kiln thrust roller maintenance procedure involves regular inspection, lubrication, and replacement of components to ensure smooth operation.
Regularly inspect the thrust roller for wear and tear
Lubricate the thrust roller bearings to prevent friction
Replace any damaged or worn components to avoid breakdowns
Follow manufacturer's guidelines for maintenance schedule and procedures
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Current CTC is $50,000 and expected CTC is $60,000.
Current CTC: $50,000
Expected CTC: $60,000
posted on 22 May 2024
I applied via Naukri.com and was interviewed in Nov 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed before Oct 2022. There were 3 interview rounds.
based on 3 reviews
Rating in categories
Assistant Manager
3.1k
salaries
| ₹3.6 L/yr - ₹14 L/yr |
Junior Engineer
2.2k
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Deputy Manager
1.7k
salaries
| ₹5.6 L/yr - ₹20 L/yr |
Manager
1.1k
salaries
| ₹7 L/yr - ₹22.6 L/yr |
Senior Engineer
1.1k
salaries
| ₹3 L/yr - ₹10.5 L/yr |
Tata Steel
Jindal Stainless
Jindal Saw
JSW Group