Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.
Top trending discussions
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
I am a production engineer with experience in optimizing manufacturing processes and ensuring efficient production.
Experienced production engineer
Skilled in optimizing manufacturing processes
Ensuring efficient production
Strong knowledge of production equipment and technologies
Proficient in analyzing data and implementing improvements
Collaborative team player
I was a Senior Production Engineer in my previous company.
I held the position of Senior Production Engineer.
I was responsible for overseeing production processes and ensuring efficiency.
I worked closely with the production team to identify and resolve any issues.
I implemented improvements to optimize production output and reduce costs.
I collaborated with other departments to coordinate production schedules and meet dea...
As a Production Engineer, my role is to oversee the manufacturing process, optimize production efficiency, and ensure quality control.
Overseeing the manufacturing process
Optimizing production efficiency
Ensuring quality control
Identifying and resolving production issues
Implementing process improvements
Collaborating with cross-functional teams
Monitoring production metrics and analyzing data
Creating and maintaining produc
DFT in painting stands for Dry Film Thickness.
DFT is the thickness of the paint film after it has dried.
It is measured using a coating thickness gauge.
The DFT is important for ensuring proper protection and appearance of the painted surface.
For example, a coating may require a minimum DFT of 2 mils to provide adequate corrosion protection.
DFT can also affect the drying time and curing of the paint.
Dry film thickness refers to the thickness of a coating after it has dried and cured.
It is measured using a coating thickness gauge.
It is important to ensure that the dry film thickness meets the specifications for the coating.
The dry film thickness can affect the performance and durability of the coating.
Examples of coatings that require specific dry film thickness include paint, powder coating, and plating.
Dry film t...
Excess DFT can lead to increased cost and longer production time.
Excess DFT can lead to increased material usage and waste.
It can also lead to longer production time and increased cost.
The excess DFT may also affect the performance and durability of the product.
It is important to ensure that the DFT is within the specified range to avoid these issues.
I appeared for an interview before Jan 2022.
I applied via Walk-in and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 13 Nov 2021
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
posted on 1 Feb 2024
I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.
Yes, I am ready for relocation.
I am open to moving to a new location for the job.
I am flexible and adaptable to new environments.
I have experience relocating for previous positions.
I am excited about the opportunity to explore a new city or country.
I am willing to make the necessary arrangements and adjustments for relocation.
I applied via Recruitment Consultant and was interviewed in Dec 2020. There was 1 interview round.
Productivity in business refers to the efficiency and effectiveness of the production process.
Productivity is the measure of output per unit of input.
It is important for businesses to maximize productivity to increase profits and remain competitive.
Factors that can affect productivity include technology, employee training, and management practices.
Examples of productivity measures include units produced per hour, reven...
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 3 interview rounds.
Explanation of how to calculate OEE, use 7QC tools, TMP, productivity, team building, manpower management, SAP module, inventory control, and scrap reduction.
OEE calculation involves multiplying availability, performance, and quality percentages
7QC tools include Pareto chart, fishbone diagram, control chart, etc.
TMP stands for Total Maintenance Productivity and measures maintenance efficiency
Productivity can be calcula...
I applied via Naukri.com and was interviewed in Oct 2022. There was 1 interview round.
based on 9 reviews
Rating in categories
Oprating Engineer
106
salaries
| ₹1.1 L/yr - ₹3 L/yr |
Line Leader
46
salaries
| ₹1.6 L/yr - ₹3.1 L/yr |
Engineer
31
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Senior Engineer
30
salaries
| ₹4.5 L/yr - ₹9.5 L/yr |
Assistant Manager
26
salaries
| ₹6.3 L/yr - ₹12.1 L/yr |
Bosch
JBM Group
Samvardhana Motherson Group
Subros