Filter interviews by
I applied via Campus Placement and was interviewed before Nov 2019. There was 1 interview round.
posted on 26 Sep 2021
I applied via Recruitment Consultant and was interviewed in Mar 2021. There was 1 interview round.
posted on 28 Jun 2021
I applied via Naukri.com and was interviewed in May 2023. There was 1 interview round.
Duty cycle is the ratio of time a system is active compared to the total time.
Duty cycle is often expressed as a percentage.
It is commonly used in engineering to describe the on/off time of a system.
For example, a system with a duty cycle of 50% is on half the time and off half the time.
posted on 7 Dec 2024
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
Kanban is a lean manufacturing system that ensures smooth inventory flow. Material shortage is managed by effective planning and communication with vendors. Manpower is handled by proper training and allocation of resources.
Kanban is a visual system that helps in managing inventory levels and production flow
Effective planning and communication with vendors helps in managing material shortage
Proper training and allocati...
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
I have achieved significant improvements in all 4M areas throughout my career.
Implemented new machine maintenance program resulting in 20% decrease in downtime
Developed new material sourcing strategy resulting in 15% cost savings
Redesigned production line layout resulting in 30% increase in efficiency
Implemented lean manufacturing principles resulting in 25% reduction in waste
Trained and mentored team members resulting...
posted on 15 Jun 2024
Production planning is the process of organizing resources, scheduling tasks, and coordinating activities to ensure efficient production of goods.
Involves determining what products to produce, in what quantities, and by when
Includes creating production schedules, allocating resources, and setting deadlines
Requires coordination between different departments such as procurement, manufacturing, and logistics
Utilizes tools...
MMM in manufacturing stands for Materials, Methods, and Machines.
MMM refers to the three key components in manufacturing processes: Materials, Methods, and Machines.
Materials refer to the raw materials or components used in the production process.
Methods refer to the techniques or processes used to transform materials into finished products.
Machines refer to the equipment or tools used to carry out the manufacturing pr...
I applied via Job Portal and was interviewed before Sep 2021. There were 4 interview rounds.
I expect to utilize my technical skills and knowledge to optimize production processes and ensure efficient operations.
I expect to work closely with the production team to identify areas for improvement and implement solutions.
I expect to monitor production metrics and analyze data to identify trends and areas for improvement.
I expect to collaborate with other departments, such as maintenance and quality control, to en...
based on 4 reviews
Rating in categories
Senior Engineer
1k
salaries
| ₹0 L/yr - ₹0 L/yr |
Lead Engineer
717
salaries
| ₹0 L/yr - ₹0 L/yr |
Technical Trainee
595
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Software Engineer
395
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Technician
317
salaries
| ₹0 L/yr - ₹0 L/yr |
Mahindra & Mahindra
Tractors and Farm Equipment
Escorts Kubota Limited
CNH Industrial